SP330023B0002 Amendment 0001.pdf
PDF 919 KB Posted
- Attached to
- BLDG 81 ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- SP330023B0002
- Issued by
- Defense Logistics Agency Distribution
About this file
This amendment modifies solicitation SP330023B0002 for roof replacement at Building 81. The Defense Logistics Agency Distribution is seeking to replace the roof at its facility in New Cumberland, Pennsylvania. The amendment revises the specifications section on ethylene-propylene-diene-monomer roofing and updates the submittal register to include additional submittal requirements. Bidders must provide an EPDM single-ply membrane roofing system that meets wind resistance and fire rating standards. The contractor will be responsible for submittals on roof plans, manufacturer qualifications, product data sheets, installation instructions, warranties, and training of government personnel upon project completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID ABSTRACT-SP330023B0002 8-2-2023.pdf | ||
| SP330023B0002 - A0002 7-25-2023.pdf | ||
| BLDG 81 ROOF ATTENDEE ROSTER.pdf | ||
| ATTACHMENT 5 - - 1818 Pre-enrollment sample.pdf | ||
| ATTACHMENT 4 - CONSTRUCTION WAGE DETERMINATION.pdf | ||
| ATTACHMENT 1 - Specs Combined RTA 03232023.pdf | ||
| SP330023B0002 IFB ROOF-final.pdf | ||
| ATTACHMENT 8 - SF25-16e - PERFORMANCE - 2025.pdf | ||
| ATTACHMENT 9 - SF25A-16e - PAYMENT - 2025.pdf | ||
| ATTACHMENT 7 - SF24-16e - BID BOND - 2025.pdf | ||
| ATTACHMENT 6 - Pre-enrollment Photos.pdf | ||
| ATTACHMENT 3 - Submittal Register RTA 04032023.pdf | ||
| ATTACHMENT 2 - Dwgs Combined RTA 03272023.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
SP330023B0002
Replace Roof - Building 81
AMENDMENT 0001
DATED 7/13/2023
Amendment 0001 is hereby incorporated into SP330023B0002 to Replace Roof – Building 81, DLA Distribution Susquehanna and shall become part of any contract issued.
Amendment 0001 is being issued to provide revised Spec 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing (Attachment 1) and revised Submittal Register (Attachment 2).
END OF AMENDMENT 0001
Replace Roof Building 81 Specifications
SECTION 07 53 23
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
05/12, CHG 2: 08/18 - Revised 001
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
ASTM INTERNATIONAL (ASTM)
ASTM D4637/D4637M (2015) EPDM Sheet Used in Single-Ply Roof Membrane
ASTM D4811/D4811M (2016) Standard Specification for Nonvulcanized (Uncured) Rubber Sheet Used as Roof Flashing
ASTM D6369 (1999; R 2006) Design of Standard Flashing Details for EPDM Roof Membranes
ASTM E108 (2020a) Standard Test Methods for Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470 (2016) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA RoofMan (2020) The NRCA Roofing Manual
SINGLE PLY ROOFING INDUSTRY (SPRI)
ANSI/SPRI RD-1 (2014) Performance Standard for Retrofit Drains
UNDERWRITERS LABORATORIES (UL)
UL RMSD (2012) Roofing Materials and Systems Directory
SECTION 07 53 23 Page 1
AMENDMENT 0001 - DATED 7/13/2023
ATTACHMENT 1
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEM
Fully adhered EPDM roof membrane system applied over substrate.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Roof Plan Drawing
Wind Load Calculations
Boundaries of Enhanced Perimeter
Corner Attachments of Roof System Components
Location of Perimeter Half-Sheets
Spacing of Perimeter, Corner, and Infield Fasteners
Slopes and Drain Locations
SD-03 Product Data
Cement
EPDM Sheet ; G
Seam Tape
Bonding Adhesive
Lap Splice Adhesive
Water Cutoff Mastic/Water Block
Lap Cleaner, Lap Sealant, and Edge Treatment
Flashings
Flashing Accessories
Flashing Tape
Fasteners and Plates
Roof Insulation
Pre-Manufactured Accessories
Sample Warranty Certificate; G
Submit all data required together with requirements of this
SECTION 07 53 23 Page 2 section. Include a written acceptance by the roof membrane manufacturer of the insulation and other products and accessories to be provided. List products in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.
SD-07 Certificates
Qualification of Manufacturer
Certify that the manufacturer of the roof membrane meets requirements specified under paragraph entitled "Qualification of Manufacturer."
Qualification of Applicator
Certify that the applicator meets requirements specified under paragraph entitled "Qualification of Applicator."
Wind Uplift Resistance classification, as applicable; G
Fire Resistance classification; G
Submit the roof system assembly wind uplift and fire rating classification listings.
