18R0007-Attachment1PWS-21Sept2018.docx
DOCX document 137 KB Posted
- Solicitation number
- SP450018R0007
About this file
SP450018R0007 - Performance Work Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R00070002.pdf | ||
| ODS_Reserve_Estimated_Quantities.pdf | ||
| Copy_of_Richmond_1_year_Ordering_Summary.xls | XLS spreadsheet | |
| SF30_SP450018R00070001.pdf | ||
| 18R0007-Att-4-1_Year_Ordering_History23Aug2018.xls | XLS spreadsheet | |
| Copy_of_18R0007-Att_2_Richmond_Bid-21Sep2018.xlsx | XLSX spreadsheet | |
| 18R0007-Attachment-6-PPI-Offeror-Questionnaire_(002).pdf | ||
| 18R0007-Attachment-3-PUP-23Aug2018.xlsx | XLSX spreadsheet | |
| SP450018R0007.pdf | ||
| 18R007-5-Att-Other_Attachments-23Aug2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP4500-18-R-0007 Attachment 1 Table of Contents
0. PERFORMANCE WORK STATEMENT
1. REMOVAL
| 1.1 PRE-REMOVAL | ||
| 1.1.1 BASE CLIN CATEGORIES | ||
| 1.1.1.1 CLIN DISPUTES | ||
| 1.1.2 PERMIT/SPECIAL REQUIREMENTS | ||
| 1.1.2.1 REPORTING REQUIREMENTS | ||
| 1.1.3 SHIPPING/DISPOSAL DOCUMENTATION |
1.1.4 NOTIFICATIONS
1.1.5 TRAILER SECURITY, PADLOCKS
1.1.6 HOURS OF OPERATION
1.1.7 PUBLIC AFFAIRS COORDINATION
1.1.8 DBIDS INSTALLATION ACCESS
1.1.9 ENVIRONMENTAL MANAGEMENT SYSTEM
1.1.10 CONTRACTOR PERSONNEL
| 1.2 REMOVAL | ||
| 1.2.1 SPILL RESPONSIBILITY | ||
| 1.2.2 SEGREGATION OF HAZARDOUS WASTE | ||
| 1.2.3 STATEMENT ON CONTAINERS | ||
| 1.2.4 GOVERNMENT EQUIPMENT & PERSONNEL | ||
| 1.2.5 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT | ||
| FACILITY | ||
| 1.2.6 LOADING | ||
| 1.2.7 WEIGHING OF ITEMS | ||
| 1.2.7.1 TASK ORDER (TO) ADJUSTMENTS | ||
| 1.2.8 DEFINITIONS, BULK & CONTAINERIZED WASTE | ||
| 1.2.8.1 BULK WASTE | ||
| 1.2.8.2 CONTAINERIZED WASTE | ||
| 1.2.9 BULK LIQUID PUMPING | ||
| 1.2.10 BULKING & CONSOLIDATION | ||
| 1.2.11 CHARGES FOR EXPEDITES | ||
| 1.2.12 OVER-PACKAGING FOR COMPLIANCE | ||
| 1.2.13 PACKAGING FOR COMPLIANCE | ||
| 1.3 POST REMOVAL | ||
| 1.3.1 RETURN OF SHIPPING DOCUMENTATION |
2. DISPOSAL/RECYCLING
2.1 RCRA/NON-RCRA ITEMS
2.1.1 TSCA/RCRA/NON-RCRA/STATE/NON-STATE REGULATED ITEMS
2.1.2 CERTIFICATES OF DISPOSAL, DESTRUCTION, & RECYCLING
2.1.3 DETAILED ANALYSIS
2.1.4 PROCESS AUTHORIZATION PLAN FOR ALTERNATE
DOCUMENTATION OPTION FOR FUELS BLENDING & RECYCLING OF ANTIFREEZE, USED OIL, BATTERIES, & LAMPS
2.1.5 RESERVED
2.1.6 EMPTY CONTAINERS
2.1.7 RESERVED
| 2.2 DISPOSAL OF PCB, PCB-RELATED WASTE | |
| 2.3 COMPRESSED GAS CYLINDERS | |
| 2.3.1 EVALUATION/IDENTIFICATION OF CYLINDERS | |
| 2.3.2 ANALYSIS TO IDENTIFY CYLINDER CONTENTS | |
| 2.3.3 RECONTAINERIZATION/REPLACEMENT OF VALVES | |
| 2.3.4 SURCHARGE FOR ZONE “A” POISON GASES | |
| 2.4 RECYCLING |
2.4.1 RECYCLE/RECOVERY/RE-USE/RECLAIM
2.4.2 COMMODITY SPECIFIC RECYCLING REQUIREMENTS
| 2.5 DEMILITARIZATION | |
| 2.5.1 RESERVED | |
| 2.5.2 OTHER MILITARY ITEMS |
3. SPECIAL SERVICES
| 3.1 RESERVED |
| 3.2 TANK & WASH RACK CLEANING |
| 3.3 PERFORM ANALYSIS |
| 3.4 PREPARE WASTE PROFILE SHEET |
| 3.5 IDENTIFY UNKNOWN WASTE STREAMS & PREPARE WASTE |
| PROFILE SHEETS |
| 3.6 PROVIDE ROLLOFF STORAGE CONTAINERS & RENTAL CHARGES |
| 3.7 LAB PACKING SERVICES |
| 3.8 PERFORM MANAGEMENT SERVICES SUPPORT |
| 3.9 BULK NON-RCRA WASTEWATER MANAGEMENT |
| 3.10 MINIMUM CHARGES FOR BULK LIQUID REMOVALS |
| 3.11 RESERVED |
3.12 PROVIDE SERVICE TO INFLATE FUEL BAG
3.13 BULK REFRIGERANT GASES FOR REMOVAL FROM DOD OZONE
DEPLETING SUBSTANCES (ODS) RESERVE PROGRAM\
3.14 DISPOSAL OF SOIL LOCATED ON DEFENSE SUPPLY CENTER,
RICHMOND
4. ACCEPTABLE PERFORMANCE LEVELS
4.1 ACCEPTABLE PERFORMANCE LEVEL TABLE
5. THE QUALIFIED FACILITIES AND TRANSPORTERS LISTS
5.1 USE OF FACILITIES AND TRANSPORTERS
5.2 FACILITY REMOVAL
5.3 TRANSPORTER REMOVAL
6. ADDITIONAL REQUIREMENTS
6.1 INDEMNIFICATION
6.2 REPORTING REQUIREMENTS
6.2.1 CONTRACTOR ACCESS TO DLA DISPOSITION SERVICES (DLADS) DISTRIBUTION STANDARD SYSTEM/ULTIMATE DISPOSAL (DSS/UD), PHASE II ONLY
6.3 PACKING, MARKING AND LABELING
6.4 PLACES OF GOVERNMENT INSPECTION
6.5 CONTRACTOR REPRESENTATIVE
6.6 INCIDENTAL FEES
6.7 MANPOWER REPORTING REQUIREMENTS
7. PERIOD OF PERFORMANCE INCLUDING DISPOSAL AND REMOVAL
8. DOCUMENTATION REQUIREMENTS, DLADS ACCEPTANCE, INVOICING AND TRACKING
8.1 SUBMISSION OF DOCUMENTATION TO FACILITATE ACCEPTANCE FOR
PAYMENT
8.1.1 ACCEPTANCE AND INVOICING
8.2 POST-PAYMENT TRACKING
8.3 REMEDIES FOR NON-COMPLIANCE
8.4 CONTRACT MINIMUM/MAXIMUM
8.5 CONTRACTOR ACCESS TO DLA DISPOSITION SERVICES SITES
8.6 PERIOD OF PERFORMANCE
0. PERFORMANCE WORK STATEMENT
a. This contract is referred to as the “Richmond HW Disposal Contract”. Work will consist of the removal, transportation and disposal of RCRA hazardous wastes, non-RCRA wastes, State-Regulated wastes, Non-State Regulated wastes, Universal Wastes, Compressed Gas Cylinders, and Polychlorinated Biphenyls (PCBs) located on military installations in the states of Virginia and West Virginia. The Contractor is cautioned that some requirements for information and plans are required before start of work on this contract, i.e., Sections 1.1.1, 2.1.4, and 3.9.
