SP450017R0001_Hill_AFB_Final.pdf

PDF 599 KB Posted

Attached to
Hazardous Waste Removal and Disposal at Hill AFB and surrounding locations
Solicitation number
SP4500-17-R-0001
Issued by

About this file

Solicitation SP4500-17-R-0001

View the file

Other files

File Type Posted
Q&A_(4_Apr_2017).pdf PDF
Bid_Schedule_(3_Apr_2017).xlsx XLSX spreadsheet
SF30_17R01_Am02.pdf PDF
SF30_17R01_Am01.pdf PDF
Bid_Schedule_(Excel_Spreadsheet).xlsx XLSX spreadsheet
Attachment_3-_Past_Performance_Questionnaire.pdf PDF
Attachment_2-_DoL_Wage_Determination.pdf PDF
12_Month_Order_History_12D14.xls XLS spreadsheet
Attachment_1-_List_of_Pickup_Points.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 1000050903

1. REQUISITION NUMBER

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

SP4500-17-R-0001

5. SOLICITATION NUMBER

2017 FEB 04

6. SOLICITATION ISSUE

DATE

Reid BLOSSER DRB0134

a. NAME

Phone: 269-961-5131

b. TELEPHONE NUMBER (No Collect calls)

2017 MAR 10

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY CODE SP4500

DLA DISPOSTION SERVICE - EBS

DLA DISP SVCSS HAZ CONTRACT

74 NORTH WASHINGTON

BATTLE CREEK MI 49037-3092

USA

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

562211NAICS:

SIZE STANDARD:

11. DELIVERYFOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

SEE SCHEDULE

81PAGE 1 OF

03:00 PM

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE ADDENDUM

EDWOSB

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012) BACK

36. PAYMENT

PARTIAL FINAL

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42b. RECEIVED AT (Location)

CONTINUED ON NEXT PAGE

Notes to Offerors

1. This contract is a firm-fixed price indefinite delivery/indefinite quantity (IDIQ) contract written as a performance based contract and allows the Contracting Officer to make monetary deductions and/or a negative mark on the Contractor’s Past Performance when an Acceptable Performance Level (APL) is not met.

2. This contract consists of two 30-month performance periods.

3. Pricing for containerized waste will largely be based upon container sizes and the assigned disposal profile, rather than pricing on a per pound basis.

4. Generators are responsible for ensuring their containerized wastes sent for disposal via this contract are in Department of Transportation (DOT) shippable packaging.

5. The Tooele South facility requires Certificates of Disposal for all their waste, which is to be included in the unit price.

6. This contract is for various military and Government activities, which may encompass multiple states.

Standard removal timeframe for containerized waste at all sites is 14 calendar days from the date of order issuance. The Contractor agrees that, for those portions of the services provided on a Government installation, the services will be provided during normal hours of operations for the installation, which are available, upon request, from the COR.

7. This contract requires the transportation and disposal of RCRA hazardous wastes, non-RCRA wastes, State-Regulated wastes, Non-State Regulated wastes, Compressed Gas Cylinders, and Polychlorinated Biphenyls (PCBs).

8. Some CLINs ordered under this contract require the Contractor to provide Certificates of Destruction or Disposal (CD), e.g., certain Demilitarization items and PCB-related wastes. The Contractor is cautioned to closely read all CLIN descriptions where such requirements are indicated. Unless explicitly required and written into this contract, only those CLINs requiring CDs, as described in the Bid Schedule, will require that the Contractor provide a CD.

9. Publications and attachments applicable to this contract will be made available upon request. It should be noted that during the solicitation and life of this contract, the Government may make changes, additions, or deletions to those listed.

10. The Contractor is cautioned that some requirements for information and plans are required before start of work on this contract, i.e., Sections 1.1.1 and 2.1.4.

11. The Contractor is cautioned that all tank cleaning CLINs will include the team leader, technician(s), PPE, and mobilization of all equipment used to perform these services. The Contractor should bid accordingly.

12. Within 14 calendar days after Award, the Contractor shall provide DLA Disposition Services with a list referencing all intended interim and final disposal/recycle facilities by EPA ID number (where applicable) for every Base CLIN listed in the Bid Schedule of this contract and the Contractor will provide the detailed waste acceptance criteria and a copy of the pertinent Permit(s) from the WWTP(s) which the Contractor may choose to utilize for disposal of wastewater; see Facility-CLIN Assignment Sheet. The purpose for this is to allow the Government to assign in DSS those facilities that will or might receive those CLINs for treatment, storage, and disposal. If this is not done, Task Orders (TO) cannot be processed in DSS.

13. The email address for submission of offers is reid.blosser@dla.mil. All offers submitted will receive a confirmation email from the contract specialist. If you do not receive a confirmation email, contact Reid Blosser at 269-961-5131 before the close of the solicitation.

PAGE 3 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SP4500-17-R-0001

CONTINUED ON NEXT PAGE

14. Reference projects/contracts and corresponding reference surveys are limited to three projects/contracts considered by the offeror to be the most relevant to the requirements of this solicitation. If more than three projects/contracts with reference surveys are received, the Government will consider the first three projects/contracts received based upon the date and time the reference surveys are received.

15. The Government intends to evaluate offers and award a contract without discussions with offerors.

Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.

