SF-30_AFFF_Amendment4.pdf
PDF 271 KB Posted
- Solicitation number
- SP450018R0008
About this file
SF-30 Amendment 04
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AFFF_Performance_Work_Statement082918.doc | DOC document | |
| SF-30_AFFF_Amendment3.pdf | ||
| Copy_of_Estimated_MILSVCS_Inventory.xlsx | XLSX spreadsheet | |
| SP450018R0008_AFFF_Amendment.pdf | ||
| SF-30_AFFF_Amendment2.pdf | ||
| AFFF_Performance_Work_Statement.doc | DOC document | |
| Responses_to_Contractor_Questions1.docx | DOCX document | |
| ADDENDA_TO_FAR_52.212-1.docx | DOCX document | |
| Last_Ordering_Period_list.xls | XLS spreadsheet | |
| ADDENDA_TO_FAR_52.212-2.docx | DOCX document | |
| AFFF_Amendment.pdf | ||
| Copy_of_MA_5-yr_Bid_Sched.xlsx | XLSX spreadsheet | |
| ADDENDA_TO_FAR_52.212-2.docx | DOCX document | |
| ADDENDA_TO_FAR_52.212-1.docx | DOCX document | |
| Copy_of_West_5-yr_Bid_Sched.xlsx | XLSX spreadsheet | |
| Copy_of_East_5-yr_Bid_Sched.xlsx | XLSX spreadsheet | |
| AFFF_Performance_Work_Statement.doc | DOC document | |
| PPI__Offeror_Questionnaire_-_Updated_12-7-2016.pdf | ||
| SP450018R0008_AFFF_Rv2.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
4. REQUISITION/PURCHASE REQ. NO.
n/a
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP4500 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP4500-18-R-0008
X
2018 August 02
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA DISPOSTION SERVICE - EBS DLA DISP SVCSS
HAZ CONTRACT 74 NORTH WASHINGTON
BATTLE CREEK MI 49037-3092
USA
Initiator: Stephen Ngotho PZMPS00 Tel: 269-961-5465 Email: Stephen.ngotho@dla.mil
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to add language to the Performance Work Statement (PWS) in section 1.1.1.1 CLIN Disputes. See attached PWS for details.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
2. AMENDMENT/MODIFICATION NO.
0004 2018 August 30 18BE087AFFF
1.1.1.1 CLIN DISPUTES
a. CLIN discrepancies noted on a TO during a pre-removal inspection and/or during removal by the Contractor will be addressed immediately via the COR and the Generator. If the
COR and the Generator concur with the CLIN change request, a TO Modification will be submitted to the Contracting Specialist. In addition, the Government may unilaterally issue TO modifications for such reasons as quantity changes, noun description changes, CLIN changes, adding/deleting TO lines, extending TO end dates, etc. The Contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If upon receipt of a unilateral TO modification, the Contractor does not agree with the change or changes, the
Contractor reserves the right to seek resolution with the CO. These modifications are only against TOs. No changes are made to the terms and conditions of the contract.
b. If after removal the Contractor asserts that an inappropriate CLIN has been assigned, the burden of proof lies with the Contractor to provide evidence that a different CLIN needs to be assigned or added to the contract. The Contractor must ensure that the waste in question shall not be treated or disposed of until the Government has made a final CLIN determination – otherwise the dispute is considered null and void. The Contractor must provide documentation electronically to the KO via the COR which supports the assertion through independently acquired laboratory analysis at the Contractor’s expense, TSDF fingerprinting results, Safety
Data Sheet, and/or other written supporting documentation such as a TSDF “off-spec” notification. Written documentation solely requesting a CLIN addition without supporting documents will not be accepted. Supporting documentation does not include any documentation provided to the contractor prior to removal from the site except for comparison purposes to the documentation being provided that supports a CLIN change request. After receipt of the supporting documentation, said documents will be reviewed to determine if adding a new CLIN is applicable. The Contractor will be notified by the KO of the final determination.
| PAGE 2.pdf |