b. This contract consists of one (1) 30-month Base Period, followed by one (1) 30-month Option Period.
c. Pricing for containerized waste will largely be based upon container sizes and the assigned disposal profile, rather than pricing on a per pound basis. The exception is bulk wastes as defined in paragraph 1.2.8.1 and containerized waste with the suffix C7.
d. This contract is a firm-fixed price indefinite delivery/indefinite quantity (IDIQ) contract written as a performance based contract and allows the Contracting Officer (KO) to make monetary deductions and/or a negative mark on the Contractor’s Past Performance when an Acceptable Performance Level (APL) is not met.
e. The Government agrees that all items placed on a Task Order (TO) on this contract will be accompanied by documentation and markings that comply with all applicable local, state, and federal laws and regulations relating to the generation, storage and transportation of waste.
| f. The Contractor agrees to provide all services necessary for the transportation, final treatment, disposal, and/or recycling of the items listed in the schedule in accordance with (IAW) all local, state, and federal laws and regulations, and the terms and conditions of this contract. These services shall include all necessary personnel, including applicable Subcontractors, labor, transportation, equipment, and the compilation and submission of all documentation required by this contract. All items, regardless of the condition, are being discarded by the Government and will require recycling or disposal as identified via the ordered Contract Line Item Number (CLIN). |
| g. The six- character disposal CLIN consists of two parts. The term “Base CLIN” refers to the first four characters of the CLIN. The Base CLIN represents the waste description according to the waste profile for a particular wastestream. The term “CLIN Suffix” refers to the last two characters of the CLIN. The CLIN Suffix designates the unit of measure for purposes of tracking and Contractor payment. Example: Base CLIN “CS01” represents Corrosive Acids, Inorganic other than HF and HNO3, <50% in Water, and the CLIN Suffix “C4” designates the unit of issue as a 55-Gallon Container. Accordingly, one (1) 55-gallon drum of this waste would be represented by ordering one (1) Each of CLIN CS01C4. General information of Profile Based CLINs may be found at: http://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/HazWasteDisposal.aspx |
| h. Some CLINs ordered under this contract require the Contractor to provide Certificates of Destruction or Disposal (CD), e.g., certain Demilitarization items and PCB-related wastes. The Contractor is cautioned to closely read all CLIN descriptions where such requirements are indicated. Unless explicitly required and written into this contract, only those CLINs requiring CDs, as described in the Price schedule, will require that the Contractor provide a CD. |
i. Publications and attachments applicable to this contract will be made available upon request. It should be noted that during the solicitation and life of this contract, the Government may make changes, additions, and/or deletions to those listed.
j. The Contractor is specifically cautioned that all tank cleaning CLIN quoted prices will include provision for necessary personnel, MHE, PPE, confined space entry if applicable, and all equipment used to perform these services. The Contractor should bid accordingly.
k. Generators are responsible for ensuring their containerized wastes sent for disposal via this contract are in Department of Transportation (DOT) shippable packaging.
1. REMOVAL PHASES
The requirements for removal of wastes under this contract are divided into three main phases: Pre-Removal (1.1), Removal (1.2), and Post-Removal (1.3). The Contractor and their Subcontractors must perform at all times in a prudent, conscientious, safe, and professional manner. The Contractor shall ensure that its agents, employees, and Subcontractors involved in handling and packaging the hazardous waste be trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. The Contractor shall provide all Material Handling Equipment (MHE) and Personal Protective Equipment (PPE), unless otherwise stated. The MHE and PPE must be appropriate to safely handle the hazardous waste. While operating on a Department of Defense (DOD) facility, the Contractor may be required to use forklifts. Contractor-operated forklifts must meet specifications listed in the applicable permit. The Contractor agrees that all personnel and equipment used in the performance of this contract are subject to safety inspections by Government personnel while on federal property.