LIST OF ATTACHMENTS

This solicitation/award consists of the following attachments:

Attachment 1- List of Pickup Points

Attachment 2- DoL Wage Determination (96-0223) Revision 36, dated 01/05/2016

Attachment 3- Past Performance Information Questionnaire

PAGE 4 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

Form

TECHNICAL REQUIREMENTS

THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN ‘R’ OR AN ‘I’ NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN

WHICH CASE THE AMENDMENT DATE CONTROLS.

PWS

Table of Contents

PERFORMANCE WORK STATEMENT

1. REMOVAL

1.1 PRE-REMOVAL

1.1.1 PERMIT/SPECIAL REQUIREMENTS

1.1.2 SHIPPING DOCUMENTATION

1.1.3 NOTIFICATIONS

1.1.4 TRAILER SECURITY, PADLOCKS

1.1.5 HOURS OF OPERATION

1.1.6 PUBLIC AFFAIRS COORDINATION

1.1.7 RAPID GATE SECURITY

1.1.8 ENVIRONMENTAL MANAGEMENT SYSTEM

1.2 REMOVAL

1.2.1 SPILL RESPONSIBILITY

1.2.2 SEGREGATION OF HAZARDOUS WASTE

1.2.3 STATEMENT ON CONTAINERS

1.2.4 GOVERNMENT EQUIPMENT & PERSONNEL

1.2.5 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT

FACILITY

1.2.6 LOADING

1.2.7 WEIGHING OF ITEMS

1.2.8 DEFINITIONS, BULK & CONTAINERIZED WASTE

1.2.9 BULK LIQUID PUMPING

1.2.10 BULKING & CONSOLIDATION

1.2.11 CHARGES FOR EXPEDITES

1.2.12 PACKAGING FOR COMPLIANCE

1.2.13 REQUIREMENTS FOR PROTECTIVE MASKS AND MEDICAL

SCREENING AT TOOELE SOUTH

1.3 POST REMOVAL

1.3.1 RETURN OF SHIPPING DOCUMENTATION

2. DISPOSAL/RECYCLING

2.1 RCRA/NON-RCRA ITEMS

2.1.1 TSCA/RCRA/NON-RCRA/STATE/NON-STATE REGULATED ITEMS

2.1.2 CERTIFICATES OF DISPOSAL, DESTRUCTION, & RECYCLING

2.1.3 DETAILED ANALYSIS

PAGE 5 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

2.1.4 ALTERNATE DOCUMENTATION OPTION FOR FUELS

BLENDING, ANTIFREEZE RECYCLING, BATTERY

RECYCLING/RECLAMATION, & FLUORESCENT LIGHT

TUBES & HIGH INTENSITY DISCHARGE LAMPS

2.1.5 RESERVED

2.1.6 EMPTY CONTAINERS

2.1.7 RESERVED

2.2 DISPOSAL OF PCB, PCB-RELATED WASTE

2.3 COMPRESSED GAS CYLINDERS

2.3.1 EVALUATION/IDENTIFICATION OF CYLINDERS

2.3.2 ANALYSIS TO IDENTIFY CYLINDER CONTENTS

2.3.3 RECONTAINERIZATION/REPLACEMENT OF VALVES

2.3.4 SURCHARGE FOR ZONE “A” POISON GASES

2.4 RECYCLING

2.4.1 RECYCLE/RECOVERY/RE-USE/RECLAIM

2.4.2 COMMODITY SPECIFIC RECYCLING REQUIREMENTS

2.5 DEMILITARIZATION

2.5.1 RESERVED

2.5.2 OTHER MILITARY ITEMS

3. SPECIAL SERVICES

3.1 RESERVED

3.2 TANK & WASH RACK CLEANING

3.3 PERFORM ANALYSIS

3.4 PREPARE WASTE PROFILE SHEET

3.5 IDENTIFY UNKNOWN WASTE STREAMS & PREPARE WASTE

PROFILE SHEETS

3.6 PROVIDE ROLLOFF STORAGE CONTAINERS & RENTAL CHARGES

3.6.1 CONTAINMENT/FRAC TANK

3.7 LAB PACKING SERVICES

3.8 RESERVED

3.9 BULK NON-RCRA WASTEWATER MANAGEMENT

3.10 TRANSPORTATION OF GOVERNMENT ROLLOFFS

3.11 WASTE STREAM DEFINITIONS

3.12 PROVIDE VACUUM TRUCK AND OPERATOR

3.13 MANDATORY INCINERATION WITH GOVERNMENT WITNESS

3.14 LAUNCH FACILITY (LF) AND MISSILE ALERT FACILITY (MAF)

BATTERIES AT HILL AFB

3.15 MANAGEMENT SERVICES – ANNUAL REPORTING REQUIREMENTS FOR

IDAHO GENERATORS

4. ACCEPTABLE PERFORMANCE LEVELS

5. USE OF FACILITIES AND TRANSPORTERS

5.1 QUALIFIED FACILITIES

5.2 QUALIFIED TRANSPORTERS

PAGE 6 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

5.3 ADDITIONAL TSDFS AND TRANSPORTERS

6. ADDITIONAL REQUIREMENTS

6.1 INDEMNIFICATION

6.2 REPORTING REQUIREMENTS

6.3 PACKING, MARKING AND LABELING

6.4 PLACES OF GOVERNMENT INSPECTION

6.5 CONTRACTOR REPRESENTATIVE

6.6 INCIDENTAL FEES

6.7 MANPOWER REPORTING REQUIREMENTS

7. PERIOD OF PERFORMANCE- INCLUDING DISPOSAL AND REMOVAL

8. DOCUMENTATION REQUIREMENTS, DLA DISPOSITION SERVICES ACCEPTANCE,

INVOICING AND TRACKING

8.1 SUBMISSION OF DOCUMENTATION TO FACILITATE ACCEPTANCE FOR

PAYMENT

8.1.1 ACCEPTANCE AND INVOICING

8.2 POST-PAYMENT TRACKING

8.3 REMEDIES FOR NON-COMPLIANCE

PAGE 7 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

PERFORMANCE WORK STATEMENT

a. The Government agrees that all items placed on a Task Order (TO) on this contract will be accompanied by documentation and markings that comply with all applicable local, state, and federal laws and regulations relating to the generation, storage and transportation of waste.

b. The Contractor agrees to provide all services necessary for the transportation, final treatment, disposal, and/or recycling of the items listed in the schedule in accordance with (IAW) all local, state, and federal laws and regulations, and the terms and conditions of this contract. These services shall include all necessary personnel, including applicable SubContractors, labor, transportation, equipment, and the compilation and submission of all documentation required by this contract. All items, regardless of the condition, are being discarded by the Government and will require recycling or disposal as identified via the ordered Contract Line Item Number (CLIN).

c. The six character CLIN consists of two parts. The term “Base CLIN” refers to the first four characters of the CLIN. The Base CLIN represents the waste description according to the waste profile for a particular wastestream. The term “CLIN Suffix” refers to the last two characters of the CLIN. The CLIN Suffix designates the unit of measure for purposes of tracking and Contractor payment. Example:

Base CLIN “CS01” represents Corrosive Acids, Inorganic other than HF and HNO3, <50% in Water, and the CLIN Suffix “C4” designates the unit of issue as a 55-Gallon Container. Accordingly, one (1) 55-gallon drum of this waste would be represented by ordering one (1) Each of CLIN CS01C4. See Profile-Based CLIN Guidelines and Master CLIN Schedule at http://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/HazWasteDisposal.aspx for more details.

1. REMOVAL

The requirements for removal of wastes under this contract are divided into three main phases: Pre- Removal (1.1), Removal (1.2), and Post-Removal (1.3). The Contractor and their Subcontractors must perform at all times in a prudent, conscientious, safe, and professional manner. The Contractor shall ensure that its agents, employees, and Subcontractors involved in handling and packaging the hazardous waste be trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Material Handling equipment and Personal Protective Equipment (PPE) shall be provided by the Contractor, unless otherwise stated, and must be appropriate to ensure safe handling of the hazardous waste. While operating on a Department of Defense (DOD) facility, the Contractor may be required to use forklifts.

Contractor-operated forklifts must meet specifications listed in the applicable permit. The Contractor agrees that all personnel and equipment used in the performance of this contract are subject to safety inspections by Government personnel while on federal property.

PAGE 8 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

http://www.dla.mil/DispositionServices/Offers/Disposal/HazardousWaste/HazWasteDisposal.aspx

Tooele South – Safety regulations and procedures for work on this contract are available for review at the servicing DLA Disposition Services site. Contractor’s onsite personnel will be required to carry copies of their training records in their vehicles while on Tooele South. Government personnel may inspect these records at any time. At time of award, the Contractor shall submit copies of Waste Handling Operating Procedures for all activities related to the performance of this contract. Such procedures included, but are not limited to sampling procedures, loading procedures, trans-loading procedures, and washout procedures.

1.1 PRE-REMOVAL

1.1.1 PERMIT/SPECIAL REQUIREMENTS

a. The Contractor shall, without additional expense to the Government, be responsible for paying all fees, preparing or obtaining any necessary licenses, permits, notifications, waste profiles, or reports, which result from a Contractor’s transportation, recycling, or disposal decision. This includes acquiring any required permits or registrations necessary to operate on any installation listed in this contract and completing the Notification of Regulated Waste Activity form for the Generator(s) of hazardous waste to sign and file with the applicable state regulators for waste disposal. This includes signing (on behalf of the Government) waste profiles requested by Treatment, Storage, and Disposal Facilities (TSDF). All Contractor-signed waste profile sheets shall be written for the actual wastestream using the Generator’s profile for backup documentation. All Generator forms or other means of notifications including correspondence with federal or state agencies on behalf of a Generator must be coordinated with and concurred with by the affected Generator prior to submission to any federal or state agency. A copy of all forms and relevant documentation, including correspondence shall be provided to the COR.

b. The Contractor may be required to attend special training, seminars, instructions, classes, safety orientations, etc., provided by the Government or to provide information to perform work or gain access to the installation. Example: pass and ID requirements, antiterrorist training, Environmental Management System (EMS) policies, and/or forklift training.

c. The Contractor shall use only the facilities and transporters from the DLA Disposition Services Qualified Facilities List (QFL) and Qualified Transporters List (QTL), see Section 5.

d. Any import or export shipment outside the United States must comply with all international agreements and all applicable foreign laws. If the Contractor will be exporting directly from the DOD activity, the Contractor is required to provide a current copy of the Acknowledgment(s) of Consent to the Contracting Officer Representative (COR) with the shipping documentation IAW Section 1.1.2.

e. The Contractor may not ship waste outside of the United States to circumvent Environmental Protection Agency (EPA) Land Disposal Restrictions (LDR) unless domestic treatment capability does not exist or domestic facilities are unable to meet EPA LDR requirements within the United States (e.g., Lithium batteries). High level mercury (>260 mg/kg) will not be exported outside the United States.

