SP4500-19-R-0007_-_Solicitation.pdf
PDF 3 MB Posted
- Solicitation number
- SP450019R0007
- Issued by
-
Defense Logistics Agency
About this file
solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4_-_RRAD_Report.pdf | ||
| SF30_SP450019R00070002_Amendment_3.pdf | ||
| SF30_SP450019R00070001_Amendment_1.pdf | ||
| one_year_ordering_history_15D02_HIN_Summary.rtf | RTF text file | |
| ATT_CAC_Procedures.pdf | ||
| ATT_ACRONYMS.pdf | ||
| SP4500-19-R-0007_-_Solicitation.pdf | ||
| ATT_PPI__Offeror_Questionnaire.pdf | ||
| Gulf_Coast_Regional_Price_Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
1000073478
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER
SP4500-19-R-0007
6. SOLICITATION ISSUE
DATE
2019 May 17
a. NAME
Raymond Empie PLCLE16
b. TELEPHONE NUMBER (No Collect calls)
Phone: 269-961-5034
8. OFFER DUE DATE/
LOCAL TIME
2019 June 17
9. ISSUED BY CODE SP4500
DLA DISPOSTION SERVICE - EBS
DLA DISP SVCSS HAZ CONTRACT
74 NORTH WASHINGTON
BATTLE CREEK MI 49037-3092
USA
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
8 (A)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
NAICS: 562211
SIZE STANDARD:
11. DELIVERYFOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/ CODE
OFFEROR
FACILITY
CODE
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See Schedule
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
SEE SCHEDULE
0200 PM
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE ADDENDUM
EDWOSB
SP4500-19-R-0007 1 of 120
Notes to Offerors
1. This contract is referred to as the “Gulf Coast Regional contract, Servicing Department of Defense (DOD) Installations in the states of Alabama, Florida, Louisiana, Mississippi and Texas, and surrounding areas. Work will consist of the removal, transportation and disposal of Resource Conservation and Recovery Act (RCRA) hazardous wastes, non-RCRA wastes, State-Regulated wastes, Non-State Regulated wastes, Universal Wastes, Compressed Gas Cylinders, and Polychlorinated Biphenyls (PCBs).
2. This request for proposal (RFP) consists of one price schedule, Attachment 1.
A. Offerors must furnish prices for the entire price schedule including the base and option period.
B. An omission of any line item pricing may result in the offer being considered non-responsive and will not be considered for award.
C. In the event of a discrepancy in the calculation of the extended amount, the Government will multiply the offeror’s unit price shown by the estimated quantity to ascertain the extended amount proposed.
D. Zero ($0.00) unit pricing will be considered non-conforming and will not be considered for award.
3. Within 14 calendar days after Award, the Contractor shall provide DLA Disposition Services with a list referencing all intended interim and final disposal/recycle facilities by EPA ID number (where applicable) for every Base CLIN listed in the Price Schedule of this contract; see Facility-CLIN Assignment Sheet. The purpose for this is to allow the Government to assign in DSS those facilities that will or might receive those CLINs for treatment, storage, and disposal.
4. The email address for submission of offers is HazardousContractsEast2@dla.mil and raymond.empie@dla.mil. All offers submitted will receive a confirmation email from one of the POC's listed above. If you do not receive a confirmation email, contact Raymond a. Empie at 269- 961-5034 before the close of the solicitation.
5. Please note the updated details for payment of PCBs/Demil/CODS. See PWS 8.1 and 8.2
6. All questions regarding this solicitation must be received no later than 1200 EST June 7, 2019. Any questions submitted after this date may not be addressed.
7. Disregard the Technical Requirements section of this solicitation.
SP4500-19-R-0007 2 of 120
Contractor Officer Representative POC Phone Number
DLA Disposition Services Eglin Ben Benavides (850) 882-2227
DLA Disposition Services Eglin Neil Miller (850) 882-2824
DLA Disposition Services Eglin Kylee Turley (850) 389-3404
DLA Disposition Services Gulfport Cobb, Wayne Johnny (Johnny) (228) 871-3496
DLA Disposition Services Anniston Phil Cathey phillip.cathey@dla.mil (235) 575-7136
DLA Disposition Services Anniston Debbie Carr Debbie.Carr@dla.mil (256) 343-3922
DLA Disposition Services Anniston Jason Mattson Jason.Mattson@dla.mil (256) 294-3532
SP4500-19-R-0007 3 of 120
FACILITY NAME EPA ID DODAAC
Ft. Rucker Bldg. 1207 Ft. Rucker, AL 36362
AL6210020776
W58QRU /
W90FJB /
W31BMY
Cairns Army Airfield Bldg. 30807 Ft. Rucker, AL 36362
AL9210090040
W90FJB
Shell Army Helipt Bldg. 60102 Ft. Rucker, AL 36362
AL2210090039
W90FJB
NAS Pensacola 310 John Towers Rd (Bldg. 3560) Pensacola, FL 32508
FL9170024567
N00204
Corry Field 310 John Towers Rd {Bldg. 3560) Pensacola, FL 32511
FL4170023713
N00204
