Acceptable Performance Levels

View the file

Other files

File Type Posted
Amendment_2_revised_Bid_Schedule.xlsx XLSX spreadsheet
SF30_17R14_amendment_0002.doc DOC document
Copy_of_1.2_FINAL_W_AFFF_Attachment_01_-_Schedule_of_Services_20170623_PBR_wo_pr....xlsx XLSX spreadsheet
PPI__Offeror_Questionnaire_-_Updated_12-7-2016.pdf PDF
FINAL_PWS_SP453017R000X_20170623_PBR.docx DOCX document
SF30_17R14_amendment_0001.doc DOC document
5.0__Attachment_5_-_Hazardous_Waste_Profile_Sheet__DLA_Form_2511_(Formerly_DRMS_For_1930).pdf PDF
20.0_Attachment_20_-_Qualified_Facility_List_Application__DLA_Form_2507-1.pdf PDF
21.0_Attachment_21_-_Qualified_Facility_List_Update__DLA_Form_2507-2.pdf PDF
11.0__Attachment_11_-_Evaluation_Data_for_Rejected_Refused_Cylinders.rtf RTF text file
8.0_Attachment_08_-_Example_of_a_Certificate_of_Recycling.docx DOCX document
3.0_Attachment_03_-_Acronyms.doc DOC document
13.0_Attachment_13_-_Task_Order_DD_Form_1155.docx DOCX document
9.0_Attachment_09_-_Sample_PCB_Tracking_Log.xlsx XLSX spreadsheet
SP4500-17-R-0014,_Guam.pdf PDF
3.5_Attachment_3.5_-_Pick_Up_Locations.docx DOCX document
4.0_Attachment_4_-_HW_Profile_Sheet_DRMS_Form_1930.pdf PDF
12.0_Attachment_12_-_Removal_of_Compressed_Gas_Cylinders_From_Accountability.docx DOCX document
6.0_Attachment_06_-_Sample_Pick_Up_Manifest_Tracking_Log.xlsx XLSX spreadsheet
2.0_Attachment_02_-_Definition_of_Terms.docx DOCX document
18.0_Attachment_18_-_Application_for_ID_Card_DEERs_Enrollment_DD_Form_1172-2.pdf PDF
19.0_Attachment_19_-_Manifest_Tracking_Log_DLA_Form_2505.pdf PDF
14.0_Attachment_14_-_Transporter_Qualification_Review_Application_DLA_Form_2503.pdf PDF
7.0_Attachment_07_-_Example_of_a_Certificate_of_Destruction.doc DOC document
1.0_Attachment_01_-_Schedule_of_Services_20170327_PBR.xlsx XLSX spreadsheet
15.0_Attachment_15_-_Issue_Release_Receipt_Document_-_DD_Form_1348-1A.pdf PDF
17.0_Attachment_17_-_System_Authorization_Access_Request_DD_Form_2875.pdf PDF
10.0__Attachment_10_-_Example_of_a_Certificate_of_Demilitarization.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16.0 ACCEPTABLE PERFORMANCE LEVELS

a. Acceptable Performance Level is the minimum performance of each requirement before the Government considers performance unsatisfactory. Specification of an acceptable performance level does not allow the contractor to knowingly provide defective service; it is recognition of the fact that defective performance may sometimes occur unintentionally. As long as the performance percentage does not fall below the specified acceptable performance level, the Government will not deduct for poor performance. However, the Contractor shall be required to re-perform or correct the defective service or product at no additional cost to the Government.

b. The surveillance method shall be from Collection Summary Report(s) (CSR) furnished by the COR, customer feedback, and tracking of final disposal/recycling document submittals. All negative and positive actions/performance shall be the basis for monetary deductions and/or past performance annotations.

c. Performance incentives for the contractor shall include, but are not necessarily limited to, favorable impact on option exercise decisions, future awards of the same requirement, and future awards of similar requirements by DLA Disposition Services as well as other Government and non-Government entities that may review performance of this contract.