1.1.2 SHIPPING/DISPOSAL DOCUMENTATION

a. All references to manifests in this provision refer to the appropriate shipping papers.

Prior to removal from a site identified as a pickup point in this contract, completed copies of all manifests and LDR notifications shall be furnished to the Disposition Services Field Activity coordinating the waste disposal. All documentation shall be clearly marked with the name of the

PAGE 9 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

servicing Disposition Services Field Activity in addition to the Generator, contract, and TO number, as applicable. Emergency response information and 24-hour emergency phone numbers shall be listed on the manifest. If blocks for emergency information are not provided, this information shall be placed in the upper right-hand corner of each document.

The Contractor shall provide the COR or the Contracting Officer Technical Representative (COTR) with a copy of the completed form(s) for review by the appropriate Government official at least five (5) business days prior to removal for containerized waste and at least two (2) business days prior to removal for bulk waste. Notifications for expedited orders shall be performed IAW timeframes as listed in Section 1.2.11.

NOTE: All incoming mail at Tooele South and Deseret Chemical Depot goes through the Receiving Department before delivery to Waste Management, which may take one to three days before delivery.

b. Mock EPA ID numbers created by DLA Disposition Services for use at non-RCRA TSDFs must be entered on all applicable shipping documentation such as non-hazardous waste manifests and bills of lading (BOL). The same mock EPA ID number must be used on DLA Disposition Services Form 2505, Manifest Tracking Log.

c. The Contractor shall perform all dry weight computations for those hazardous wastes destined for land disposal in Texas and shall provide all such computations to the COR for recordkeeping purposes.

This computation shall be furnished along with the copy of the Generator manifest.

TOOELE SOUTH ONLY:

d. Prior to removal from either of these sites, completed copies of all manifests, or bills of lading, whichever is applicable, shall be furnished to the DLA Disposition Services Site coordinating the waste disposal. Each pickup manifest and bill(s) of lading (i.e., with a Government activity identified as a Generator), as well as all other documentation required herein, shall be clearly and distinctly marked with the name of the servicing DLA Disposition Services Site in addition to the Generators, the contract and task order numbers, as applicable, and the container identification number. The Contractor must comply with all Utah DSHW R315 regulations in regards to manifesting waste. The Contractor will provide three (3) copies of each completed manifest and associated paperwork, i.e., LDRs, and the generator’s copy of the original manifest to Tooele South Waste Management Division prior to leaving the site. The Contractor shall also provide three (3) copies of each manifest and associated paperwork to the COR prior to leaving the site. The Contractor shall obtain the Generator’s “mail to” address prior to the start of this contract which shall be used on all shipping papers. At the facility, the Contractor will provide a staging sheet identifying the containers to be shipped with the original paperwork when it is turned in for review. The staging sheet shall be completed for each day that the Contractor ships. The staging sheet may be submitted electronically to the Waste Management Division and the COR. Tooele South’s waste tracking numbers shall be entered on each manifest/shipping paper or as an attachment. The waste tracking numbers must be separated on the shipping paper according to the respective shipping paper line number.

e. All manifests shall be faxed back to the Generator and Tooele South’s Waste Management Division within 48 hours after receipt and signature by the TSDF. Also, the Generator’s copy of all manifests, signed by the designated TSDF, shall be mailed directly to the Generator at the “mail to” address. A copy of each manifest, signed by the designated TSDF, shall be furnished to the DLA Disposition Services Site whose address appears on the manifest(s). Mailed manifests shall be submitted in such a manner as to comply with timeliness prescribed by state and EPA regulations. (See 1.3.1).

PAGE 10 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

1.1.3 NOTIFICATIONS

a. Except as may otherwise be specified herein, the Contractor shall notify the COR for each location, at least five (5) business days BEFORE attempting site visits, analyses, or pickups.

(1) In addition to the notification above for pickups, the Contractor shall provide the name of the driver, the driver’s Commercial Driver License (CDL) number and its expiration date, to the COR or other Government representative at least 24 hours prior to removal. The Contractor may also opt to provide a list of approved, multiple drivers designated for pickups under this specific contract to the COR or other Government representative prior to any attempted removals. If this option is elected and the list is approved by the Government and maintained by the Contractor, the 24-hour notification requirement is mute for the remainder of the contract unless otherwise modified.

(2) If a driver, other than the one specified 24 hours in advance for the specific TO; or, one whose name does not appear on the optional list of approved, multiple drivers arrive for pickup, the COR or other designated Government representative will verify the personnel switch with the Contractor before the pickup commences. This may require a written notice or fax from the Contractor.

NOTE: Rapid Gate may be mandatory for access to some DOD facilities, see 1.1.7. Where Rapid Gate is deployed, the 24-hour advance notification in Paragraph 1.1.3 is not required. At some Military Installations the Contractor and/or Sub-Contractors may be required to be escorted to and from the place of duty. This requirement is both, for safety and physical security purposes. Contractors and/or it agents are required to remain on/at the designated work area.