Saufley Field 310 John Towers Rd. Bldg. 3560 Pensacola, FL 32509
FL3170023797
N00204
NSA Panama City 1500 Thomas Drive (Bldg361) Panama City, FL 32407
FL8170023792
N61331/N6100
SP4500-19-R-0007 4 of 120
NAS Whiting Field 7183 Langley St Milton, FL 32570-6159 FL2170023244
N60508
FT Combs NGA 66 4th St Apalachicola, FL 32329-0158
FLD984219204
Nat Guard Armory 308 West North Ave Bonifay, FL 32425-0157
FLD982077133
749 7th St Chipley, FL 32428-1932
FLD984184945
OMS 6
753 7th St Chipley, FL 32428-1281
FLD984184945
1518 E. James Lee Blvd Crestview, FL 32539-3213
FL0000360768
3645 Hwy 90 west Tyndall AFB, FL 32403
Navy Hospital Pensacola 310 John Towers Rd (Bldg. 3560) Pensacola, FL 32508
FL9170024567
SP4500-19-R-0007 5 of 120
Tallahassee ARC (FL165) 4307 Jackson Bluff Road Tallahassee, FL 32304
Whiddon ARC (FL040) 222 Ausley Road
BMA 151 (G) (FL135)
222 Ausley Road
TMO
Bldg. 1241 MCLB Albany, GA 31704-5000
Central Ace Pt Bldg. 5251 Barksdale AFB, LA 71110
LA9571924050
USARC ECS - 17 Bldg. 8315 LA009 2370 K Ave Ft. Polk, LA 71459
LAD981054521 W589QS
Michaud USARC 4200 Michaud Blvd New Orleans, LA 70146-3601
Diamond USARC 5010 Leroy Johnson Drive New Orleans, LA 70146-3601
LAR000043208
SP4500-19-R-0007 6 of 120
Fleming USARC Intermed Staging England Air Park/Ft. Polk Alexandria, LA 0
NAS Joint Reserve - Tenant in AFRC with Naval Reserve as lead (Belle Chase/LA038) 400 Russell Ave New Orleans, LA 70143
LA6170022788
NSA West Bank 2300 General Meyer Ave New Orleans, LA 70142
LA8170022604
NSA East Bank 4400 Dauphine St New Orleans, LA 70146
LA5213599314
LA Nat Guard 34899 Grantham College Drive Slidell, LA 70460
LAD981054679
525 Industrial Pkwy (OMS 7) Bogalusa, LA 70427
LAD985220698
703 E Street (MATES 93) Pineville, LA 71360
LAD981054661
SP4500-19-R-0007 7 of 120
495 3d St (USPFO) Pineville, LA 71360
LAR000003798
6401 Stars & Stripes Blvd New Orleans, LA 70126
LAD981054489
LA NG AASF l 8521 K St MATES 71 Ft. Polk, LA 71459
LAD981054521
625 Park Drive 1083 Trans Vivian, LA 71082
5445 Point Clair Rd 415 MI BN Carville, LA 70721
202 Balsa St (1086 Trans) Bunkie, LA 71322
267 Natl Guard Rd (1086 T) Vidalia, LA 71373
Vocational Drive #2 (1086 Trans) Ville Platte, LA 70586-4410
SP4500-19-R-0007 8 of 120
610 Dorothy St (1087 Trans) Jonesville, LA 71343-2402
LA Nat Guard 1855 Ames Blvd (2225 Bridge) Marrero, LA 70072
LA Nat Guard 742 Ohio St (528 Engr. BN) Delhi, LA 71232
LA Nat Guard 2900 S. Magnolia St (769 Engr) Baker, LA 70714-3405
LA Nat Guard Waddil & Fair St (769 Engr. BN) Marksville, LA 71351-0366
LA Nat Guard 412 s. Irma Blvd (769 Engr. BN) Gonzales, LA 70737-3610
LA Nat Guard 500 Fairground (108 Cav) Natchitoches, LA 71457-3057
LA Nat Guard 1756 San Antonio (108 Cav) Many, LA 71449-3321
SP4500-19-R-0007 9 of 120
5500 Coliseum Blvd (199 Spt.)
Alexandria, LA 71301-3707
LA Nat Guard 520 E Main St (199 Spt. BN) Jonesville, LA 71251-3208
LA Nat Guard 457 Richardson Drive (199 Spt.)
Colfax, LA 71417
LA Nat Guard 729 Cemetery St (199 Spt.)
St. Martinville, LA 70582-0138
LA Nat Guard Industrial Park (1-156 AR) Coushatta, LA 71019-0689
LA Nat Guard 751 S Ninth St (3-156 Inf.)
Eunice, LA 70535-5213
LA Nat Guard 1017 Hwy 749 (1088 Engr. BN) Opelousas, LA 70570-1017
LA Nat Guard 303 Park Ave (1088 Engr. BN) New Roads, LA 70760-0087
SP4500-19-R-0007 10 of 120
LA Hwy 1 (1088 Engr. BN) Napoleonville, LA 70390-0037
LA Nat Guard 321 Houma St (1088 Engr. BN) Donaldsonville, LA 70346-0021
B Street CES/CEV 607 Parade Lane Keesler AFB, MS 39534
MS2570024164 FH3010
14th CES/CEVC 555 Simler Blvd Columbus, MS 39710-6010
MS7570024060
186th ARW 6225 M. St (Bldg. 104) Meridian, MS 39307-7112
MS5572825904
MS ANG CRTC
4 715 Hewes Ave {Bldg. 1) Gulfport, MS 39507-4324
MS6570090013 FH6243
NAS
Public Works Meridian, MS 39309-5003
MS1971590012
USARC lf3 502 North St Jackson, MS
SP4500-19-R-0007 11 of 120
USARC
2012 Sandy Lane Laurel, MS 39443-8650
Clarksdale USARC 30 Airport Rd Lyon, MS 39440-0469
Harris-Lockhard 5701 Old US Hwy 80 W Meridian, MS 39305-6106
USARC
3622 Jefferson Av Pascagoula, MS 39563-6244
Guy II & W Jones 343 Hwy 12 West Starkville, MS 39759-3632
Joe Harris Towery 1115 S. Gloster St Tupelo, MS 38801-6533
USARC #1
1000 Lee St Vicksburg, MS 39180-4958
412 Engr. USARC 1265 Porters Chapel Rd Vicksburg, MS 39180
SP4500-19-R-0007 12 of 120
Camp Shelby ARC 704 Jackson Ave W.
Camp Shelby, MS 39401
MSD981749401 W35KT6
AMSA # 144
Route 1, Box 462, US Hwy 82 Greenwood, MS 38930-9624
Beaumont Port 1255 Main St Beaumont, TX 77701-3610
NAS Whiting Field 5499 Old River Rd.
Milton, FL 32583
New point of generation. EPA ID Number will be applied for.
N60508
OLF
Choctaw Filed Rd.
Navarre, FL 32566
New point of generation. EPA ID Number will be applied for.
N60508
NCBC Gulfport 2401 Upper Nixon Ave.
