Attachment B - Water Sampling Tests ON-CALL 2026.pdf
PDF 116 KB Posted
- Attached to
- Water Testing Services
- Solicitation number
- SP330026Q0269
- Issued by
-
Defense Logistics Agency Distribution
About this file
Laboratory Field Sampling, Testing, and Analysis Schedule
This document is a Laboratory Field Sampling, Testing, and Analysis Schedule for water sampling, testing, and analysis services at DLA Distribution San Joaquin, California. The schedule outlines on-call services conducted throughout all performance periods for five primary monitoring programs with specific testing protocols, methods, and collection locations.
The Water Supply Well Resampling Program requires total and fecal coliform testing using SM 9221 B,C,E methodology on grab samples from government water wells. Upon detection of positive results, resampling must occur within 24 hours, consisting of five samples taken at intervals of immediate, 30 seconds, 1 minute, 5 minutes, and between 15-30 minutes, with repeat sample sets required until two consecutive sets show no coliform detection. The Distribution System Resampling Program tests for total coliform organisms at government-designated locations using the same methodology, with repeat sampling consisting of three samples collected from the positive location and upstream and downstream service connections. The Disinfection Verification Program requires total coliform testing with sample pickup within 4 business hours, with results reported via email to the Environmental Protection Office. The Sludge Monitoring Program, collected by the contractor from sludge bins at the wastewater plant, includes testing for acid/base-neutral organics and 18 metals using EPA methods 8270C and 6010B, with constituents measured in mg/L or mg/kg and moisture content in percent. The Storm Water Monitoring Program requires 27 constituents tested at the storm water collection system inlet and discharge pumping station, including metals, organics, physical parameters, and petroleum hydrocarbons, with initial sampling at the beginning of the first significant storm event (greater than 0.5 inches precipitation) and subsequent sampling as determined by the Contracting Officer Representative (COR). All sampling processes must comply with Title 22, Chapter 15, Article 3 of California Code of Regulations, with the contractor providing labeled containers and notifying the COR within 24 hours of any positive coliform detections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A - Water Sampling Tests 2026.pdf | ||
| CSS SP330026Q0269.pdf | ||
| Attachment 3- Wage Determination.pdf | ||
| Attachment 2 - Statement of Work.pdf | ||
| Attachment 1 - Schedule of Services.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Laboratory Field Sampling, Testing, and Analysis Schedule
Water Sampling, Testing and Analysis - DDJC
No. Constituents Method Units Sample Type Sample Collection Location
1 Total/Fecal Coliform SM 9221 B,C,E MPN/100ml Grab Govt Water well with positive result
No. Constituents Method Units Sample Type Sample Collection Location
1 Total/Fecal Coliform SM 9221 B,C,E MPN/100ml Grab Govt Re-sampling depends on location of positive result, see current "Bacterial
Sample Site Plan"
No. Constituents Method Units Sample Type Sample Collection Location
1 Total Coliform Organisms SM 9221 B,C,E MPN/100mL Grab Govt Various, determined by the COR
No. Constituents Method Units Sample Type Sample Collection Location
1 Acid/Base-Neutral Organics EPA 8270C mg/L Grab Contractor Sludge bin located by the WW plant
2 Antimony (Sb) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
3 Arsenic (As) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
4 Barium (Ba) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
5 Beryllium (Be) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
6 Cadmium (Cd) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
7 Cobalt (Co) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
8 Copper (Cu) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
9 Lead (Pb) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
10 Moisture Content EPA 160.3 percent Grab Contractor Sludge bin located by the WW plant
11 Molybdenum (Mo) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
12 Nickel (Ni) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
13 Silver (Ag) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
14 Thallium (Tl) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
15 Tin (Sn) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
16 Titanium (Ti) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
17 Chromium (Total Cr) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
18 Vanadium (V) EPA 6010B mg/kg Grab Contractor Sludge bin located by the WW plant
19 Zinc (Zn) EPA 6010B mg/L Grab Contractor Sludge bin located by the WW plant
No. Constituents Method Units Sample Type Sample Collection Location
1 Aluminum (Al) (pH 6.5-9) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
2 Antimony (Sb) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
3 Arsenic (As) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
Sampling, Testing, and Analysis (STA) Schedule: ON-CALL
DLA DISTRIBUTION SAN JOAQUIN CA
WATER SUPPLY WELL RESAMPLING PROGRAM
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.12.1 Samples Collection – System Resampling Program: Wells. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor shall notify COR within 24 hours of a total coliform positive, potable water sample. 6. Contractor will be notified by the COR of any resampling requirement. 7. Resamples must be taken within 24 hours of notification. 8. Well resampling shall consist of five samples taken at the following intervals:
immediate, 30 seconds, 1 minute, 5 minutes, between 15 and 30 minutes. 9. Contractor shall notify COR within 24 hours when one or more samples in repeat sample set is coliform positive, and take an additional set of repeat samples within the same 24 hours. 10. Repeat process until no coliform is detected in two (2) consecutive sample sets. 11. Sampling process shall be compliant IAW Title 22, Chapter 15, Article 3 of California Code of Regulations.