1.1.4 TRAILER SECURITY, PADLOCKS

a. All Contractor trailers and tankers capable of being padlocked must be padlocked upon arrival at the pickup location. Failure to meet this requirement could result in the Government’s halting of the pickup. All trailers and tankers capable of being padlocked must also be padlocked again prior to departure of the pickup location(s). The driver shall provide the padlock and lock the trailer or tanker without assistance from the COR or other Government representative.

b. The COR or other Government representative has the right to request any identification and/or occupational endorsements from the driver beyond what is identified in additional specific sections in this contract and refuse commencement and/or completion of pickups if any unusual or suspicious actions occur. Any potential demurrage associated with the driver verification process and/or the unexpected halt or commencement of pickups will not be grounds for reimbursement by the Government.

1.1.5 HOURS OF OPERATION

The Contractor agrees that, for those portions of the services provided on a Government installation, the services will be provided during normal hours of operations for the installation. The normal hours of operations for installations on this contract are available upon request from the COR.

Work may not begin prior to 8:30AM on Thursdays at Tooele South and Deseret Chemical Depot.

1.1.6 PUBLIC AFFAIRS COORDINATION

PAGE 11 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

The Contractor shall refer all inquiries concerning this contract to the Contracting Officer (CO). Under no circumstances shall any statement be released to the news media directly by the Contractor or any agents of the Contractor.

1.1.7 RAPID GATE SECURITY

All Navy and Marine Corps installations require Navy Commercial Access Control System (NCAC) badges to gain access. Rapid Gate requires a security background check for Contractors and Contractor employees and once approved, the individual has access to that installation for the length of the contract.

Contractors and Contractor personnel must be enrolled in NCAC in order to access installations. There is a “per person/per location” fee. It takes approximately one month for initial company background investigations to be completed and enrollments to be processed. Any Rapid Gate Security fees shall be included in the pricing for this contract. Costs of enrolling in the program are outlined below, and are subject to change without notice.

a. Company Enrollment for one year is $199 for a single installation (base) OR $249 for two or more installations.

b. Employee Enrollment for one year is $159 for a single installation OR $199 for two or more installations.

c. There is a 90-day subscription option for $59. This is for one employee for a single installation.

Each additional installation is an additional $59.

d. Additional information can be found at: http://www.rapidgate.com/index.php.

e. At those locations where the Subcontractor is not registered on “Rapid Gate”, the primary Contractor must provide constant surveillance for the Subcontractor at the work site until such time that the Subcontractors depart the Military Installation. The Contractor shall monitor the Subontractor for contractual compliance, for safety, and environmental concerns.

1.1.8 ENVIRONMENTAL MANAGEMENT SYSTEM

DLA Disposition Services implemented EMS in accordance with ISO 14001:2004(E), DOD and DLA requirements at all DLA Disposition Services appropriate facilities. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy of an organization. The DLA Disposition Services EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities and authorities while supporting the DLA Disposition Services mission. The DLA Disposition Services EMS program is explained in agency Environmental Management System (EMS) Core Instruction. Site supplements may detail information required by EMS at a local level such as local, state and host environmental regulations as well as local emergency procedures and operating procedures unique to the location. Site supplements also contain information concerning the local interaction between the DLA Disposition Services tenant appropriate facility and the DOD/DLA host facility EMS program. Contractors and their personnel are required to be aware that each DLA Disposition Services appropriate facility has an EMS and to be aware of EMS policies to perform work and/or gain access to an installation. Each DLA Disposition Services appropriate facility maintains

PAGE 12 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

http://www.rapidgate.com/index.php

EMS awareness posters that identify the DLA Disposition Services Environmental Management Representative (EMR) and Host facility EMR for specific guidance concerning an individual facilities’ EMS program. Contractors may request current copies of EMS information identified in this paragraph by contacting the local Contracting Officer's Representative (COR).

1.2 REMOVAL

1.2.1 SPILL RESPONSIBILITY

a. The Contractor is solely responsible for cleanup and proper disposal of any and all spills or leaks during the performance of this contract that occur as a result of, or are attributed to, the actions of its agents, employees, or Subcontractors to the satisfaction of the Government and at no cost to the Government.

b. The Contractor shall report all such spills or leaks, regardless of their quantity, to the COR (if not already present) and the CO immediately upon discovery. The Contractor shall adhere to all Host or Installation spill reporting and clean-up requirements. A written follow-up report shall be submitted to the CO not later than 24 hours after the initial telephonic report. The written report shall be in narrative form and as a minimum include the following:

(1) Description of material spilled (including identity, quantity, manifest number, etc.).

(2) Whether quantity spilled is EPA/state reportable, and if so, whether it was reported.

(3) Exact time and location of spill, including a description of the area involved.

(4) Containment procedures initiated.

(5) Summary of any communications Contractor has with anyone other than the CO.

(6) Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue.

1.2.2 SEGREGATION OF HAZARDOUS WASTE

All items collected on this contract must be segregated according to the current EPA Hazardous Waste Compatibility Chart, and kept physically separate from any containers not associated with this contract until the initial TSDF is reached. The items must be so marked, that they are readily linked to this contract throughout this period.