Gulfport, MS 39501
MS2170022626 N62604
NAVAL OCEANGRAPHIC OFFICE
1002 Balch BLVD.
Stennis Space Center, MS 39522
MS6171624640 N62306
Columbus AFB 14 CES/CEAN Columbus AFB 555 Similer Blvd. Suite 114 Columbus AFB, MS 39710-6010
MS7570024060
SP4500-19-R-0007 13 of 120
186th Air Refueling Wing Meridian MS 8225 M Street Meridian, MS 390307
MS5572825904
PW Environmental Division-NAS Meridian 429 Allen Road Meridian, MS 39309
MS1971590012
W2R2 USA ENGR R and D CTR Waterways Experiment Station 3909 Halls Ferry Road Vicksburg, MS 39180-6133
MS6210809871
172nd Airlift Group 141 Military Dr.
Jackson, MS 39208
MSD982769903
Joint Maritime Test Facility (JMTF) 15 W 15th Street Mobile, AL 36615
Z51400
Naval Hospital Pensacola 6000 HWY 98 West Pensacola, FL 32512
SP4500-19-R-0007 14 of 120
0.0 PERFORMANCE WORK STATEMENT (PWS)
1.0 REMOVAL PHASES
1.1 PRE-REMOVAL
1.1.1 CLIN SELECTION CRITERIA
1.1.1.1 CLIN DISPUTES
1.1.2 PERMIT/SPECIAL REQUIREMENTS
1.1.2.1 REPORTING REQUIREMENTS
1.1.3 SHIPPING/DISPOSAL DOCUMENTATION
1.1.4 NOTIFICATIONS
1.1.5 TRAILER SECURITY
1.1.6 HOURS OF OPERATION
1.1.7 PUBLIC AFFAIRS COORDINATION
1.1.8 DBIDS INSTALLATION ACCESS
1.1.9 ENVIRONMENTAL MANAGEMENT SYSTEM
1.1.10 CONTRACTOR PERSONNEL
1.2 REMOVAL
1.2.1 SPILL RESPONSIBILITY
1.2.2 SEGREGATION OF HAZARDOUS WASTE
1.2.3 STATEMENT ON CONTAINERS
1.2.4 GOVERNMENT EQUIPMENT & PERSONNEL
1.2.5 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT
FACILITY
1.2.6 LOADING
1.2.7 WEIGHING OF ITEMS
1.2.7.1 TASK ORDER ADJUSTMENTS
1.2.8 DEFINITIONS, BULK & CONTAINERIZED WASTE
1.2.8.1 BULK WASTE
1.2.8.2 CONTAINERIZED WASTE
1.2.9 BULK LIQUID PUMPING
1.2.10 BULKING & CONSOLIDATION
1.2.10.1 AFFF CONCENTRATES, RINSATES, AND SOLIDS
1.2.11 CHARGES FOR EXPEDITES
1.2.12 OVERPACKING FOR COMPLIANCE
1.2.13 PACKAGING/REPACKAGING FOR COMPLIANCE
1.3 POST REMOVAL
1.3.1 RETURN OF SHIPPING DOCUMENTATION
2.0 DISPOSAL/RECYCLING
2.1 CERTIFICATES OF DISPOSAL, DESTRUCTION, & RECYCLING
2.2 EMPTY CONTAINERS
2.3 DISPOSAL OF PCB-RELATED WASTE
2.4 RESERVED
2.5 COMPRESSED GAS CYLINDERS, CARTRIDGES, VESSELS & CANNISTERS
2.5.1 EVALUATION/IDENTIFICATION OF
CYLINDERS/VESSELS/CANISTERS
SP4500-19-R-0007 15 of 120
2.5.2 ANALYSIS TO IDENTIFY CYLINDER CONTENTS
2.5.3 RECONTAINERIZATION/REPLACEMENT OF VALVES
2.5.4 ZONE “A” POISON GASES
2.5.5 TRANSPORTATION OF CYLINDERS TO ODS RESERVE,
RICHMOND, VA
2.6 RECYCLING OR RECOVERY
2.6.1 COMMODITY SPECIFIC RECYCLING/RECOVREY REQUIREMENTS
2.7 DEMILITARIZATION
2.7.1 DEMILITARIZATION OF SUBMARINE TILES
2.7.2 OTHER MILITARY ITEMS
3.0 MANAGEMENT SERVICES
3.1 RESERVED
3.2 TANK & WASH RACK CLEANING
3.3 PERFORM ANALYSIS
3.4 PREPARE WASTE PROFILE SHEET
3.5 IDENTIFY UNKNOWN WASTE STREAMS & PREPARE WASTE
PROFILE SHEETS
3.6 PROVIDE ROLLOFF BOX (ROB), VACUUM BOX, OR FRAC TANK WITH
RENTAL FEES
3.6.1 DAILY RENTAL FEE FOR A 20-, 30-, and 40-YD3 LINED ROLLOFF
BOX (ROB)
3.6.2 MONTHLY RENTAL FEE FOR A 20-, 30-, and 40-YD3 LINED
ROLLOFF BOX (ROB)
3.6.3 ANNUAL RENTAL FEE FOR A 20-, 30-, and 40-YD3 LINED ROLLOFF
BOX (ROB)
3.6.4 DAILY RENTAL FEE FOR A 20- or 25-YD3 VACUUM BOX
3.6.5 MONTHLY RENTAL FEE FOR A 20- or 25-YD3 VACUUM BOX
3.6.6 MONTHLY RENTAL FEE FOR A FRAC TANK WITH SECONDARY
CONTAINMENT
3.6.7 ANNUAL RENTAL FEE FOR A FRAC TANK WITH SECONDARY
CONTAINMENT
3.6.8 MOVE EMPTY ROLLOFF BOX (ROB), VACUUM BOX, OR FRAC
TANK WITHIN INSTALLATION
3.7 LAB PACKING SERVICES
3.8 PERFORM WASTE MANAGEMENT- RELATED SERVICES SUPPORT
3.9 BULK NON-RCRA WASTEWATER MANAGEMENT
3.10 RESERVED
3.11 MANAGEMENT SERVICES LITTLE SAND ISLAND
3.12 RESERVED
3.13 STABILIZATION OF ORGANIC PEROXIDE & MEKP PRODUCTS
3.14 VACUUM TRUCK WITH OPERATOR
3.15 SUPER VACUUM TRUCK WITH OPERATOR
3.16 PERFORM MANAGEMENT SERVICE – VAPOR/GAS FREE
CERTIFICATION
SP4500-19-R-0007 16 of 120
4.0 ACCEPTABLE PERFORMANCE LEVEL (APL)
4.1 ACCEPTABLE PERFORMANCE LEVEL (APL) TABLE
5.0 QUALIFIED FACILITIES LIST AND QUALIFIED TRANSPORTERS LISTS
5.1 FACILITIES AND TRANSPORTERS
5.2 FACILITY REMOVAL
5.3 TRANSPORTER REMOVAL
6.0 ADDITIONAL REQUIREMENTS
6.1 INDEMNIFICATION
6.2 PACKING, MARKING AND LABELING
6.3 PLACES OF GOVERNMENT INSPECTION
6.4 CONTRACTOR REPRESENTATIVE
6.5 INCIDENTAL FEES
6.6 MANPOWER REPORTING REQUIREMENTS
7.0 PERIOD OF PERFORMANCE INCLUDING DISPOSAL AND REMOVAL
7.1 EXPEDITED REMOVAL/PERFORMANCE
8.0 DOCUMENTATION REQUIREMENTS, DLA DISPOSITION SERVEICES
ACCEPTANCE, INVOICING AND TRACKING
8.1 SUBMISSION OF DOCUMENTATION TO FACILITATE ACCEPTANCE FOR
PAYMENT
8.2 ACCEPTENCE AND INVOICING
8.3 CONTRACT MINIMUM/MAXIMUM
8.4 CONTRACTOR ACCESS TO DLA DISPOSITION SERVICES SITES
8.5 PERIOD OF PERFORMANCE
SP4500-19-R-0007 17 of 120
0.0 PERFORMANCE WORK STATEMENT (PWS)
a. This contract is referred to as the “Gulf Coast Regional” HW Disposal Contract. Work will consist of the removal, transportation and disposal of RCRA hazardous wastes, non-RCRA wastes, State-Regulated wastes, Non-State Regulated wastes, Universal Wastes, Compressed Gases, and Polychlorinated Biphenyls (PCBs) located on or around military installations or within a 50 mile radius of any pick up point listed on this contract in the states of Alabama, Florida, Louisiana, Mississippi and Texas. The Contractor is cautioned that some requirements for information are required before start of work on this contract, i.e., Sections 1.1.2, 1.1.8 and 3.7.
