Attachment_8_Bid_Schedule.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Material Handling Equipment (MHE) Maintenance for DLA Disposition Services Kuwait
Solicitation number
SP451019R0001
Issued by

About this file

Attachment 8

View the file

Other files

File Type Posted
Attachments_1,_2,_3_Equipment_Lists.pdf PDF
Attachment_5_-_Past_Perf_Survey.doc DOC document
Attachment_7_-_Contractor_Instructions.pdf PDF
Attachment_6_CAC_Turn-In_Receipt.pdf PDF
Attachment_4_APLs.docx DOCX document
SF1449_SP451019R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

Attachment 8
Bid Schedule
Six month Base with two six month Options

Note: The contractor shall not exceed the cost of any CLIN without the prior approval of the Contracting Officer. Contractor is to track actual hours worked on labor hour CLINs contained in this schedule. Contractor to notify the Contracting Officer in writing when 85% of NTE hours have been used. The contractor shall notify the COR.

CLINDescriptionQtyUnitUnit PriceTotal
0001Initial Base Line (IBL) or Technical Inspection (TI) of Equipment, Non-tactical vehicles. Units must be evaluation/inspection to determine if within OEM standards and specifications. Section 5.0
(Not to Exceed (NTE) CLIN)135Units
0002Initial Base Line (IBL) or Technical Inspection (TI) of Light Sets and Generators Sets. Units must be evaluated and/or inspected to determine whether within OEM standards and specifications. Section 5.0
(Not to Exceed (NTE) CLIN)49Units
0003Preventive Maintenance (PM), Attachment 1. MHE/Vehicles/Equipment/Machinery. Section 6.0 and 7.06Months
0004Preventive Maintenance (PM), Attachment 2. Generator Sets/Light Sets. Section 8.06Months
0005Unscheduled Maintenance, MHE/Vehicles/Equipment/Machinery, Attachment 1, All repairs, (est. including parts and labor). Section 10.0
(Not to Exceed (NTE) CLIN)3,500Hours
0006Unscheduled Maintenance, Generators/Light Sets, Attachment 2, All repairs, (est. including parts and labor). Section 10.0
(Not to Exceed (NTE) CLIN)2,000Hours
0007Scale/Rebridge Maintenance. Section 13.06Months
0008Scale/Rebridge Calibration, Section 13.0
(Not to Exceed (NTE) CLIN)3Units
0009Parts - Unscheduled Maintenance, See section 14.0
(Not to Exceed (NTE) CLIN)125,000Units
0010Drain and Purge. Heavy equipment, i.e., 900 series Trucks, all types of forklift (up to 50k) and tactical vehicles (MRAPs) Dump trucks, Bulldozers, Graders etc, that are received in the yard. Section 15.0
(Not to Exceed (NTE) CLIN)60Units
0011Drain and Purge. Medium equipment, i.e., vehicles of all types and sizes that come into the Disp Svcs Site and are received. NTV/ATV (all types of pick-ups, vans, SUV sedans, bus and ATVS such as Polaris and Gators). Section 15.0
(Not to Exceed (NTE) CLIN)60Units
0012Drain and Purge, Air Conditioners, Air Compressors, Generators up to 50kv. Section 15.0
(Not to Exceed (NTE) CLIN)60Units
0013Welding and Repair Services for Scrap Hoppers. Section 16.0
(Not to Exceed (NTE) CLIN)60Hours
0014NTV Roadside Assistance (involves tire repair or replacement, gas, lockout, stalled vehicle, minor accident-vehicle still drivable). P&L included and work shall be IAW the OEM standards and specifications. Billing per occurrence. Arifjan, Kuwait. Section 17.0
(Not to Exceed (NTE) CLIN)30Units
0015NTV Roadside Recovery of a vehicle to bring to a repair facility and provide a like type vehicle as a loaner, cost of the recovery vehicle/labor included; and work shall be IAW the OEM standards and specifications. Billing per occurrence. Arifjan, Kuwait. Section 17.0
(Not to Exceed (NTE) CLIN)20Units
Base Period Total$0.00
1001Initial Base Line (IBL) or Technical Inspection (TI) of Equipment, Non-tactical vehicles. Units must be evaluation/inspection to determine if within OEM standards and specifications. Section 5.0
(Not to Exceed (NTE) CLIN)135Units
1002Initial Base Line (IBL) or Technical Inspection (TI) of Light Sets and Generators Sets. Units must be evaluated and/or inspected to determine whether within OEM standards and specifications. Section 5.0
(Not to Exceed (NTE) CLIN)49Units
1003Preventive Maintenance (PM), Attachment 1. MHE/Vehicles/Equipment/Machinery. Section 6.0 and 7.06Months
1004Preventive Maintenance (PM), Attachment 2. Generator Sets/Light Sets. Section 8.06Months
1005Unscheduled Maintenance, MHE/Vehicles/Equipment/Machinery, Attachment 1, All repairs, (est. including parts and labor). Section 10.0