1.2.3 STATEMENT ON CONTAINERS

The Generator is responsible for ensuring their containers are DOT shippable, i.e., IAW current DOT regulations and standard TSDF acceptance. The Contractor is responsible for all repackaging costs associated with special container acceptance criteria at the TSDF.

1.2.4 GOVERNMENT EQUIPMENT & PERSONNEL

The Government shall not furnish any equipment or personnel to assist in the performance of this contract. Any such offers of assistance are unauthorized, and the Contractor shall not accept any such offers. The only exception is the use of Government-owned loading equipment (Section 1.2.6), and Government-owned scales (Section 1.2.7), and where applicable, management services.

1.2.5 TREATMENT OF HAZARDOUS WASTE ON GOVERNMENT FACILITIES

a. Treatment of hazardous waste (including solidification) on Government facilities is not permitted.

Treatment is defined as any process which meets the definition of treatment as identified in 40 CFR

260.10 and/or the facility Permit.

PAGE 13 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

b. The Contractor shall not drain and/or flush PCB items at Government facilities. Draining will be allowed only to prevent leaking and to meet DOT regulations.

c. Treatment, disposal, or release of gases, other than inert gases, to the atmosphere on Government premises is not permitted by this contract. The Contractor may perform gas extraction for other than inert gas cylinders at the pickup location using a self-contained apparatus. This apparatus shall emit no gas into the atmosphere, and purge the entire cylinder contents into a closed receiver for transport to a recycling or disposal site.

1.2.6 LOADING

The Contractor is responsible for loading, including furnishing all the equipment necessary for loading.

The Government will not load at any location on any day in which the facility is closed unless otherwise specified. Where it is provided that the Government will load, the Government will make the initial placement of the item on conveyance(s) furnished by the Contractor and the initial placement on the Contractor's conveyance shall be as determined by the Government. Unless otherwise provided in this contract, the Government will not block, chock, brace, lash, band, or in any other manner, secure the cargo on such conveyance(s) furnished by the Contractor.

The Government may tailgate load at the following locations:

Location Item(s) Dugway Drums and bulk solids Mountain Home Drums

-Tooele South personnel will tailgate load at Building S2. The Contractor is not required to furnish a forklift at Building S2

-Any waste or material brought onto any installation from any other location SHALL NOT be removed from the Contractor’s vehicle(s) at any time during the performance of this contract.

-Storage containers ordered by Tooele South using CLIN 6374 will be dropped at the installation’s 90-

Day Storage Yard by the Contactor. These containers will be loaded by Government personnel on-site and returned to the 90-Day Storage Yard for pickup by the Contractor. The Contractor will be required to block, chock, brace, lash, band, or otherwise secure the storage container on any Contractor provided conveyance(s). The Contractor is responsible for loading all items listed in the bid schedule. This includes furnishing all the equipment necessary for loading.

1.2.7 WEIGHING OF ITEMS

Government scales will be used when available, operable, and authorized by the Government. The Contractor shall be responsible for determining the availability of Government scales. All scales used for purposes of this contract shall be calibrated IAW applicable regulations. The Government shall ensure that Government scales are operable and accurate through certification or demonstration. The Contractor shall ensure that non-Government scales are operable and accurate through certification or demonstration.

At the Government's option, the use of Government scales will be allowed at the following sites:

PAGE 14 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

SITE EQUIPMENT AVAILABLE

Dugway Landfill Truck Scale w/100,000 lbs capacity Dugway CHWSF Warehouse Floor Scale w/2,500 lbs capacity Mountain Home Bldg. 1296 Platform w/5,000 lbs capacity Tooele Army Depot, Bldg. 525 Truck Scale w/60,000 lb capacity Hill AFB, Bldg. 514 Floor Scale w/2,000 lb capacity Hill AFB, Bldg. 888 Floor Scale w/2,000 lb capacity Hill AFB, Bldg. 890 Truck Scale w/100,000 lb capacity Hill AFB, Bldg. 849 Truck Scale w/100,000 lb capacity Tooele South Truck Scale w/80,000 lb capacity Deseret Chemical Depot Platform w/estimated 5,000 lb capacity

Before loading, the Contractor is required to weigh the waste hauling vehicle, trailer, and/or rolloff/vacuum box, as applicable, to establish the empty (tare) weight of the rolloff box, dump truck, tanker truck, etc. This weight will be documented on a certified weight ticket and provided to the COR.

After loading, the Contractor is required to weigh the waste hauling vehicle, trailer, and/or rolloff/vacuum box, as applicable, to establish the loaded (gross) weight of the conveyance. This weight will be documented on a certified weight ticket and provided to the COR. The actual (net) weight of the waste shall then be calculated by subtracting the tare weight from the gross weight. When onsite Government scales are available, weights must be agreed upon by both the Contractor and the Government before removal. When offsite commercial scales must be used, a certified weight ticket will be provided to the COR and shall be the basis for payment to the Contractor.