b. This contract consists of one (1) 30-month Base Period, followed by one (1) 30-month Option Period.
c. Pricing for containerized waste will largely be based upon container sizes and the assigned disposal profile, rather than pricing on a per pound basis. The exception is bulk wastes as defined in Section 1.2.8.1 and containerized waste with the suffix C7.
d. This contract is a firm-fixed price indefinite delivery/indefinite quantity (IDIQ) contract written as a performance based contract and allows the Contracting Officer (KO) to make monetary deductions and/or a negative mark on the Contractor’s Past Performance when an Acceptable Performance Level (APL) is not met.
e. The Government agrees that all items placed on a Task Order (TO) on this contract will be accompanied by documentation and markings that comply with all applicable local, state, and federal laws and regulations relating to the generation, storage and transportation of waste.
f. The Contractor agrees to provide all services necessary for the transportation, final treatment, disposal, and/or recycling of the items listed in the schedule in accordance with (IAW) all local, state, and federal laws and regulations, and the terms and conditions of this contract.
These services shall include all necessary personnel, including applicable Subcontractors, labor, transportation, equipment, and the compilation and submission of all documentation required by this contract. All items, regardless of the condition, are being discarded by the Government and will require recycling or disposal as identified via the ordered Contract Line Item Number
(CLIN).
g. The six-character disposal CLIN consists of two parts. The term “Base CLIN” refers to the first four characters of the CLIN. The Base CLIN represents the waste description according to the waste profile for a particular waste stream. The term “CLIN Suffix” refers to the last two characters of the CLIN. The CLIN Suffix designates the unit of measure for
SP4500-19-R-0007 18 of 120 purposes of tracking and Contractor payment. Example: Base CLIN “CS01” represents Corrosive Acids, Inorganic other than HF and HNO3, <50% in Water, and the CLIN Suffix “C4” designates the unit of issue as a 55-Gallon Container. Accordingly, one (1) 55-gallon drum of this waste would be represented by ordering one (1) Each of CLIN CS01C4. General information of Profile Based CLINs may be found at:
http://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/HazWasteDisposal.as px for more details.
h. Some CLINs ordered under this contract require the Contractor to provide Certificates of Destruction or Disposal (CD), e.g., certain Demilitarization items and PCB-related wastes.
The Contractor is cautioned to closely read all CLIN descriptions where such requirements are indicated. Unless explicitly required and written into this contract, only those CLINs requiring CDs, as described in the Price Schedule, will require that the Contractor provide a CD, See section 2.1.
i. Publications and attachments applicable to this contract will be made available upon request. It should be noted that during the solicitation and life of this contract, the Government may make changes, additions, and/or deletions to those listed.
j. The Contractor is specifically cautioned that all tank cleaning CLIN quoted prices will include provision for necessary personnel, Material Handling Equipment (MHE), Personal Protective Equipment (PPE), confined space entry if applicable, and all equipment used to perform these services. The Contractor should bid accordingly.
k. Generators are responsible for ensuring their containerized wastes sent for disposal via this contract are in Department of Transportation (DOT) shippable packaging.
l. Minimum TO charges under this contract will be $2,500.00, except where exceptions are otherwise specified in the contract, including but not limited to, some management services and all expedited removals and performance.
1.0 REMOVAL PHASES
The requirements for removal of wastes under this contract are divided into three main phases:
Pre-Removal (1.1), Removal (1.2), and Post-Removal (1.3). The Contractor and their Subcontractors must perform at all times in a prudent, conscientious, safe, and professional manner. The Contractor shall ensure that its agents, employees, and Subcontractors involved in handling and packaging the hazardous waste be trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. The Contractor shall provide all MHE and PPE, unless otherwise stated. The MHE and PPE must be appropriate to safely handle the hazardous waste to include meeting any additional military installation specific requirements. The Contractor agrees that all personnel and equipment used in the performance of this contract are subject to safety inspections by Government personnel while on federal property.