1.1 PRE-REMOVAL
1.1.1 BASE CLIN CATEGORIES
| a. Base CLIN categories and their associated prefixes used in waste disposal CLINs under this contract are as follows: | ||
| (1) Batteries (BA) – Used for all battery types, some or all of which may be turned in as Universal Waste (UW) where no EPA waste codes are assigned, or as Hazardous Waste (HW), where applicable EPA waste codes are assigned. | ||
| (2) Corrosives (CS) – Used for all corrosive wastes meeting the EPA definition of corrosive and carrying the EPA waste code D002, unless it is a Lab Pack/Loose Pack, or unless the waste is concurrently assigned a D001 (ignitable) or D003 (reactive) waste code. Some corrosive acid oxidizers may carry the D001 waste code and be assigned a CS CLIN. | ||
| (3) Compressed Gas Cylinders/Cartridges (CY) – Used for all types of compressed gas cylinders, vessels, canisters and cartridges. Base CLINs are assigned based on the specific chemical name of the gas or gases comprising the contents of the cylinder, vessel or canister. Cartridges are assigned Base CLINs based on whether the gas is flammable or inert. | ||
| (4) Flammable/Combustible/Ignitable (FL) – Used for all ignitable and other than reactive or corrosive oxidizers carrying the D001 waste code, unless it is a Lab Pack or Loose Pack containing other than paint-related materials, or unless the waste is concurrently assigned a D003 (reactive) waste code. FL CLINs may also be assigned to waste streams not carrying the D001 waste code, but containing flammable/combustible/ignitable constituents such as organic solvents or chemicals. | ||
| (5) Lab Packs/Loose Packs (LP) – Used for most overpacked small containers of chemicals and consumer commodity-type products. “Lab Pack” refers predominantly to the overpacking of multiple containers of like laboratory chemicals into a single outer container. The chemicals must be of the same DOT hazard class and a detailed inventory must be affixed to the outer container. Lab packing is a packaging method performed by the Contractor (or Subcontractor) under a separate service CLIN. “Loose Pack” refers predominantly to the overpacking of multiple containers of like consumer commodity products (e.g., paints, lubricants, expired products, etc.) into a single outer container and does not require the preparation of a detailed inventory. Generators of this waste may be authorized to loose-pack containers for turn-in. Lab-packed and loose-packed drums and boxes containing smaller containers of same type wastes provide the best alternative when consolidation is impractical. For purposes of disposal, Lab Packs and Loose Packs share the same Base CLIN depending upon the contents of the inner containers and their assigned EPA waste code(s) when applicable. | ||
| (6) Non-RCRA, Non-State and State-Regulated (NR) – Used for wastes that are not deemed hazardous under the United States Environmental Protection Agency (USEPA) Resource Conservation and Recovery Act (RCRA) regulations and carry no USEPA waste code(s). Some such wastes may be State regulated and may carry state-specific waste code(s). The Contractor is required to comply with state regulations, as applicable, in the management of such non-RCRA hazardous wastes. | ||
| (7) PCB-Related (PC) – Used for all wastes containing or contaminated by a source of polychlorinated biphenyls (PCBs) that is equal to or greater than 50 parts per million (ppm) and regulated under the Toxic Substances Control Act (TSCA). Some Generators of PCB-related wastes may choose to utilize “PC” Base CLINs, even when PCB concentrations fall below regulatory thresholds. Additionally, some states regulate PCB-related wastes to a concentration threshold that is lower than 50 ppm. The Contractor is required to comply with state regulations, as applicable, in the management of such PCB-related wastes. | ||
| (8) Recycle/Recovery (RE) – Used for various wastes that require by contract and/or regulation the recycling/recovery of constituents and/or components contained in the wastestream, including some universal wastes, lamps, high mercury devices and residues, antifreeze, used oil, used oil and fully drained fuel filters. When “RE” CLINs are ordered, the Contractor is required to recycle/recover the waste under which the CLIN was ordered. | ||
| (9) Reactive (RX) – Used for various reactive wastes bearing the D003 Waste Code or potentially bearing reactive characteristics. All wastes bearing the D003 Waste Code will be turned in for disposal using an “RX” Base CLIN, with the exception of waste also contaminated by a source of PCBs that is equal to or greater than 50 ppm. | ||
| (10) Toxic (TX) – Used for various toxic wastes that are not also ignitable, corrosive, and/or reactive waste bearing the D001, D002, and/or D003 Waste Codes, respectively, with the exception of hexavalent chromium (Cr+6) related waste bearing the D001 Waste Code exclusively due to the oxidizing properties of Cr+6. | ||
| b. The Category and Base CLIN selection for each wastestream is determined by applying the following CLIN Selection Criteria: | ||
| (1) PCB-Related, Containing or Contaminated by a Source >50 ppm | ||
| (2) Reactive (D003) | ||
| (3) Ignitable/Oxidizer (D001), other than Cr+6 related waste bearing the D001 | Waste Code exclusively due to the oxidizing properties of Cr+6. | |
| (4) Corrosive (D002) | ||
| (5) Toxic (D004-D043) | ||
| (6) Acutely Hazardous (P-Listed) | ||
| (7) Leachate (F039) | ||
| (8) Electroplating-Related (F006-F012, F019) | ||
| (9) Spent Solvent (F001-F005) | ||
| (10) Other F-Listed | ||
| (11) U-Listed | ||
| (12) K-Listed | ||
| (13) State-Regulated Waste, Non-RCRA | ||
| (14) Non-RCRA, Non-State Regulated Waste | ||
| c. Recycle/Recovery Base CLINs beginning with “RE” are designated for mandatory recycling/recovery by the Government. If the Contractor asserts that a waste designated for recycling cannot be recycled because it does not meet the required recycling parameters: | ||
| (1) The Contractor must notify the KO in writing at least five (5) business days before pickup, of the rationale and proof for waste rejection. This must include written input from at least two recycling facilities listed on the QFL, at least one of which is not owned by the Contractor. |
NOTE: Unless prohibited by State regulations, fuels blending will meet the recycling/recovery requirements for certain wastes, including solvents, paints, antifreeze, and used oil.