1.2.7.1 TASK ORDER ADJUSTMENTS

All task order weights are estimated amounts. The contractor can expect that the task order weights will be required to be adjusted upward or downward as removals take place and the actual pounds being removed are measured. Therefore, the Government has the unilateral right to increase the task order weight in those instances where the Government has underestimated the amount of weight that is required to be removed so the contractor can continue performance. The Government has the unilateral right to decrease the task order weight in those instances where the Government has overestimated the amount of weight that is required to be removed. In instances of decreasing weight, these decreases are not subject to FAR 52.212-4, termination for convenience coverage. In addition, it is agreed that it is acceptable for the Government to issue task order modification (i.e. quantity changes, noun descriptions, HIN changes, adding/deleting lines, extending task order end dates, etc.) unilaterally. The contractor will be paid for the actual items and quantities removed per the awarded contract price schedule. If upon receipt of a unilateral task order modification, the contractor does not agree with the change or changes, the contractor reserves the right to seek resolution with the Contracting Officer. These modifications are only against task orders. No changes are made to the terms and conditions of the contract.

1.2.8 DEFINITIONS, BULK & CONTAINERIZED WASTE

1.2.8.1 BULK WASTE

a. The term bulk waste refers to waste that is typically removed via rolloff boxes, vacuum or sludge boxes, dump trucks, tank trucks, vacuum trucks, pump trucks, and trucks with vacuum-loaded or pump-loaded tanker trailers. Pumpable liquid wastes that are removed via totes, also known as portable tanks and Intermediate Bulk Containers (IBC), are considered bulk waste and have a surcharge associated with them (see Tote surcharge CLIN 6386TS, if applicable). Bulk waste does not refer to containerized

PAGE 15 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

wastes including waste contained in drums, cubic yard boxes, military tri-wall boxes, cubic yard bags or “super sacks”, lamp boxes, cylinders, or palletized waste.

b. Bulk debris (as defined in 40 CFR 268.2(g)) and other solids weighing less than 600 Lbs/yd3 shall have the CLIN suffix “B6”, and shall be priced per cubic yard (CD). Bulk debris (as defined in 40 CFR 268.2(g)) and other solids weighing 600 Lbs/yd3 or greater, shall have the CLIN suffix B1, B2, B3, or B4, and shall be priced per pound (LB). Base CLIN TX06 is uniquely designed with the treatment technology of Microencapsulation (of hazardous debris) in mind. Base CLIN TX07 is uniquely designed with the treatment technology of Macro-encapsulation in mind. When ordering Base CLIN TX06 in conjunction with Bulk CLIN Suffixes B1, B2, B3, B4, or B6, the Generator will ensure that the wastestream does not contain pipes, hoses, tubes, equipment, or rigid objects greater than 10 feet in any dimension, where toxic metal surfaces cannot be easily coated with a micro-encapsulation coating material. In such cases where these types of articles are present in bulk loads, Base CLIN TX07 should be considered (maximum size is 18’L x 4.5’W x 4.5’H). Furthermore, intact containers (Per 40 CFR 268.2(g)) do not meet the definition of debris and shall not be turned in under Base CLINs TX06 or TX07. Intact containers are those containers “that are not ruptured and that retain at least 75% of their original volume.” When intact containers are present, the Generator should consider using “Lab Pack/Loose Pack” CLINs.

When ordering a B6 CLIN suffix, the Government shall be required to order disposal of the waste based on a minimum of 75% of the volumetric capacity of the associated rolloff. For example, if a 20 cubic yard rolloff contains 12 cubic yards of debris (B6), the Generator shall pay for disposal of 15 cubic yards, or 75% of the rolloff’s volume.

NOTE: All rolloff boxes used on this contract will have empty (tare) weights stenciled/painted on the outside of the container, visible and unobstructed by secured tarps.

c. The terms solid and solids used in this document and the Bid Schedule refers to solid material which is largely free of free liquids, e.g., soil, silt, sand, gravel, filtercake, powder, granules, crystals, fines, and artifacts that do not meet the definition of debris as defined in 40 CFR 268.2(g).

d. The terms liquid and liquids used in this document and the Bid Schedule refers to liquid material which is pumpable by conventional pumping devices designed to pump low-viscosity liquids and largely free of suspended or settled (vs. dissolved) solids. A liquid that has become frozen due to ambient freezing temperatures, but would otherwise be of liquid state at 72°F, will still meet the definition of liquid for purposes of this contract.

e. The terms sludge and sludges used in this document and the Bid Schedule refers to material that is either (a) a multiphasic material with some combination of a liquid phase and a solid phase as defined above, (b) a slurry or mud-like material, such as liquid-saturated soil or tank bottoms, whereby solids are largely or completely suspended in liquid and typically flows under gravity, and may or may not be conveyable by high capacity pumping or vacuuming devices designed to move heavy material, or (c) a highly viscous liquid not pumpable by conventional pumping devices designed to pump low-viscosity liquids.

f. The term debris used in this document and the Bid Schedule refers to (a) solid artifacts, fragments, or rubbles which are present, but not primarily present, and are intermingled or suspended in an otherwise fully solid, liquid, or sludge wastestream as described above, or (b) a wastestream which meets the definition of debris in 40 CFR 268.2(g). Note: Definition (a) in this section would meet the

PAGE 16 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

“Mixed” or “Various” Physical State designation indicated in the Bid Schedule for this contract, as CLINs with a “Mixed” or “Various” physical state refers to solids, liquids, sludges, debris, or any combination thereof. Definition (b) in this section meets the “Debris” Physical State designation indicated in the Bid Schedule for this contract.

g. The term Heavy Solids used in this document and the Bid Schedule refers to bulk waste solids, sludges, and heavy debris (as defined in 40 CFR 268.2(g)), with a density greater than 600 Lbs/yd3 shall be ordered using the bulk CLIN Suffix (B1, B2, B3, or B4). The CLIN Suffix is assigned based on the net weight of each heavy solids bulk load. If a bulk load with a net weight of less than 10,000 Lbs is ordered, the bulk CLIN Suffix “B1” will be used. Loads weighing 10,000 to 20,000 Lbs will be assigned the bulk CLIN Suffix “B2”. Loads weighing 20,000 to 30,000 Lbs will be assigned the bulk CLIN Suffix “B3”. Loads weighing more than 30,000 Lbs will be assigned the bulk CLIN Suffix “B4”.