1.1 PRE-REMOVAL
SP4500-19-R-0007 19 of 120 http://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/HazWasteDisposal.aspx
1.1.1 CLIN SELECTION CRITERIA
CLINs are assigned to waste streams by the Government, and are designed around EPA RCRA regulations, treatment, and technology standards. Department of Transportation (DOT) regulations, including Proper Shipping Name (PSN) and Hazard Class are not a basis for CLIN selection. The waste description, generation process, physical state, and EPA Waste Code(s) are the primary considerations for CLIN selection. CLIN selection begins with the identification of a Base CLIN category and sequence number. It is selected, if available, from the Price Schedule, and is completed with the assignment of a CLIN suffix.
a. Base CLIN categories and their descriptions used for waste disposal CLINs under this contract are as follows:
(1) Batteries (BA) – Used for all battery types, some or all of which may be turned in as Universal Waste (UW) where no EPA Waste Codes are assigned, or as Hazardous Waste (HW), where applicable EPA Waste Codes are assigned.
(2) Corrosives (CS) – Used for all corrosive wastes meeting the EPA definition of corrosive and carrying the EPA Waste Code D002, unless it is a Lab Pack/Loose Pack, or unless the waste is concurrently assigned a D001 (ignitable) or D003 (reactive) Waste Code.
Some corrosive acid oxidizers may carry the D001 Waste Code and be assigned a CS CLIN.
(3) Compressed Gas Cylinders/Cartridges (CY) – Used for all types of compressed gas cylinders, vessels, canisters and cartridges. Base CLINs are assigned based on the specific chemical name of the gas or gases comprising the contents of the cylinder, vessel or canister. Cartridges are assigned Base CLINs based on whether the gas is flammable or inert.
(4) Flammable/Combustible/Ignitable (FL) – Used for all ignitable and other than reactive or corrosive oxidizers carrying the D001 Waste Code, unless it is a Lab Pack or Loose Pack containing other than paint-related materials, or unless the waste is concurrently assigned a D003 (reactive) Waste Code. FL CLINs may also be assigned to waste streams not carrying the D001 Waste Code, but containing flammable/combustible/ignitable constituents such as organic solvents or chemicals.
(5) Lab Packs/Loose Packs (LP) – Used for most overpacked small containers of chemicals and consumer commodity-type products. “Lab Pack” refers predominantly to the overpacking of multiple containers of like laboratory chemicals into a single outer container.
The chemicals must be of the same DOT hazard class and a detailed inventory must be affixed to the outer container. Lab packing is a packaging method performed by the Contractor (or Subcontractor) under a separate service CLIN. “Loose Pack” refers predominantly to the overpacking of multiple containers of like consumer commodity products (e.g., paints, lubricants, expired products, etc.) into a single outer container and does not require the preparation of a detailed inventory. Generators of this waste may be authorized to loose-pack containers for turn-in. Lab-packed and loose-packed drums and boxes containing smaller containers of same type wastes provide the best alternative when consolidation is impractical.
SP4500-19-R-0007 20 of 120
For purposes of disposal, Lab Packs and Loose Packs share the same Base CLIN depending upon the contents of the inner containers and their assigned EPA Waste Code(s) when applicable.
(6) Non-RCRA, Non-State and State-Regulated (NR) – Used for wastes that are not deemed hazardous under the United States Environmental Protection Agency (USEPA) Resource Conservation and Recovery Act (RCRA) regulations and carry no USEPA Waste Code(s). Some such wastes may be State regulated and may carry state-specific Waste Code(s).
The Contractor is required to comply with state regulations, as applicable, in the management of such non-RCRA hazardous wastes.
(7) PCB-Related (PC) – Used for all wastes containing or contaminated by a source of polychlorinated biphenyls (PCBs) that is equal to or greater than 50 parts per million (ppm) and regulated under the Toxic Substances Control Act (TSCA). Some Generators of PCB-related wastes may choose to utilize “PC” Base CLINs, even when PCB concentrations fall below regulatory thresholds. Additionally, some states regulate PCB-related wastes to a concentration threshold that is lower than 50 ppm. The Contractor is required to comply with state regulations, as applicable, in the management of such PCB-related wastes.
(8) Recycle/Recovery (RE) – Used for various wastes that require by contract and/or regulation the recycling/recovery of constituents and/or components contained in the waste stream, including some universal wastes, lamps, high mercury devices and residues, antifreeze, used oil, oil filters, and fully drained fuel filters. When “RE” CLINs are ordered, the Contractor is required to recycle/recover the waste under which the CLIN was ordered.
(9) Reactive (RX) – Used for various reactive wastes bearing the D003 Waste Code or potentially bearing reactive characteristics. All wastes bearing the D003 Waste Code will be turned in for disposal using an “RX” Base CLIN, with the exception of waste also contaminated by a source of PCBs that is equal to or greater than 50 ppm.
(10) Toxic (TX) – Used for various toxic wastes that are not also ignitable, corrosive, and/or reactive waste bearing the D001, D002, and/or D003 Waste Codes, respectively, with the exception of hexavalent chromium (Cr+6) related waste bearing the D001 Waste Code exclusively due to the oxidizing properties of Cr+6.
b. Base CLIN selection criteria is further based upon information found in the waste profile sheet to include the waste description, physical state of the waste, and the presence of EPA Waste Code(s) assigned (only to regulated HW). Every Base CLIN offered to Generators for use in the Price Schedule has corresponding permissible EPA Waste Code(s), unless the CLIN is for Non-RCRA regulated waste. Permissible EPA Waste Codes for purposes of this contract are those Waste Code(s) identified in the Master Base CLIN Catalog and/or Price Schedule of this contract in the column so titled. Permissible EPA Waste Codes does not imply that any or all of those waste codes so listed will apply, but that no other Waste Code(s) are allowed to be carried for the waste under the assigned CLIN. Furthermore, the term “Listed" for purposes of this contract does not imply that all EPA Listed Waste Codes may apply.
