One_time_Haz_Waste_removal_PWS.docx

DOCX document 41 KB Posted

Attached to
Korea Haz Waste One-Time Pickup
Solicitation number
SP4500-19-Q-9001
Issued by

View the file

Other files

File Type Posted
DL2503_Sep2016.pdf PDF
DL2507-1_Sep_2016.pdf PDF
Performance_Work_Statement_10DEC2018.docx DOCX document
One_time_Haz_Waste_removal_PWS.docx DOCX document
BID_Schedule_KOREA_HW_One_Time_16Nov18.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notes to Offerors

1. This is a COMMERCIAL solicitation for an award of a Firm-Fixed-Price (FFP). The resultant contract will provide non-hazardous waste removal, transportation, disposal and/or recycling services.

0.0 PERFORMANCE WORK STATEMENT

a. This contract requires the removal, transportation and disposal of Hazardous Wastes as identified in the Korea Environmental Governing Standards (KEGS) and by the Republic of Korea (ROK) and listed within the attached Price Schedule. The KEGS may be located at:

http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regulations/USFK/USFK%20Reg%20201-1%20Korean%20Environmental%20Governing%20Standards.pdf

b. The Contractor agrees to provide all services necessary for the final recycling / treatment / disposal of the materials listed in the Price Schedule of this contract in accordance with the KEGS and respective national and local environmental laws and regulations, as well as any applicable international agreements governing the transportation of dangerous goods and the terms and conditions of this contract. This includes ensuring all vehicles transporting materials subject to this contract are properly placarded in accordance with applicable Korean transportation laws applicable requirements. These services shall include all necessary personnel, including applicable joint venture partners, representatives, labor, analysis, transportation, packaging, equipment, and the compilation and submission of all documentation required by this contract to include inspecting, packaging, marking and labeling, loading, unloading, removal, transportation, and disposal / recycling of materials subject to this contract from U.S. Department of Defense (DOD) installations, Republic of Korea.
c. All materials/wastes subject to this contract must be identified and transported in accordance with Korean transportation and safety standards and/or those indicated in the Globally Harmonized System (GHS). All Contract Line Item Numbers (CLINs) regardless of condition are being discarded by the Government and are considered to be waste subject to recycling or disposal.
d. Plus or minus 10% of inventories on board the pick-up sites are listed in attachment BID Schedule Korea HW One Time 16Nov18:

1.0 TRANSPORTATION

a. Contractor-provided transportation will comply with all ROK laws and regulations for the transportation of hazardous/non-hazardous materials and designated waste under this contract and U.S. Military Base Safety requirements, DOD Safety and Security policies while on DOD Installations.

1.1 ACCESS TO U.S. DEPT. OF DEFENSE INSTALLATIONS

a. The Contractor must provide the following documents at the Installation Security office to gain access to the U.S. DoD installation:

1. Identification/Passport Number
2. Appropriate Vehicle Insurance
3. TBD

1.2 SPILL RESPONSIBILITY

a. The Contractor is solely responsible for containment, cleanup and disposal of all spills, leaks, spill residue, and/or debris, and includes appropriate container packaging, labeling, and documentation for shipment during the performance of this contract that occurs as a result of, or is contributed to by the actions, of its agents, employees, or Representative. The Contractor agrees to clean up such spills as outlined in the following, the site specific Spill Response Plan(s), and in accordance with applicable local laws and regulations at no cost to the U.S. Government.

1.3 LOADING

a. The Contractor is responsible for loading, including furnishing all the equipment necessary for loading. The USG will not load at any location on any day in which the facility is closed unless otherwise specified. Unless otherwise provided in this contract, the USG will not block, chock, brace, lash, band, or in any other manner, secure the cargo on such conveyance(s) furnished by the Contractor.

1.4 TECHNICAL POINTS OF CONTACT

Ms. Hye Suk Sin – email HyeSuk.Sin.kor@dla.mil Mobile Phone 011821055404953
Mr. Edward M. Forbes – email edward.forbes@dla.mil Mobile Phone 01085202569

1.5 PERIOD OF PERFORMANCE

Contractor is to begin disposals within 10 Days of contract award and complete all removals of Non-Regulatory material within 30 days of contract award.

2.1 Environmental Management System (EMS)

DLA Disposition Services implemented EMS in accordance with ISO 14001:2004(E), DOD and DLA requirements at all DLA Disposition Services appropriate facilities. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy of an organization. The DLA Disposition Services EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities and authorities while supporting the DLA Disposition Services mission. The DLA Disposition Services EMS program is explained in DRMS-I 6050.2, Environmental Management System (EMS) Core Instruction. Site supplements detail information required by EMS at a local level such as local, state and host environmental regulations as well as local emergency procedures and operating procedures unique to the location. Site supplements also contain information concerning the local interaction between the DLA Disposition Services tenant appropriate facility and the DOD/DLA host facility EMS program. Contractors and their personnel are required to be aware that each DLA Disposition Services appropriate facility has an EMS and to be aware of EMS policies to perform work and/or gain access to an installation. Each DLA Disposition Services appropriate facility maintains EMS awareness posters that identify the DLA Disposition Services Environmental Management Representative (EMR) and Host facility EMR for specific guidance concerning an individual facilities’ EMS program. Contractors may request current copies of EMS information identified in this paragraph by sending an e-mail request to DRMSEMR@dla.mil.

2.2 Contractor Manpower Reporting

The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2014. The contactor may direct questions to the help desk at: http://www.ecmra.mil.