Weights shall be determined using certified Government scales when available, or certified commercial scales when Government scales are not available. Prior to removal, and when possible, the net weight of the waste shall be determined and agreed upon by both the Government representative and the Contractor.

h. The term Lightweight Solids used in this document and the Bid Schedule refers to bulk waste solids and debris (as defined in 40 CFR 268.2(g)) with a density of less than or equal to 600 Lbs/Yd3.

These wastestreams are considered lightweight and shall be ordered using the Cubic Yard CLIN Suffix “B6”. Cubic yards (yd3) are calculated by visual estimation. For example, if a 20-yd3 rolloff box appears 90% full, the removal will be estimated and ordered at 18 CD. Note, any CLIN with a “B6” suffix will be ordered using “CD” to denote cubic yards.

Prior to removal, the volume shall be determined and agreed upon by both the Government representative and the Contractor.

i. Bulk waste liquids will be pumpable by conventional pumps typically used on tank trucks and trailers, even if loaded by vacuum truck or trailer, and shall be ordered using the CLIN Suffix B5, indicating gallons (GL).

j. Gallons are calculated by using density or tank strapping and are rounded to the nearest whole gallon using conventional (non-scientific) rounding rules. This rule requires that if the digit to the right of the decimal place is 0, 1, 2, 3, or 4, leave the whole number alone; if the digit to the right of the decimal place is 5, 6, 7, 8, or 9, add 1 to the whole number. Example: when the density calculation is used and where the bulk liquid is water (Density = 8.33 Lbs/Gal): 36,290 Lbs/8.33 Lbs/Gal = 4,356.54 gallons. This will be rounded to 4,357 gallons. However, 36,280 Lbs (4,355.34 gallons) would be rounded to 4,355 gallons. Density will be obtained from the waste profile sheet.

k. Tank strapping may be used to calculate the volume of liquid in a tank or tanker given a strapping rod depth measurement. The graduated rod is inserted vertically through the top surface of the liquid to the bottom of the tank and a measurement is taken to determine the depth of the liquid. The depth, usually measured in inches, is compared to a table, or spreadsheet, which shows the conversion to gallons. Only tables specifically calibrated to the tank or tanker being strapped may be used. These measurements will be made by the Contractor.

l. The Generator reserves the right to choose which method will be used to determine total gallons of waste offered. The net volume (gallons) of the waste shall be determined and agreed upon by both the Government and the Contractor prior to removal, when possible.

PAGE 17 OF 81 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

m. Liquids in Totes/IBC Containers. When totes/IBCs are removed by the Contractor, the CLIN used for this waste will include the bulk liquid CLIN Suffix of B5. The Generator shall pay the Contractor based upon the full volumetric capacity of the container in gallons, plus a tote surcharge per tote (see Tote surcharge CLIN 6386TS). IBC totes come in various sizes, the most common size being 275- and 330-gallon capacity. Totes/IBCs are transported as containerized waste. When totes/IBCs are pumped/bulked onsite, and the waste is removed via tanker trailer or vacuum truck, the Generator shall pay the Contractor based upon the actual volume removed in gallons (GL).

n. When using the suffix “ME” with CLINs RE10, RE11 and RE12, the “ME” refers to up to 55-gal containers pumped/vacuumed/stung onsite and includes recycling and service. The Generator will guarantee a minimum of 30 containers when ordered. The Contractor may be permitted to, at the discretion of the Government be allowed to “top-off” their Vacuum Truck by stinging containers of the same CLIN at no additional cost to the Government. This only applies when servicing a bulk liquid task order of the same base CLIN.

1.2.8.2 CONTAINERIZED WASTE

a. The term containerized waste refers to waste that is typically transported by a box truck or semi-truck and trailer or van, including waste contained in drums, cubic yard boxes, military tri-wall boxes, cubic yard bags or super sacks, lamp boxes, cylinders, or palletized waste.

b. Containers shall be counted, weighed, and documented against the TO by the Contractor prior to removal. Although most containerized CLINs are priced by the container size (CLIN Suffixes C1 through C6), weights must still be documented for other purposes such as manifesting and Generator reporting. The Contractor shall provide portable scales, which may be mounted to the truck or trailer, for weighing of items, and must first demonstrate reasonable weight accuracy to the Government representative. The use of commercial scales is not authorized for containerized items. Only materials being removed by the Contractor will be weighed, including the containers, pallets, and dunnage.

c. Drums larger than 55 gallons (e.g., 95-gal) are to be used only for overpacking smaller drums when the smaller drum(s) are leaking or have the potential to leak.