(2) The KO will notify the COR to resolve requests to change the assigned mandatory recycling CLIN to the appropriate disposal CLIN. The final decision to change a mandatory recycling CLIN to the applicable disposal CLIN is solely that of the Government. If the Government agrees with the CLIN change, the applicable disposal CLIN will be assigned.
1.1.1.1 CLIN DISPUTES
a. CLIN discrepancies noted on a TO during a pre-removal inspection and/or during removal by the Contractor will be addressed immediately via the COR and the Generator. If the COR and the Generator concur with the CLIN change request, a TO Modification will be issued.
b. The Government may unilaterally issue TO modifications for such reasons as quantity changes, noun description changes, CLIN changes, adding/deleting TO lines, extending TO end dates, etc. The Contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If upon receipt of a unilateral TO modification, the Contractor does not agree with the change or changes, the Contractor reserves the right to seek resolution with the KO. These modifications are only against TOs. No changes are made to the terms and conditions of the contract.
c. If the Contractor asserts after removal that an inappropriate CLIN has been assigned, the burden of proof lies with the Contractor. The Contractor must provide documentation electronically to the KO and the COR within 14 days from the TSDF receipt date supporting the assertion through independently acquired laboratory analysis at the Contractor’s expense, TSDF fingerprinting results, Safety Data Sheet, and/or other written supporting documentation such as a TSDF “off-spec” notification. Requests for a CLIN change without supporting documents will not be accepted. After review of the documentation, the Contractor will be notified by the KO of the Government’s final determination.
d. If the Contractor asserts that an inappropriate CLIN has been assigned, that no existing contract CLIN is appropriate, and a new CLIN needs to be added to the contract, the burden of proof lies with the Contractor. The Contractor must provide documentation electronically to the KO and the COR within 14 days from the TSDF receipt date supporting the assertion through independently acquired laboratory analysis at the Contractor’s expense, TSDF fingerprinting results, Safety Data Sheet, and/or other written supporting documentation such as a TSDF “off-spec” notification. Requests for a CLIN change without supporting documents will not be accepted. After review of the documentation, the Contractor will be notified by the KO of the Government’s final determination.
e. The Contractor must ensure that the waste in question is not treated or disposed of until the Government has made a final CLIN determination. If the subject waste has been treated and/or disposed of prior to the Government’s final determination, the Contractor will be deemed to have waived its objection to the CLIN assignment.
1.1.2 PERMIT/SPECIAL REQUIREMENTS
| a. Without additional expense to the Government, The Contractor shall be responsible for paying all fees, preparing or obtaining any necessary licenses, permits, notifications, waste profiles, or reports, which result from a Contractor’s transportation, recycling, or disposal decision. This includes any fees associated with requirements of the Environmental Protection agency (EPA) national electronic manifest system. This includes acquiring any required permits or registrations necessary to operate on any installation listed in this contract and completing the Notification of Regulated Waste Activity form for the Generator(s) of hazardous waste to sign and file with the applicable state regulators for waste disposal. This includes signing (on behalf of the Government) waste profiles requested by Treatment, Storage, and Disposal Facilities (TSDF). All Contractor-signed waste profile sheets shall be written for the actual wastestream using the Generator’s profile for backup documentation. All Generator forms or other means of notifications including correspondence with federal or state agencies on behalf of a Generator must be coordinated with and concurred with by the affected Generator prior to submission to any federal or state agency. A copy of all forms and relevant documentation, including correspondence shall be provided to the COR. |
| b. The Contractor may be required to attend special training, seminars, instructions, classes, safety orientations, etc., provided by the Government or to provide information to perform work or gain access to the installation. Example: pass and ID requirements, antiterrorist training, Environmental Management System (EMS) policies, and/or forklift training. |
| c. The Contractor and any Subcontractor(s) shall use only the facilities and transporters currently (at the time) listed in the DLADS Qualified Facilities List (QFL) and Qualified Transporters List (QTL), see Section 5. |
| d. Any import or export shipment outside the United States must comply with all international agreements and all applicable foreign laws. If the Contractor will be exporting directly from the DOD activity, the Contractor is required to provide a current copy of the Acknowledgment(s) of Consent to the Contracting Officer Representative (COR) with the shipping documentation IAW Section 1.1.2. |
| e. The Contractor may not ship waste outside of the United States to circumvent Environmental Protection Agency (EPA) Land Disposal Restrictions (LDR) unless domestic treatment capability does not exist or domestic facilities are unable to meet EPA LDR requirements within the United States (e.g., Lithium batteries). High level mercury (>260 mg/kg) will not be exported outside the United States. |
1.1.2.1 REPORTING REQUIREMENTS
| a. If the Contractor uses a TSDF, which requires the Generators(s) of hazardous waste to register with an out-of-state hazardous waste management facility prior to utilizing the facility, then the Contractor must adhere to the requirements of Paragraph 1.1.2, and Instructions. | |
| b. The Contractor shall prepare and provide a Summary Manifest Report, including the completed manifest documents, to the Generator through the COR for filing with the state regulator offices. This Summary Manifest Report will be provided in sufficient time to allow |
the Generator to file the reports within the time frames allotted by each state. The required time frame will be established and documented when the Notification of Regulated Waste Activities form is submitted to the Generator through the COR (see paragraph 1.1.2.).
c. The content of this Summary Manifest Report will be in accordance with the regulations of the state requiring the report.