SD-08 Manufacturer's Instructions
Application ; G
Membrane Flashing ; G
Seam Tape
Tape Seams / Lap Splices
Perimeter Attachment
Primer
Fasteners
Pre-Manufactured Accessories
Cold Weather Installation; G
Include detailed application instructions and standard manufacturer drawings altered as required by these specifications.
Explicitly identify in writing, differences between manufacturer's printed instructions and the specified requirements.
SD-11 Closeout Submittals
Warranty
Information Card
Instructions To Government Personnel
SECTION 07 53 23 Page 3
Include copies of Safety Data Sheets (SDS) for maintenance/repair materials.
1.3.1 Shop Drawings
Roof plan drawing depicting wind load calculations and boundaries of enhanced perimeter and corner attachments of roof system components , location of perimeter half-sheets , spacing of perimeter, corner, and infield fasteners , as applicable. Include the project roof plan of each roof level and conditions indicated. Provide all slopes and drain locations .
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
EPDM sheet roofing membrane manufacturer must have at least 5 years experience in manufacturing EPDM roofing products.
1.4.2 Qualification of Applicator
Roofing system applicator must be approved, authorized, or licensed in writing by the roof membrane manufacturer and must have a minimum of three years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. The applicator must supply the names, locations and client contact information of 5 projects of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project within the previous three years.
1.4.3 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E108, FM 4470 , or UL 790 .
b. Be listed as part of Fire-Classified roof deck construction in the UL RMSD or Class I roof deck construction in the FM APP GUIDE.
FM or UL approved components of the roof covering assembly must bear the appropriate FM or UL label.
1.4.4 Wind Uplift Resistance
Provide a complete roof system assembly , including insulation and coverboard capable of withstanding the roof uplift pressures indicated on drawing G-001 validated by uplift resistance testing in accordance with Factory Mutual (FM) test procedures. Do not install non-rated system s.
Base wind uplift calculations on design wind speed indicated on drawing G-001 in accordance with ASCE 7-16 and other applicable building code requirements .
1.4.5 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings, specifications and submittals related to the roof work;
SECTION 07 53 23 Page 4
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representative;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control plan for the roof system installation;
f. Safety requirements.
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, mechanical and electrical work, other trades interfacing with the roof work, and representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.4.5.1 Existing Roofing Materials Removal
Provide a Roofing Removal Plan for review and approval by the Contracting Officer prior to start of work. Roofing Removal Plan must include, but not limited to the follwoing as a minimum: method for safe removal of existing roofing and other demolition; employee fall-safety prevention;
protection of occuppants and equipment during roof removal; and schedule showing activities and duration for each roof removal area.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in their original, unopened containers or wrappings with labels intact and legible. Where materials are covered by a referenced specification number, the labels must bear the specification number, type, class, and shelf life expiration date where applicable. Deliver materials in sufficient quantity to allow continuity of work.
1.5.2 Storage
Store and protect materials from damage and weather in accordance with manufacturer's printed instructions, except as specified otherwise. Keep materials clean and dry. Store and maintain adhesives, sealants, primers and other liquid materials above 60 degrees F . Utilize insulated hot boxes or other enclosed warming devices in cold weather. Mark and remove damaged materials from the site. Use pallets to support and canvas tarpaulins to completely cover material materials stored outdoors. Do not use polyethylene as a covering. Locate materials temporarily stored on the roof in approved areas, and distribute the load to stay within the live load limits of the roof construction. Remove unused materials from the roof at the end of each days work.
SECTION 07 53 23 Page 5
1.5.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment so as not to damage materials or applied roofing. Do not use materials contaminated by exposure or moisture. Remove contaminated materials from the site. When hazardous materials are involved, adhere to the special precautions of the manufacturer. Adhesives may contain petroleum distillates and may be extremely flammable; prevent personnel from breathing vapors, and do not use near sparks or open flame.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not install EPDM sheet roofing during high winds or inclement weather, or when there is ice, frost, moisture, or visible dampness on the substrate surface, or when condensation develops on surfaces during application. Unless recommended otherwise by the EPDM sheet manufacturer and approved by the Contracting Officer, do not install EPDM sheet when air temperature is below 40 degrees F or within 5 degrees F of the dewpoint. Follow manufacturer's printed instructions for installation during cold weather conditions.
1.7 SEQUENCING
Coordinate the work with other trades to ensure that components which are to be secured to or stripped into the roofing system are available and that permanent flashing and counterflashing are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials. Apply roofing immediately following application of insulation as a continuous operation. Coordinate roofing operations with insulation work so that all roof insulation applied each day is covered with roof membrane installation the same day.
1.8 WARRANTY
Provide roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to standard membrane manufacturer warranty as required to comply with the specified requirements. Provide a manufacturer's warranty that has no dollar limit, covers full system water-tightness and has a minimum duration of 20 years.