Uncommon EPA Listed Waste Codes may be handled on a case-by-case basis, with consideration given to those Waste Codes that are permitted and accepted by the Contractor’s
SP4500-19-R-0007 21 of 120
TSDF of choice. The Government will ensure that all wastes being turned in for removal will carry only EPA Waste Code(s), if any, which are listed as permissible under this contract. The Government is responsible for assigning proper profile-based CLINs to every waste stream being turned-in for removal. See Master Base CLIN Catalog link at http://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/HazWasteDisposal.as px for additional information.
A Base CLIN is generally authorized for use by the Government when the subject waste meets the waste description, physical state, and permissible EPA Waste Codes, as specified for that CLIN in the contract. Base CLINs will be selected using the following Waste Codes and other descriptions as the order of precedence:
(1) PCB-Related, Containing or Contaminated by a Source >50 ppm
(2) Reactive (D003)
(3) Ignitable/Oxidizer (D001), other than Cr+6 related waste bearing the D001 Waste Code exclusively due to the oxidizing properties of Cr+6.
(4) Corrosive (D002)
(5) Toxic (D004-D043)
(6) Acutely Hazardous (P-Listed)
(7) Leachate (F039)
(8) Electroplating-Related (F006-F012, F019)
(9) Spent Solvent (F001-F005)
(10) Other F-Listed
(11) U-Listed
(12) K-Listed
(13) State-Regulated Waste, Non-RCRA
(14) Non-RCRA, Non-State Regulated Waste
c. Base CLIN sequence number – Refer to the Master Base CLIN Catalog.
d. CLIN Suffix – Refer to the following charts.
SP4500-19-R-0007 22 of 120
e. Recycle/Recovery Base CLINs beginning with “RE” are designated for mandatory recycling/recovery by the Government. If the Contractor asserts that a waste designated for recycling cannot be recycled because it does not meet the required recycling parameters:
(1) The Contractor must notify the KO in writing at least five (5) business days before pickup, of the rationale and proof for waste rejection. This must include written input from at least two recycling facilities listed on the Qualified Facilities List (QFL), at least one of which is not owned by the Contractor.
NOTE: Unless prohibited by State regulations, fuels blending will meet the recycling/recovery requirements for certain wastes, including solvents, paints, antifreeze, and used oil.
(2) The KO will notify the COR to resolve requests to change the assigned mandatory recycling CLIN to the appropriate disposal CLIN. The final decision to change a mandatory recycling CLIN to a disposal CLIN is solely that of the Government. If the Government agrees with the CLIN change, the applicable disposal CLIN will be assigned.
1.1.1.1 CLIN DISPUTES
a. CLIN discrepancies noted on a TO during a pre-removal inspection and/or during removal by the Contractor will be addressed immediately via the COR and the Generator. If the COR and the Generator concur with the CLIN change request, a TO Modification will be issued.
b. The Government may unilaterally issue TO modifications for such reasons as quantity changes, noun description changes, CLIN changes, adding/deleting TO lines, extending TO end dates, etc. The Contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If upon receipt of a unilateral TO modification, the Contractor does not agree with the change or changes, the Contractor reserves the right to seek resolution with the KO. These modifications are only against TOs. No changes are made to the terms and conditions of the contract.
c. If the Contractor asserts after removal that an inappropriate CLIN has been assigned, the burden of proof lies with the Contractor. The Contractor must provide documentation electronically to the KO and the COR within 14 days from the Treatment, Storage and Disposal Facility (TSDF) receipt date supporting the assertion through independently acquired laboratory analysis at the Contractor’s expense, TSDF fingerprinting results, Safety Data Sheet, and/or other written supporting documentation such as a TSDF “off-spec” notification. Requests for a CLIN change without supporting documents will not be accepted. After review of the documentation, the Contractor will be notified by the KO of the Government’s final determination.
d. If the Contractor asserts that an inappropriate CLIN has been assigned, that no existing contract CLIN is appropriate, and a new CLIN needs to be added to the contract, the burden of proof lies with the Contractor. The Contractor must provide documentation electronically to the
SP4500-19-R-0007 23 of 120
KO and the COR within 14 days from the TSDF receipt date supporting the assertion through independently acquired laboratory analysis at the Contractor’s expense, TSDF fingerprinting results, Safety Data Sheet, and/or other written supporting documentation such as a TSDF “off-spec” notification. Requests for a CLIN change without supporting documents will not be accepted. After review of the documentation, the Contractor will be notified by the KO of the Government’s final determination.
e. The Contractor must ensure that the waste in question is not treated or disposed of until the Government has made a final CLIN determination. If the subject waste has been treated and/or disposed of prior to the Government’s final determination, the Contractor will be deemed to have waived its objection to the CLIN assignment.
1.1.2 PERMIT/SPECIAL REQUIREMENTS
a. Without additional expense to the Government, The Contractor shall be responsible for paying all fees, preparing or obtaining any necessary licenses, permits, notifications, waste profiles, or reports, which result from a Contractor’s transportation, recycling, or disposal decision. This includes any fees associated with requirements of the Environmental Protection Agency (EPA) national electronic manifest (e-Manifest) system. This includes acquiring any required permits or registrations necessary to operate on any installation listed in this contract and completing the Notification of Regulated Waste Activity form for the Generator(s) of hazardous waste to sign and file with the applicable state regulators for waste disposal. This includes signing (on behalf of the Government) waste profiles requested by TSDF. All Contractor-signed waste profile sheets shall be written for the actual waste stream using the Generator’s profile for backup documentation. All Generator forms or other means of notifications including correspondence with federal or state agencies on behalf of a Generator must be coordinated with and concurred with by the affected Generator prior to submission to any federal or state agency. A copy of all forms and relevant documentation, including correspondence shall be provided to the COR.
b. The Contractor may be required to attend special training, seminars, instructions, classes, safety orientations, etc., provided by the Government or to provide information to perform work or gain access to the installation. Example: pass and ID requirements, antiterrorist training, Environmental Management System (EMS) policies, and/or forklift training.
c. The Contractor and any Subcontractor(s) shall use only the facilities and transporters currently (at the time) listed in the Defense Logistics Agency Disposition Services (DLADS) Qualified Facilities List (QFL) and Qualified Transporters List (QTL), per Section 5.
d. Any import or export shipment outside the United States must comply with all international agreements and all applicable foreign laws. If the Contractor will be exporting directly from the DOD activity, the Contractor is required to provide a current copy of the Acknowledgment(s) of Consent to the COR with the shipping documentation.
e. The Contractor may not ship waste outside of the United States to circumvent Environmental Protection Agency (EPA) Land Disposal Restrictions (LDR) unless domestic
SP4500-19-R-0007 24 of 120 treatment capability does not exist or domestic facilities are unable to meet EPA LDR requirements within the United States (e.g., Lithium batteries). High level mercury (>260 mg/kg) will not be exported outside the United States.