1.1.3 SHIPPING/DISPOSAL DOCUMENTATION
a. All references to manifests in this provision refer to the appropriate shipping papers. Prior to removal from a site identified as a pickup point in this contract, completed copies of all manifests and LDR notifications shall be furnished to the DLADS Field Activity coordinating the waste disposal. All documentation shall be clearly marked with the name of the servicing DLADS Field Activity in addition to the Generator, contract, and TO number, as applicable. Emergency response information and 24-hour emergency phone numbers shall be listed on the manifest. If blocks for emergency information are not provided, this information shall be placed in the upper right-hand corner of each document.
b. Electronic Manifest System (e-Manifest system): Generators may continue to use paper manifests during their transition to fully electronic manifests in the e-Manifest system and the phase out of paper manifests. If presented with a paper manifest, the Contractor will provide the Generator a paper copy signed by the initial transporter. The Contractor shall provide the COR and the Generator with a copy of the completed form(s) for review by the appropriate Government official at least five (5) business days prior to removal. Notifications for expedited orders shall be performed IAW timeframes as listed in Section 3.5.
| c. Mock EPA ID numbers created by DLADS for use at non-RCRA TSDFs must be entered on all applicable shipping documentation such as non-hazardous waste manifests and bills of lading (BOL). The same mock EPA ID number must be used on DLA Form 2505, Manifest Tracking Log. |
| d. The “Universal Waste” Rule, 40 CFR, Part 273, does not require the use of a hazardous waste manifest to ship universal waste within, to, or through a state that has adopted the Universal Waste Rule. Whenever Universal Waste (UW) is transported from, to, or through a state that has not adopted the rule, a hazardous waste manifest will be used. The Contractor will specify on the manifest in the “Special Handling Instructions and Additional Information” block when universal waste is being transported (e.g., “Universal Waste Shipment”). Shipments of universal waste must comply with the requirements specified in 40 CFR 273.18 and 273.38. UW includes but is not limited to batteries, pesticides, mercury containing equipment, and lamps as defined in 40 CFR 260.10. It may also include state-regulated UW such as antifreeze, paint and paint-related wastes (PPRW), cathode ray tubes (CRTs), electronics, and aerosol cans. The regulations allow the Generator to make the determination about whether to handle these and other specific wastes as UW or as HW per 40 CFR. The Contractor will be advised on the TO if these wastes are to be handled as “Universal Waste”. |
NOTE: While Generators have the option to manage some waste streams as UW, Generators under this contract may be required to order disposal/recycling CLINs that allow the waste to be properly managed based on the waste characteristics if it were otherwise managed as a HW. Example: Universal waste aerosol cans that would otherwise carry corrosive (D002) or reactive (D003) waste codes, will be ordered under CLINs CS15C7 and RX01C7, respectively, and NOT CLIN FL01C7, even if managed and turned in as UW under state and/or federal regulations. This is because corrosive and reactive wastes cannot typically be processed using fuels blending technologies for energy recovery as hazardous waste derived fuels. Other scenarios may apply.
1.1.4 NOTIFICATIONS
| a. Except as may otherwise be specified herein, the Contractor shall notify the COR or other Government representative, at least five (5) business days BEFORE attempting site visits, providing services, or removal efforts. | |
| (1) In addition to the notification above for removal efforts, the Contractor shall provide the name of the driver, the driver’s Commercial Driver License (CDL) number and its expiration date, to the COR or other Government representative at least 24 hours prior to removal. The Contractor may also opt to provide a list of approved, multiple drivers designated for pickups under this specific contract to the COR, or other Government representative prior to any attempted removals. If this option is elected and the list is approved by the Government and maintained by the Contractor, the 24-hour notification requirement is mute for the remainder of the contract unless otherwise modified. | |
| (2) If a driver, other than the one specified 24 hours in advance for the specific TO; or, one whose name does not appear on the optional list of approved, multiple drivers arrive for pickup, the COR or other designated Government representative will verify the personnel switch with the Contractor before the pickup commences. This may require a written notice or fax from the Contractor. | |
| b. For Task Orders (TO) containing Expedited Removals, Services, or Performance CLINs, the Contractor shall notify the COR or other Government representative for each location in the following timeframes BEFORE attempting site visits, providing services, or removal efforts: 5 day expedites – at least 2 calendar days; and 4 days or less expedites – at least 1 calendar day. In addition, the Contractor is still required to provide the information identified in subparagraph (1) above at least 4 hours prior to removal. If applicable, any removals ordered under a 24-hour or one business day expedited CLIN requires the Contractor to provide the information identified in subparagraph (1) above at least 4 hours prior to pickups if the Contractor elects to provide the identity of the driver for each specific TO. (See Section 3.5 for additional information on expedite services CLINs). |
NOTE: If the Contractor elects to provide the list of approved, multiple drivers designated for use under this contract, this expedited notification is not required. All other terms and conditions stated in the Contract will apply to any of the aforementioned Expedited Removals, Services, or Performance CLINs.
NOTE: Rapid Gate and/or DBIDS may be mandatory for access to some DOD facilities. See 1.1.8 for further information. Where DBIDS is deployed, the 24-hour advance notification in Paragraph 1.1.4 is not required. At some Military Installations the Contractor and/or Subcontractors may be required to be escorted to and from the place of duty. This requirement is for both safety and physical security purposes. Contractors, their employees, agents, or any Subcontractors are required to remain at the designated work area until released or escorted by the COR or other Government representative.
1.1.5 TRAILER SECURITY, PADLOCKS
| a. All Contractor trailers and tankers capable of being padlocked must be padlocked upon arrival at the pickup location. Failure to meet this requirement could result in the Government’s halting of the pickup. All trailers and tankers capable of being padlocked must also be padlocked again prior to departure of the pickup location(s). The driver shall provide the padlock and lock the trailer or tanker without assistance from the COR or other Government representative. |
| b. The COR or other Government representative has the right to request any identification and/or occupational endorsements from the driver beyond what is identified in additional specific sections in this contract and refuse commencement and/or completion of pickups if any unusual or suspicious actions occur. Any potential demurrage associated with the driver verification process and/or the unexpected halt or commencement of pickups will not be grounds for reimbursement by the Government. |
1.1.5 RESERVED
1.1.6 HOURS OF OPERATION
| a. The service to be performed under this contract shall be performed during normal Government working days, as applicable for the site(s) on the TO, with specific office hours available from the COR on the TO, except for Federal holidays. Work that cannot be completed by close-of-business for the TO site(s) shall be discontinued and resumed the next business day, unless approved by the KO. Services will not be scheduled to be performed on a regular Federal holiday (see below), or one designated by Presidential proclamation. | |
| New Year’s Day - 1 January* | |
| Martin Luther King's Birthday - 3rd Monday in January |
Presidents Day - 3rd Monday in February
| Memorial Day - Last Monday in May |
| Independence Day - 4 July* |
| Labor Day - 1st Monday in September |
| Columbus Day - 2nd Monday in October |
| Veterans Day - 11 November* |
| Thanksgiving Day - 4th Thursday in November |
| Christmas Day - 25 December* |
*The holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.
