Ice Machine Installation SOW.pdf

PDF 80 KB Posted

Attached to
DDAG Ice Machine Install Federal contract opportunity
Solicitation number
SP330025Q0135
Issued by
Defense Logistics Agency Distribution

About this file

This document is a Statement of Work (SOW) for ice machine and water dispenser installation for the Defense Logistics Agency Distribution. The SOW requires installation of a Follett Products, LLC Model No. 110FB425A-S Symphony Plus Ice & Water Dispenser (or equivalent) across multiple buildings and bays. The installation scope includes: 1) disconnecting existing ice/water dispensers and setting them aside for DLA removal, 2) uncrating and setting new units in place, connecting water lines, installing new water filters, connecting PVC drain lines, and plugging into electrical outlets, and 3) startup and testing to ensure proper operation. The asset list details 10 existing ice machines from various manufacturers (Scotsman, Ice-O-Matic, Manitowoc, Prodigy, AGION, Cornellus) located in buildings 1221, 1230, 1220, 1240, 1331, and 1322, with specific bay and model number information provided.

View the file

Other files for this federal contract opportunity

Other files attached to DDAG Ice Machine Install, newest first.
File Type Posted
Ice Machine Installation SOW.pdf PDF
CSS SP3300-25-Q-0135 Service Amendment 002.pdf PDF
CSS SP3300-25-Q-0135 Service Amendment 001.pdf PDF
CSS SP3300-25-Q-0135 Service.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ICE MACHINE & DISPENSER, NUGGET STYLE INSTALLATION

Follett Products, LLC Model No. 110FB425A‐S Symphony Plus Ice & Water Dispenser or equivalent

Installation to include all labor and materials to:

1. Disconnect exiting ice/water dispenser to be replaced and set aside for DLA to remove and dispose of.

Disconnection will include cutting/disconnecting PVC drainpipe, disconnect water line, and unplugging from electrical outlet.

2. Uncrate, set in place new unit. Connect to existing water line. Remove old water filer and install new water filter (Contractor Provided). Connect unit to PVC drain line using proper plumbing procedures for installing new PVC drainpipe. Plug unit into outlet. (See Asset List Below)

3. Start up and test. Ensure units are operating properly.

ASSET LIST AND LOCATIONS

ICE MACHINES

Bldg. # Bay Make Model # 1221 Bay 3 Scotsman B530P 1221 Bay 5 Ice-O-Matic ICE0250HA6 1221 Bay 1 Manitowoc RNS0385A 1230 Bay 3 Prodigy B530P 1220 Bay 1 AGION ICEV220HA2 1240 BAY 3 Cornellus VAC330 1331 Bay 3 Prodigy B530P 1331 Bay 3 Breakroom Scotsman B530P 1331 Bay 5 Scotsman B530P 1322 RAMP Office Manitowoc B570

File details come from the government source that posted it. Updated .