COLUMN A
COLUMN B
COLUMN C
COLUMN D
COLUMN E
COLUMN F
COLUMN G
COLUMN H
DELIVERABLE
PHASE
STANDARD
TIME FRAME
Including, but not restricted to Section
ACCEPTABLE PERFORMANCE LEVEL (APL)
REDUCTION FOR FAILED APL
METHOD OF SURVEILLANCE
Compliant Removal
Pre-Removal
Submittal of Shipping Documents
1-5 days, depending on removal time
1.1.2
No more than 5 returnable submittals during a 12 month period of time
A disincentive fee of 3% shall be applied to each task order returned for corrections after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed criteria in column F.
Collection Summary Reports (CSRs), Customer and COR input
Pre-Removal
Notifications
Same as above
1.1.3
No more than 5 late notifications during a twelve month period of time
A disincentive fee of 3% shall be applied to each task order with late notification after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed criteria in Column F.
Collection Summary Reports (CSRs), Customer and COR input
Removal
Safe, Compliant, Timely Removal and Transportation
1-30 days as required per task order
1.0
No more than 5 late removals during a twelve month period of time
A disincentive fee of 3% shall be applied to each late task order after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed criteria in Column F.
Collection Summary Reports (CSRs), Customer and COR input
Post-Removal
Compliant transportation, interim storage and shipments to initial qualified TSDF
Return of manifest or shipping documentation IAW 40 CFR 262.42, state equivalent and copy to Disp Svcs within the contract 35 day period.
1.3.1
No more than 5 non-compliant transportation or storage and ultimate shipment to an initial TSRDF/TSDF during a twelve month period of time
A disincentive fee of 10% shall be applied to each non-compliant transportation or storage and shipment to an initial TSRDF/TSDF storage task order after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed the criteria in Column F.
Collection Summary Reports (CSRs), Customer and COR input
Post-Removal
Timely delivery to qualified TSDF/TSRDF
Return manifest timely to eliminate potential exception report. (by the 45th day after removal)
1.3.1
No more than two (2) exceptions reports received per generator during a 12 month period of time
A disincentive fee of 10% shall be applied to each task order with a late return manifest after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed the criteria in Column F.
Collection Summary Reports (CSRs), Customer and COR input
Compliant Disposal and/or Recycling
Disposal / Recycling
On time, proper disposal or recycling IAW hazardous waste regulations and contract requirement
225 days for disposal of all items with a disposal method other than destructive incineration (and 270 days for Phase II documentation).

315 days for disposal of all items with a disposal method of destructive incineration (and 360 days for Phase II documentation).

2.0 & Instructions to Contractors-“Period of Performance” & “Docu- Mentation Requirements DLA Disposition Services Acceptance, Invoicing and Tracking.”

No more than 3 late disposals during a 12 month period of time
A disincentive fee of 10% shall be applied to each line item disposed of late after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed the criteria in Column F.
KO/COR Reports, Tracking, DSS, Customer Input
Compliant Special Services
As specified on TO
Timely, compliance, accurate service(s)
As stated in contract for service specified
2.0-2.9
No more than 3 late performances during a 12 month period of time
A disincentive fee of 10% shall be applied to each line item not completed timely or accurately after the contractor exceeds the criteria stated in Column F until such a time as performance again does not exceed the criteria in Column F.
KO/COR Reports, Tracking, DSS, Customer Input
Delivery of certificates of disposal and/or recycling.
Timely provision
As stated in contract for service specified
2.1.2
No more than 5 late certificates during a 12 month period of time
A disincentive fee of 3% shall be applied to each line item with a late certificate after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed the criteria in Column F.
Customer, COR and KO review and input
Compressed Gas Cylinder Related Special Services
Timely reporting
As stated in contract for service specified
2.3
No more than 5 untimely reports during a 12 month period
A disincentive fee of 5% shall be applied on all line items related to the reporting requirement after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed the criteria in Column F.
Customer, COR and KO review and input

* The Government reserves the right to also conduct additional surveillance/review of final tracking information and/or delay all payments until after final tracking information is received if warranted by performance problems in this area.