b. Installation specific normal hours of operations for this contract are available upon request from the COR. This contract is for various military and Government activities of which may have different work schedules. Excluding weekends and observed Federal holidays, the Contractor agrees that, for those portions of the services provided on a Government installation, the services will be provided during the normal hours of operations for the installation.
1.1.7 PUBLIC AFFAIRS COORDINATION
The Contractor shall refer all inquiries concerning this contract to the KO. Under no circumstances shall any statement be released to the news media directly by the Contractor or any agents of the Contractor.
1.1.8 DBIDS INSTALLATION ACCESS
a. Navy and Marine Corps installations now require that all Contractors and their representatives be enrolled in the Defense Biometric Identification System (DBIDS) to gain access to these installations. DBIDS replaces the former Rapid Gate access system and also requires a security background check for all Contractors and their representatives.
b. For DBIDS enrollment information, go to: https://www.cnic.navy.mil/om/dbids.html.
1.1.9 ENVIRONMENTAL MANAGEMENT SYSTEM
DLADS implemented an Environmental Management System (EMS) in accordance with ISO 14001:2004(E), DOD and DLA requirements at all DLADS appropriate facilities. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy of an organization. The DLADS EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities and authorities while supporting the DLADS mission. The DLADS EMS program is explained in the agency EMS Core Instruction. Site supplements may detail information required by EMS at a local level such as local, state and host environmental regulations as well as local emergency procedures and operating procedures unique to the location. Site supplements also contain information concerning the local interaction between the DLADS tenant appropriate facility and the DOD/DLA host facility EMS program. Contractors and their personnel are required to be aware that each DLADS appropriate facility has an EMS and to be aware of EMS policies to perform work and/or gain access to an installation. Each DLADS appropriate facility maintains EMS awareness posters that identify the DLADS Environmental Management Representative (EMR) and Host facility EMR for specific guidance concerning an individual facilities’ EMS program. Contractors may request current copies of EMS information identified in this paragraph by contacting the local COR.
1.1.10 CONTRACTOR PERSONNEL
All Contractor personnel performing work under this PWS shall be qualified via training and experience, commensurate with the duties being fulfilled, to the minimum requirements under relevant 29CFR-OSHA, 40CFR-EPA, 49CFR-DOT, EM 385 standards, and updates thereto. The Contractor shall be responsible for all initial and refresher training required by contract personnel and it shall be completed in the appropriate timeframes. Upon request by the Government, the Contractor shall provide proof that these trainings were completed.
1.2 REMOVAL
1.2.1 SPILL RESPONSIBILITY
| a. The Contractor and/or Subcontractor shall have a serviceable, compatible and operable spill kit(s) on-site to capture and contained the spill or released. The Contractor is solely responsible for cleanup and proper disposal of all spills or leaks during the performance of this contract that occur as a result of, or are attributed to, the actions of its agents, employees, or Subcontractors to the satisfaction of the Government and at no additional cost to the Government. Hazardous waste spill cleanups that occur as a result of, or are attributed to, the actions of its agents, employees, or Subcontractors shall be removed off-site within 72-hours of the cleanup. Under extenuating circumstances and with approval of the host’s Environmental Office, hazardous waste spill cleanups may be allowed to move to a permitted Satellite Accumulation Area until it can be shipped off-site. The Contractor shall prepare a separate manifest for the spill cleanup removals. |
| b. The Contractor shall report all such spills or leaks, regardless of their quantity, to the COR (if not already present) and the KO immediately upon discovery. The Contractor shall adhere to all Host or Installation spill reporting and clean-up requirements. A written follow-up report shall be submitted to the KO not later than 24 hours after the initial telephonic report. The written report shall be in narrative form and as a minimum include the following: |
(1) Description of material spilled (including identity, quantity, manifest number, etc.).
(2) Whether quantity spilled is EPA/state reportable, and if so, whether it was reported.
| (3) Exact time and location of spill, including a description of the area involved. |
| (4) Containment procedures initiated. |
(5) Summary of any communications Contractor has with anyone other than the KO.
(6) Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue.
1.2.2 SEGREGATION OF HAZARDOUS WASTE
All items collected on this contract must be segregated according to the current EPA Hazardous Waste Compatibility Chart, and kept physically separate from any containers not associated with this contract until the initial TSDF is reached. The items must be so marked, that they are readily linked to this contract throughout this period. The Contractor may bring other waste onsite while conducting Milk Runs, or picking up waste at multiple locations, as long as the waste is listed on the current DO being picked up.
1.2.3 STATEMENT ON CONTAINERS
The Generator is responsible for ensuring their containers are DOT shippable, i.e., IAW current DOT regulations and standard TSDF acceptance. The Contractor is responsible for all repackaging costs associated with special container acceptance criteria at the TSDF.
1.2.4 GOVERNMENT EQUIPMENT & PERSONNEL
The Government shall not furnish any equipment or personnel to assist in the performance of this contract. Any such offers of assistance are unauthorized, and the Contractor shall not accept any such offers. The only exception is the use of Government-owned loading equipment (Section 1.2.6), and Government-owned scales (Section 1.2.7), and where applicable, management services.