DISTRIBUTION SYSTEM RESAMPLING PROGRAM
STORM WATER MONITORING
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.12.2 Samples Collection – System Resampling Program: Distribution System. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor shall notify COR within 24 hours of a potable water sample being detected as total coliform positive, and collect a repeat sample set within the same 24 hours. 6. A repeat sample set consists of three (3) samples: one from the same location as positive sample, one collected within 5 service connections upstream from positive sample, and one collected within 5 service connections downstream. 7. The COR shall designate sampling locations. 8.
Contractor shall notify COR within 24 hours when one or more samples in repeat sample set is coliform positive, and take an additional set of repeat samples within the same 24 hours. 9. Repeat process until no coliform is detected in two (2) consecutive sample sets. 10. Sampling process shall be compliant IAW Title 22, Chapter 15, Article 3 of California Code of Regulations.
DISINFECTION VERIFICATION PROGRAM
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.13 Samples Collection – Disinfection Verification Program 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor will be notified by the COR of any sampling requirement. 6. Samples must be picked-up within 4 business hours during regular business hours Monday - Friday (no holidays) following notification. 7. The Environmental Protection Office shall be notified of the test results via email as soon as results are available.
SLUDGE MONITORING
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.13 Samples Collection - Sludge Monitoring Program. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. The Contractor shall collect and analyze sludge samples as determined and requested by the COR.
Laboratory Field Sampling, Testing, and Analysis Schedule
Water Sampling, Testing and Analysis - DDJC
4 Barium (Ba) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
5 Beryllium (Be) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
6 Cadmium (Cd) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
7 Chemical Oxygen Demand (COD) EPA 410 mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
8 Cobalt (Co) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
9 Copper (Cu) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
10 Dieldrin (DL = 0.05 µg/L): DDT, DDD, DDE (DL = 0.1 µg/L)
EPA 608.3 µg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
11 Iron (Fe) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
12 Lead (Pb) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
13 Molybdenum (Mo) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
14 Nickel (Ni) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
15 Oil and Grease EPA 1664B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
16 pH SM 4500-H + B number Grab Govt Storm water collection system inlet
/discharge pumping station.
17 Volatile Organic Compounds (VOCs) EPA 624.1 µg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
18 Silver (Ag) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
19 Specific Conductance SM 2510 B umhos/cm Grab Govt Storm water collection system inlet
/discharge pumping station.
20 Thallium (Tl) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
21 Chromium (Total Cr) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
22 Carbon (Total Organic C) EPA 5310C mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
23 TRPH EPA 1664-SGT mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
24 TEPH EPA 8015 mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
25 Total Suspended Solids SM 2540 D mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
26 Vanadium (V) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
27 Zinc (Zn) EPA 6010B mg/L Grab Govt Storm water collection system inlet
/discharge pumping station.
Notes: ON-CALL - 1. Sampling shall be conducted all performance periods. See SOW Section 3.6 Work - Schedule: Period or Unscheduled (On-Call) Services
2. See SOW Section 3.7.14 Samples Collection - Storm Water Monitoring Program. 3. Contractor shall provide labeled containers. 4. Label shall indicate sampling location and constituents. 5. Contractor shall provide labeled sample containers. 6. Label shall indicate sampling location and constituents. 7. Contractor will be notified by the COR of any sampling requirement. 8. Samples must be picked-up within 4 business hours during regular business hours Monday - Friday (no holidays) following notification. 9. A sampling station shall be established at the storm water collection system inlet. 10. Samples shall be collected at the beginning of the first significant storm (greater than 1/2 inch precipitation) of the rainy season. 11. Subsequent sampling will be taken from the storm water discharge pumping station as determined and requested by the COR.
File details come from the government source that posted it. Updated .