1.8.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 20 year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation, and accessories necessary for a watertight roof system construction. Write the warranty directly to the Government and commence at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, splits, tears, cracks, delaminates, separates at the seams, shrinks to the point of bridging or tenting membrane at transitions, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or
SECTION 07 53 23 Page 6 replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship is the responsibility of the roof membrane manufacturer. The roof membrane manufacturer is responsible for all costs associated with the repair or replacement work.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.
1.8.2 Roofing System Installer Warranty
The roof system installer must warrant for a period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
1.8.3 Continuance of Warranty
Approve repair or replacement work that becomes necessary within the warranty period and accomplish in a manner so as to restore the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
Provide the entire roofing and flashing system in accordance with specified and indicated requirements, including fire and wind resistance requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the NRCA RoofMan, membrane manufacturer published recommendations and details, ASTM D6369, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
1.10 ELIMINATION, PREVENTION OF FALL HAZARDS
1.10.1 Fall Protection
per OSHA and EM-385-1
PART 2 PRODUCTS
2.1 MATERIALS
Coordinate with other specification sections related to the roof work.
Furnish a combination of specified materials that comprise a roof system acceptable to the roof membrane manufacturer and meeting specified requirements. Protect materials provided from defects and make suitable for the service and climatic conditions of the installation.
2.1.1 EPDM Sheet
Ethylene Propylene Diene Terpolymer (EPDM), ASTM D4637/D4637M , Type I, SECTION 07 53 23 Page 7 non-reinforced, 0.090 inch nominal thickness for fully adhered application. Provide membrane with minimum thickness not less than minus 10 percent of the specified thickness value. EPDM membrane thickness specified is exclusive of backing material on the EPDM membrane.
Principal polymer used in manufacture of the membrane sheet must be greater than 95 percent EPDM. Width and length of sheet must be maximum width attainable as recommended by the manufacturer to minimize field formed seams in the field of the roof.
2.1.2 Energy Performance
Install a roof system that meets an overall performance as specified on the drawings or by insulation specified in other sections.
2.1.3 Seam Tape
Double-sided synthetic rubber tape, minimum 0.03 inch thick, minimum 3 inch wide. Utilize seam tape as recommended by the manufacturer's printed data for forming watertight bond of EPDM sheet materials to each other for the application specified and conditions encountered. 6 inch wide tape is required for seam seals along lines of mechanical attachment of membrane.
2.1.4 Lap Splice Adhesive
Low volatile organic compound (VOC) synthetic rubber adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer's printed data for forming watertight bond of EPDM sheet membrane materials to each other . Do not use splice adhesive to form membrane seams in field of roof or at standard base flashing conditions.
2.1.5 Bonding Adhesive
Low volatile organic compound (VOC) adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer's printed data for bonding EPDM membrane materials to insulation, wood, metal, concrete or other substrate materials. Do not use bonding adhesive to bond membrane materials to each other.
2.1.6 Lap Cleaner, Lap Sealant, and Edge Treatment
As supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.
2.1.7 Water Cutoff Mastic/Water Block
As supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.
2.1.8 Membrane Flashings and Flashing Accessories
Provide membrane flashing, including self-adhering membrane flashing, perimeter flashing, flashing around roof penetrations, and prefabricated pipe seals, that is minimum 0.045 inch cured EPDM, as recommended by the roof membrane manufacturer or minimum 0.055 inch thick uncured EPDM sheet in compliance with ASTM D4811/D4811M , Type I. Use cured EPDM membrane to the maximum extent recommended by the roof membrane manufacturer. Limit uncured flashing material to reinforcing inside and outside corners and angle changes in plane of membrane, and to flash scuppers, pourable sealer pockets, and other formed penetrations or unusually shaped conditions as
SECTION 07 53 23 Page 8 recommended by the roof membrane manufacturer where the use of cured material is impractical.
2.1.8.1 Flashing Tape
EPDM-backed synthetic rubber tape, minimum 6 inch wide as supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.
2.1.9 Membrane Fasteners and Plates
Coated, corrosion-resistant fasteners as recommended by the roof membrane manufacturer and meeting the requirements of FM 4470 and FM APP GUIDE for Class I roof deck construction and the wind uplift resistance specified.
As supplied and warranted for the substrate type(s) by EPDM sheet manufacturer and recommended by EPDM sheet manufacturer's printed data.
2.1.9.1 Stress Plates for Fasteners
Flat corrosion-resistant round stress plates as recommended by the roof membrane manufacturer's printed instructions and meeting the requirements of FM 4470 ; not less than 2 inch in diameter. Provide pre-formed discs to prevent dishing or cupping.
2.1.9.2 Auxiliary Fasteners
Corrosion resistant screws, nails, or anchors suitable for intended attachment purpose and as recommended by the roof membrane manufacturer.
2.1.9.3 Powder-Driven Fasteners
Powder-driven fasteners may be used only when approved in writing.