1.2.5 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT FACILITIES
| a. Treatment of hazardous waste (including solidification) on Government facilities is not permitted. Treatment is defined as any process which meets the definition of treatment as identified in 40 CFR 260.10 and/or the facility Permit. |
| b. The Contractor shall not drain and/or flush PCB items at Government facilities. Draining will be allowed only to prevent leaking and to meet DOT regulations. |
| c. Treatment, disposal, or release of gases, other than inert gases, to the atmosphere on Government premises is not permitted by this contract. The Contractor may perform gas extraction for other than inert gas cylinders at the pickup location using a self-contained apparatus. This apparatus shall emit no gas into the atmosphere, and purge the entire cylinder contents into a closed receiver for transport to a recycling or disposal site. |
1.2.6 LOADING
| a. The Contractor is responsible for loading, including furnishing all the equipment necessary for loading. The Government will not block, chock, brace, lash, band, or in any other manner, secure the cargo on such conveyance(s) furnished by the Contractor. |
| b. The Government may offer to assist the Contractor/Subcontractor with loading during normal hours of operation if the appropriate personnel and equipment are available for use. If the offer is accepted by the Contractor, the Government will make the initial placement or “tailgate” the item(s) on conveyance furnished by the Contractor. The initial placement will be as determined by the Government. |
The Government may tailgate loads at the following locations:
| Location |
| Item(s) |
| AMSA 89, Galax, VA |
| Drums |
| Monteith USARC, Richmond VA |
| Drums |
| ECS 88, Blackstone, VA |
| Drums |
| Denit USARC, Marion, VA |
| Drums |
| Maneuver Training Center-Fort Pickett, Blackstone, VA |
| Drums |
| US Army Garrison & Fort Lee, Bldg. 7123, Fort Lee, VA |
| Drums and Bulk Solid |
| Bldg. 27401 Hot Patch Road, Quantico VA. |
| Drums and Bulk Solid |
1.2.7 WEIGHING OF ITEMS
a. Government scales will be used when available, operable, and authorized by the Government. The Contractor shall be responsible for determining the availability of Government scales. All scales used for purposes of this contract shall be calibrated IAW applicable regulations. The Government shall ensure that Government scales are operable and accurate through certification or demonstration. The Contractor shall ensure that non-Government scales are operable and accurate through certification or demonstration.
At the Government's option, the use of Government scales will be allowed at the following sites:
| SITE |
| EQUIPMENT AVAILABLE |
NSWC Dahlgren 17320 Dahlgren Road, Bldg. 1425 Dahlgren, VA Table Scale (200 lb. capacity)
NSWC Dahlgren 17320 Dahlgren Road, Bldg. 1425 Dahlgren, VA Floor Scale (1000 lb. capacity)
Marine Corps Base Bldg. 27401 Quantico, VA Platform Scale (2,000 lb. capacity)
Directorate of Logistics 5775 General Washington Dr.
Alexandria, VA Platform Scale (5,000 lb. capacity)
Defense Depot Richmond Virginia (DDRV) 8000 Jefferson Davis Highway, Bldg. 40 Richmond, VA Pallet Scale
Maneuver Training Center – Fort Pickett Kemper Ave.
VAFP-EE Bldg. T-2361 Blackstone, VA PA Scale 6600 (5,000 lb. capacity)
US Army, Fort Belvoir Bldg. 1495 Fort Belvoir, VA Pallet Scale (5,000 lb. capacity)
US Army, Fort Belvoir Bldg. 1495 Fort Belvoir, VA Building 1490 (2,500 lb. capacity)
US Army, Fort Belvoir Bldg. 1089 Fort Belvoir, VA Truck Scale (55,000 lb. capacity)
Pentagon Receiving Area 100 Washington Blvd.
Washington, DC Platform Scale (4,000 lb. capacity)
Pentagon Receiving Area, Bay 5 100 Washington Blvd.
Washington, DC Platform Scale (10,000 lb. capacity)
Pentagon Hazmat Storage Area, Bay 5 Washington, DC Platform Scale (5,000 lb. capacity)
Defense Supply Center Richmond
(DSCR-SD)
8000 Jefferson Davis Highway Richmond, VA Truck Scale
US Army Garrison & Fort Lee Bldg. 7123 Fort Lee, VA Pallet Scale (5,000 lb. capacity)
| Dahlgren NSASP, Bldg. 1425 |
| Roll around set scale (1,000 lb. capacity) Digital scale (0.05 to 50 lb. capacity) |
| Fort A.P. Hill, Bldg. 1237 |
| Platform Scale (1,000 lb. capacity) |
b. Before loading, the Contractor is required to weigh the waste hauling vehicle, trailer, and/or rolloff/vacuum box, as applicable, to establish the empty (tare) weight of the rolloff box, dump truck, tanker truck, etc. This weight will be documented on a certified weight ticket and provided to the COR. After loading, the Contractor is required to weigh the waste hauling vehicle, trailer, and/or rolloff/vacuum box, as applicable, to establish the loaded (gross) weight of the conveyance. This weight will be documented on a certified weight ticket and provided to the COR. The actual (net) weight of the waste shall then be calculated by subtracting the tare weight from the gross weight. When onsite Government scales are available, weights must be agreed upon by both the Contractor and the Government before removal. When offsite commercial scales must be used, a certified weight ticket will be provided to the COR and shall be the basis for payment to the Contractor.
1.2.7.1 TASK ORDER (TO) ADJUSTMENTS
All TO weights are estimated amounts. The Contractor can expect that the quantities will be required to be adjusted upward or downward as removals take place. Therefore, the Government has the unilateral right to increase the TO weight in those instances where the Government has underestimated the amount of weight that is required to be removed so the Contractor can continue performance. The Government has the unilateral right to decrease the TO weight in those instances where the Government has overestimated the amount of weight that is required to be removed. In instances of decreasing weight, these decreases are not subject to FAR 52.212-4, termination for convenience coverage. In addition, it is agreed that it is acceptable for the Government to issue TO modification (i.e. quantity changes, noun descriptions, CLIN/HIN changes, adding/deleting lines, extending TO end dates, etc.) unilaterally. The Contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If upon receipt of a unilateral TO modification, the Contractor does not agree with the change or changes, the Contractor reserves the right to seek resolution with the KO. These modifications are only against TOs. No changes are made to the terms and conditions of the contract.