(Not to Exceed (NTE) CLIN)3,500Hours
1006Unscheduled Maintenance, Generators/Light Sets, Attachment 2, All repairs, (est. including parts and labor). Section 10.0
(Not to Exceed (NTE) CLIN)2,000Hours
1007Scale/Rebridge Maintenance. Section 13.06Months
1008Scale/Rebridge Calibration, Section 13.0
(Not to Exceed (NTE) CLIN)2Units
1009Parts - Unscheduled Maintenance, See section 14.0
(Not to Exceed (NTE) CLIN)125,000Units
1010Drain and Purge. Heavy equipment, i.e., 900 series Trucks, all types of forklift (up to 50k) and tactical vehicles (MRAPs) Dump trucks, Bulldozers, Graders etc, that are received in the yard. Section 15.0
(Not to Exceed (NTE) CLIN)60Units
1011Drain and Purge. Medium equipment, i.e., vehicles of all types and sizes that come into the Disp Svcs Site and are received. NTV/ATV (all types of pick-ups, vans, SUV sedans, bus and ATVS such as Polaris and Gators). Section 15.0
(Not to Exceed (NTE) CLIN)60Units
1012Drain and Purge, Air Conditioners, Air Compressors, Generators up to 50kv. Section 15.0
(Not to Exceed (NTE) CLIN)60Units
1013Welding and Repair Services for Scrap Hoppers. Section 16.0
(Not to Exceed (NTE) CLIN)60Hours
1014NTV Roadside Assistance (involves tire repair or replacement, gas, lockout, stalled vehicle, minor accident-vehicle still drivable). P&L included and work shall be IAW the OEM standards and specifications. Billing per occurrence. Arifjan, Kuwait. Section 17.0
(Not to Exceed (NTE) CLIN)30Units
1015NTV Roadside Recovery of a vehicle to bring to a repair facility and provide a like type vehicle as a loaner, cost of the recovery vehicle/labor included; and work shall be IAW the OEM standards and specifications. Billing per occurrence. Arifjan, Kuwait. Section 17.0
(Not to Exceed (NTE) CLIN)20Units
Option 1 Total$0.00
2001Initial Base Line (IBL) or Technical Inspection (TI) of Equipment, Non-tactical vehicles. Units must be evaluation/inspection to determine if within OEM standards and specifications. Section 5.0
(Not to Exceed (NTE) CLIN)135Units
2002Initial Base Line (IBL) or Technical Inspection (TI) of Light Sets and Generators Sets. Units must be evaluated and/or inspected to determine whether within OEM standards and specifications. Section 5.0
(Not to Exceed (NTE) CLIN)49Units
2003Preventive Maintenance (PM), Attachment 1. MHE/Vehicles/Equipment/Machinery. Section 6.0 and 7.06Months
2004Preventive Maintenance (PM), Attachment 2. Generator Sets/Light Sets. Section 8.06Months
2005Unscheduled Maintenance, MHE/Vehicles/Equipment/Machinery, Attachment 1, All repairs, (est. including parts and labor). Section 10.0
(Not to Exceed (NTE) CLIN)3,500Hours
2006Unscheduled Maintenance, Generators/Light Sets, Attachment 2, All repairs, (est. including parts and labor). Section 10.0
(Not to Exceed (NTE) CLIN)2,000Hours
2007Scale/Rebridge Maintenance. Section 13.06Months
2008Scale/Rebridge Calibration, Section 13.0
(Not to Exceed (NTE) CLIN)2Units
2009Parts - Unscheduled Maintenance, See section 14.0
(Not to Exceed (NTE) CLIN)125,000Units
2010Drain and Purge. Heavy equipment, i.e., 900 series Trucks, all types of forklift (up to 50k) and tactical vehicles (MRAPs) Dump trucks, Bulldozers, Graders etc, that are received in the yard. Section 15.0
(Not to Exceed (NTE) CLIN)60Units
2011Drain and Purge. Medium equipment, i.e., vehicles of all types and sizes that come into the Disp Svcs Site and are received. NTV/ATV (all types of pick-ups, vans, SUV sedans, bus and ATVS such as Polaris and Gators). Section 15.0
(Not to Exceed (NTE) CLIN)60Units
2012Drain and Purge, Air Conditioners, Air Compressors, Generators up to 50kv. Section 15.0
(Not to Exceed (NTE) CLIN)60Units
2013Welding and Repair Services for Scrap Hoppers. Section 16.0
(Not to Exceed (NTE) CLIN)60Hours
2014NTV Roadside Assistance (involves tire repair or replacement, gas, lockout, stalled vehicle, minor accident-vehicle still drivable). P&L included and work shall be IAW the OEM standards and specifications. Billing per occurrence. Arifjan, Kuwait. Section 17.0
(Not to Exceed (NTE) CLIN)30Units
2015NTV Roadside Recovery of a vehicle to bring to a repair facility and provide a like type vehicle as a loaner, cost of the recovery vehicle/labor included; and work shall be IAW the OEM standards and specifications. Billing per occurrence. Arifjan, Kuwait. Section 17.0
(Not to Exceed (NTE) CLIN)20Units

Option 2 Total $0.00