1.1.2.1 REPORTING REQUIREMENTS
a. If the Contractor uses a TSDF which requires the Generator(s) of hazardous waste to register with an out-of-state hazardous waste management facility prior to utilizing the facility, then the Contractor must adhere to the requirements of Section 1.1.2.
b. The Contractor shall prepare and provide a Summary Manifest Report, including the completed manifest documents, to the Generator through the COR for filing with the state regulator offices. This Summary Manifest Report will be provided in sufficient time to allow the Generators to file the reports within the time frames allotted by each state. The required time frame will be established and documented when the Notification of Regulated Waste Activities form is submitted to the Generator through the COR (see Section 1.1.2.).
c. The content of this Summary Manifest Report will be in accordance with the regulations of the state requiring the report.
1.1.3 SHIPPING/DISPOSAL DOCUMENTATION
a. All references to manifests in this contract refer to the appropriate shipping documents.
The Contractor shall use only a Non-Hazardous Waste Manifest or a Uniform Hazardous Waste Manifest for shipments of waste under this contract. Bill of Lading (BOL) documents are prohibited for use under this contract. Some states may require the use of state-specific waste codes and/or have unique requirements regarding the use of manifests. The Contractor will comply with all such state requirements in the performance of this contract. Prior to removal from a site identified as a pickup point in this contract, completed copies of all manifests and LDR notifications shall be furnished to the DLADS Field Activity coordinating the waste disposal. All documentation shall be clearly marked with the name of the servicing DLADS Field Activity in addition to the Generator, contract, and TO number, as applicable. Emergency response information and 24-hour emergency phone numbers shall be listed on the manifest. If blocks for emergency information are not provided, this information shall be placed in the upper right-hand corner of each document.
b. Electronic Manifest System (e-Manifest system): Generators may continue to use paper manifests during their transition to fully electronic manifests in the e-Manifest system and the phase out of paper manifests. If presented with a paper manifest, the Contractor will provide the Generator a paper copy signed by the initial transporter. The Contractor shall provide the COR and the Generator with a copy of the completed form(s) for review by the appropriate Government official at least five (5) business days prior to removal. Notifications for expedited orders shall be performed IAW timeframes as listed in Sections 1.1.4.
SP4500-19-R-0007 25 of 120
c. Mock EPA ID numbers created by DLADS for use at non-RCRA TSDFs must be entered on all waste manifests. The same mock EPA ID number must be used on DLA Form 2505, Manifest Tracking Log.
d. The “Universal Waste” Rule, 40 CFR § 273, does not require the use of a hazardous waste manifest to ship Universal Waste (UW) within, to, or through a state that has adopted the Universal Waste Rule, in which case, under this contract, a non-hazardous waste manifest may be used. Whenever UW is transported from, to, or through a state that has not adopted the rule, a hazardous waste manifest will be used. The Contractor will specify on the manifest in the “Special Handling Instructions and Additional Information” (or equivalent) block when UW is being transported (e.g., “Universal Waste Shipment”). Shipments of UW must comply with the requirements specified in 40 CFR § 273.18 and 273.38. UW includes but is not limited to batteries, pesticides, mercury containing equipment, and lamps as defined in 40 CFR § 260.10.
It may also include state-regulated UW such as antifreeze, paint and paint-related wastes (PPRW), cathode ray tubes (CRTs), electronics, and aerosol cans. The regulations allow the Generator to make the determination about whether to handle these and other specific wastes as UW or as HW per 40 CFR. The Contractor will be advised on the TO if these wastes are to be handled as “Universal Waste”.
NOTE: While Generators have the option to manage some waste streams as UW, Generators under this contract may be required to order disposal/recycling CLINs that allow the waste to be properly managed based on the waste characteristics if it were otherwise managed as a HW.
Example: Universal waste aerosol cans that would otherwise carry corrosive (D002) or reactive (D003) EPA Waste Codes, will be ordered under CLINs CS15C7 and RX01C7, respectively, and NOT CLIN FL01C7, even if managed and turned in as UW under state and/or federal regulations. This is because corrosive and reactive wastes cannot typically be processed using fuels blending technologies for energy recovery as hazardous waste derived fuels. Other scenarios may apply.
1.1.4 NOTIFICATIONS
a. Except as may otherwise be specified herein, the Contractor shall notify the COR or other Government representative, at least five (5) business days BEFORE attempting site visits, providing services, or removal efforts.
(1) In addition to the notification above for removal efforts, the Contractor shall provide the name of the driver, the driver’s Commercial Driver License (CDL) number and its expiration date, to the COR or other Government representative at least 24 hours prior to removal. The Contractor may also opt to provide a list of approved, multiple drivers designated for pickups under this specific contract to the COR, or other Government representative prior to any attempted removals. If this option is elected and the list is approved by the Government and maintained by the Contractor, the 24-hour notification requirement is mute for the remainder of the contract unless otherwise modified.