1.2.8 DEFINITIONS, BULK & CONTAINERIZED WASTE
1.2.8.1 BULK WASTE
| a. The term Bulk Waste refers to waste that is typically removed via rolloff boxes, vacuum or sludge boxes, dump trucks, tank trucks, vacuum trucks, pump trucks, and trucks with vacuum-loaded or pump-loaded tanker trailers. Pumpable liquid wastes that are removed via totes, also known as portable tanks and Intermediate Bulk Containers (IBC), are also considered bulk waste and have a surcharge associated with them, i.e., Tote Surcharge CLIN 6386TS. Bulk waste does not refer to containerized wastes including waste contained in drums, cubic yard boxes, military tri-wall boxes, cubic yard bags or “super sacks”, lamp boxes, cylinders, or palletized waste. |
| b. The term Heavy Solids used in this document and the Price schedule refers to heavy debris (as defined in 40 CFR 268.2(g)) and bulk waste solids/sludges with a density greater than 600 Lbs/yd3 shall be ordered using the bulk CLIN Suffix (B1, B2, B3, or B4). The CLIN Suffix is assigned based on the net weight of each heavy bulk load. If a bulk load with a net weight of less than 10,000 Lbs is ordered, the bulk CLIN Suffix “B1” will be used. Loads weighing 10,000 to 20,000 Lbs will be assigned the bulk CLIN Suffix “B2”. Loads weighing 20,000 to 30,000 Lbs will be assigned the bulk CLIN Suffix “B3”. Loads weighing more than 30,000 Lbs will be assigned the bulk CLIN Suffix “B4”. Weights shall be determined using certified Government scales when available, or certified commercial scales when Government scales are not available. Prior to removal, and when possible, the net weight of the waste shall be determined and agreed upon by both the Government representative and the Contractor. |
| c. The term Debris used in this document and the Price schedule refers to (a) solid artifacts, fragments, or rubbles which are present, but not primarily present, and are intermingled or suspended in an otherwise fully solid, liquid, or sludge waste stream as described above, or (b) a waste stream which meets the definition of debris in 40 CFR 268.2(g). Note: Definition (a) in this section would meet the “Mixed” or “Various” Physical State designation indicated in the Price schedule for this contract, as CLINs with a “Mixed” or “Various” physical state refers to solids, liquids, sludges, debris, or any combination thereof. Definition (d) in this section meets the “Debris” Physical State designation indicated in the Price schedule for this contract. |
| d. The term Lightweight Solids used in this document and the Price schedule refers to light debris (as defined in 40 CFR 268.2(g)), and bulk waste solids with a density of less than or equal to 600 Lbs/Yd3. These waste streams are considered lightweight and shall be ordered using the Cubic Yard CLIN Suffix “B6”. Cubic yards (yd3) are calculated by visual estimation. For example, if a 20-yd3 rolloff box appears 90% full, the removal will be estimated and ordered at 18 CD. Note, any CLIN with a “B6” suffix will be ordered using “CD” to denote cubic yards. When ordering a B6 CLIN suffix, the Government will order disposal of the waste based on a minimum of 75% of the volumetric capacity of the associated rolloff. For example, if a 20 cubic yard rolloff contains 12 cubic yards of debris (B6), the Generator shall pay for disposal of 15 cubic yards, or 75% of the rolloffs volume. Prior to removal, the volume shall be determined and agreed upon by both the Government representative and the Contractor. |
| e. Base CLIN TX06 is uniquely designed around the treatment technology of Microencapsulation of hazardous debris. Base CLIN TX07 is uniquely designed around the treatment technology of Macroencapsulation. When ordering Base CLIN TX06 in conjunction with Bulk CLIN Suffixes B1, B2, B3, B4, or B6, the Generator will ensure that the waste stream does not contain pipes, hoses, tubes, equipment, or rigid objects greater than 10 feet in any dimension, where toxic metal surfaces cannot be easily coated with a microencapsulation coating material. In such cases where these types of articles are present in bulk loads, Base CLIN TX07 should be considered (maximum size is 18’L x 4.5’W x 4.5’H). Furthermore, intact containers (Per 40 CFR 268.2(g)) do not meet the definition of debris and shall not be turned in under Base CLINs TX06 or TX07. Intact containers are those containers “that are not ruptured and that retain at least 75% of their original volume”. When intact containers are present, the Generator should consider using “Lab Pack/Loose Pack” CLINs. |
| f. The term Solid(s) used in this document and the Price schedule refers to solid material which is largely free of free liquids, e.g., soil, silt, sand, gravel, filter cake, powder, granules, crystals, fines, and artifacts that do not meet the definition of debris as defined in 40 CFR 268.2(g)). |
| g. The term Liquid(s) used in this document and the Price schedule refers to liquid material which is pumpable by conventional pumping devices designed to pump low-viscosity liquids and largely free of suspended or settled (vs. dissolved) solids. A liquid that has become frozen due to ambient freezing temperatures, but would otherwise be of liquid state at 72°F, will still meet the definition of liquid for purposes of this contract. |
| h. The term Sludge(s) used in this document and the Price schedule refers to material that is either (a) a multiphasic material with some combination of a liquid phase and a solid phase as defined above, (b) a slurry or mud-like material, such as liquid-saturated soil or tank bottoms, whereby solids are largely or completely suspended in liquid and typically flows under gravity, and may or may not be conveyable by high capacity pumping or vacuuming devices designed to move heavy material, or (c) a highly viscous liquid not pumpable by conventional pumping devices designed to pump low-viscosity liquids. |
| i. Bulk waste liquids will be pumpable by conventional pumps typically used on tank trucks and trailers, even if loaded by vacuum truck or trailer, and shall be ordered using the CLIN Suffix B5, indicating gallons (GL). When removed via tanker or vacuum truck, a 1,500-gallon (GL) minimum charge for bulk liquids will apply and be ordered, as appropriate. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.