(2) If a driver, other than the one specified 24 hours in advance for the specific TO, or, one whose name does not appear on the optional list of approved, multiple drivers arrive
SP4500-19-R-0007 26 of 120 for pickup, the COR or other designated Government representative will verify the personnel change with the Contractor before the pickup commences. This may require a written notice or fax from the Contractor.
b. For TOs containing expedited removal or performance CLINs, the Contractor shall notify the COR or other Government representative for each location in the following timeframes BEFORE attempting site visits for any reason:
CLINs Description Notification Required 6335, 6345 1-Day Expedite 4 Hours Prior to Performance 6334, 6344 3-Day Expedite 1 Day Prior to Performance 6333, 6343 5-Day Expedite 2 Days Prior to Performance 6332, 6342 7-Day Expedite 4 Days Prior to Performance 6331, 6341 10-Day Expedite 5 Days Prior to Performance
See Section 1.2.11 for additional information on expedite services CLINs.
NOTE: If the Contractor elects to provide the list of approved, multiple drivers designated for use under this contract, this expedited notification is not required. All other terms and conditions stated in the contract will apply to any of the aforementioned expedited removals or performance CLINs.
NOTE: Defense Biometric Identification System (DBIDS) may be mandatory for access to some DOD facilities. See Section 1.1.8 for further information. Where DBIDS is utilized, the 24-hour advance notification is not required. At some military installations, the Contractor and/or Subcontractors may be required to be escorted to and from the place of work. This requirement is for both safety and physical security purposes. Contractors, their employees, agents, and/or any Subcontractors are required to remain at the designated work area until released or escorted by the COR or other Government representative.
1.1.5 TRAILER SECURITY
a. HW and DEMIL shipments are not required to be locked or sealed in most situations.
In some cases an applicable Department of Transportation (DOT) security plan or State Law may require locking the load. It is the Contractors responsibility to identify these situations and provide locks or seals for this purpose if required.
b. The COR or other Government representative has the right to request any identification and/or occupational endorsements from the driver beyond what is identified in additional specific sections in this contract and refuse commencement and/or completion of pickups if any unusual or suspicious actions occur. Any potential demurrage associated with the driver verification process and/or the unexpected halt or commencement of pickups will not be grounds for reimbursement by the Government.
1.1.6 HOURS OF OPERATION
SP4500-19-R-0007 27 of 120
a. The service to be performed under this contract shall be performed during normal Government working days, as applicable for the site(s) on the TO, with specific office hours available from the COR on the TO, except for Federal holidays. Work that cannot be completed by close-of-business for the TO site(s) shall be discontinued and resumed the next business day, unless approved by the KO. Services will not be scheduled to be performed on a regular Federal holiday (see below), or one designated by Presidential proclamation.
New Year’s Day - 1 January* Martin Luther King's Birthday - 3rd Monday in January Presidents Day - 3rd Monday in February Memorial Day - Last Monday in May Independence Day - 4 July* Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veterans Day - 11 November* Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December*
*The holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.
b. Installation specific normal hours of operations for this contract are available upon request from the COR. This contract is for various military and Government activities of which may have different work schedules. Excluding weekends and observed Federal holidays, the Contractor agrees that, for those portions of the services provided on a Government installation, the services will be provided during the normal hours of operations for the installation.
1.1.7 PUBLIC AFFAIRS COORDINATION
The Contractor shall refer all inquiries concerning this contract to the Contracting Officer (KO).
Under no circumstances shall any statement be released to the news media directly by the Contractor or any agents of the Contractor.
1.1.8 DBIDS INSTALLATION ACCESS
a. The Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
b. Navy and Marine Corps installations now require that all Contractors and their representatives be credentialed via enrollment in the DBIDS to gain access to these installations.
DBIDS replaces the former Rapid Gate access system and also requires a security background check for all Contractors and their representatives. The Contractor will plan accordingly.
c. For DBIDS enrollment information, go to: https://www.cnic.navy.mil/om/dbids.html.
1.1.9 ENVIRONMENTAL MANAGEMENT SYSTEM
SP4500-19-R-0007 28 of 120 https://www.cnic.navy.mil/om/dbids.html
DLADS implemented an Environmental Management System (EMS) in accordance with ISO 14001:2004(E), DOD, and DLA requirements at all appropriate DLADS facilities. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy of an organization. The DLADS EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities and authorities while supporting the DLADS mission. The DLADS EMS program is explained in the agency EMS Core Instruction. Site supplements may detail information required by EMS at a local level such as local, state and host environmental regulations as well as local emergency procedures and operating procedures unique to the location. Site supplements also contain information concerning the local interaction between the appropriate DLADS tenant facility and the DOD/DLA host facility EMS program. Contractors and their personnel are required to be aware that each appropriate DLADS facility has an EMS and to be aware of EMS policies to perform work and/or gain access to an installation. Each DLADS facility maintains EMS awareness posters that identify the DLADS Environmental Management Representative (EMR) and host facility EMR for specific guidance concerning an individual facility’s EMS program.
Contractors may request current copies of EMS information identified in this Section by contacting the local COR.
1.1.10 CONTRACTOR PERSONNEL
All Contractor personnel performing work under this PWS shall be qualified via training and experience, commensurate with the duties being fulfilled, to the minimum requirements under relevant 29 CFR-OSHA, 40 CFR-EPA, 49 CFR-DOT, EM 385 standards, and updates thereto.
The Contractor shall be responsible for all initial and refresher training required of Contractor personnel and it shall be completed in the appropriate timeframes. Upon request by the Government, the Contractor shall provide proof that these trainings were completed.
1.2 REMOVAL
1.2.1 SPILL RESPONSIBILITY
a. The Contractor and/or Subcontractor shall have a serviceable, compatible and operable spill kit(s) on-site to capture and contain a spill or release. The Contractor is solely responsible for cleanup and proper disposal of all spills or leaks during the performance of this contract that occur as a result of, or are attributed to, the actions of its agents, employees, or Subcontractors to the satisfaction of the Government and at no additional cost to the Government. Hazardous waste spill cleanups that occur as a result of, or are attributed to, the actions of its agents, employees, or Subcontractors shall be removed off-site within 72-hours of the cleanup. Under extenuating circumstances and with approval of the host’s Environmental Office, hazardous waste spill cleanups may be allowed to move to a permitted Satellite Accumulation Area until it can be shipped off-site. The Contractor shall prepare a separate manifest for the spill cleanup removals.
SP4500-19-R-0007 29 of 120
b. The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.