2.1.9.4 Metal Disks
Provide flat metal disks of minimum 1 inch in diameter, made of nonferrous material compatible with the nails or fasteners.
2.1.10 Pre-Manufactured Accessories
Pre-manufactured accessories must be manufacturer's standard for intended purpose, compatible with the membrane roof system and approved for use by the roof membrane manufacturer.
2.1.10.1 Pre-fabricated Curbs
Provide 16 gauge G90 galvanized curbs with minimum 4 inch flange for attachment to roof nailers. Provide minimum height of 10 inch above the finished roof membrane surface.
2.1.11 Rubber Walkboards
2.1.11.1 Rubber Walkboards
Preformed reprocessed rubber, compatible with the EPDM sheet, 1/4 inch minimum thickness, and weighing not less than 1-1/2 pounds per square foot .
SECTION 07 53 23 Page 9
2.1.12 Roof Insulation Below EPDM Sheet
Ensure insulation system and facer material is compatible with membrane application specified and as approved by the roof membrane manufacturer.
2.1.13 Wood Products
Do not allow fire retardant treated materials be in contact with EPDM membrane or EPDM accessory products, unless approved by the membrane manufacturer and the Contracting Officer.
2.2 FLASHING CEMENT
Provide a self-vulcanizing butyl compound flashing cement for splicing laps and for flashings workable at 20 degrees F . Obtain a recommendation for such flashing cement from the roofing membrane manufacturer.
PART 3 EXECUTION
3.1 EXAMINATION
Ensure that the following conditions exist prior to application of the roofing materials:
a. Do not install items that show visual evidence of biological growth.
b. curbs, control joints, expansion joints, perimeter walls, roof penetrating components, and equipment supports are in place.
c. Surfaces are rigid, clean, dry, smooth, and free from cracks, holes, and sharp changes in elevation.
d. The plane of the substrate does not vary more than 1/4 inch within an area 10 by 10 feet when checked with a 10 foot straight edge placed anywhere on the substrate.
e. Substrate is sloped to provide positive drainage.
f. Walls and vertical surfaces are constructed to receive counterflashing, and will permit mechanical fastening of the base flashing materials.
g. Treated wood nailers are in place on non-nailable surfaces, to permit nailing of base flashing at minimum height of 8 inch above finished roofing surface.
h. Pressure-preservative treated wood nailers are fastened in place at eaves, gable ends, openings, and intersections with vertical surfaces for securing of membrane, edging strips, attachment flanges of sheet metal, and roof fixtures.
i. Avoid contact of EPDM materials with fire retardant treated wood, except as approved by the roof membrane manufacturer and Contracting Officer.
j. Cants are securely fastened in place in the angles formed by walls and other vertical surfaces. The angle of the cant is 45 degrees and the height of the vertical leg is not less than 3-1/2 inch .
SECTION 07 53 23 Page 10
3.2 APPLICATION
Apply entire EPDM sheet utilizing fully adhered application method. Apply roofing materials as specified herein unless approved otherwise by the Contracting Officer.
3.2.1 Special Precautions
a. Do not dilute coatings or sealants unless specifically recommended by the materials manufacturer's printed application instructions. Do not thin liquid materials with cleaners used for cleaning EPDM sheet.
b. Keep liquids in airtight containers, and keep containers closed except when removing materials.
c. Use liquid components, including adhesives, within their shelf life period. Store adhesives at 60 to 80 degrees F prior to use. Avoid excessive adhesive application and adhesive spills, as they can be destructive to some elastomeric sheets and insulations; follow adhesive manufacturer's printed application instructions. Mix and use liquid components in accordance with label directions and manufacturer's printed instructions.
d. Provide clean, dry cloths or pads for applying membrane cleaners and cleaning of membrane
e. Do not use heat guns or open flame to expedite drying of adhesives or primers.
f. Require workmen and others who walk on the membrane to wear clean, soft-soled shoes to avoid damage to roofing materials.
g. Do not use equipment with sharp edges which could puncture the EPDM sheet.
h. Shut down air intakes and any related mechanical systems and seal open vents and air intakes when applying solvent-based materials in the area of the opening or intake. Coordinate shutdowns with the Contracting Officer.
3.2.2 EPDM Sheet Roofing
Provide a watertight roof membrane sheet free of contaminants and defects that might affect serviceability. Provide a uniform, straight, and flat edge. Unroll EPDM sheet roofing in position without stretching membrane.
Inspect for holes. Remove sections of EPDM sheet roofing that are damaged. Allow sheets to relax minimum 30 minutes before seaming. Lap sheets as specified, to shed water, and as recommended by the roof membrane manufacturer's published installation instructions for the application required but not less than 3 inch in any case.
3.2.3 Application Method
3.2.3.1 Fully Adhered Membrane Application
Layout membrane and side lap adjoining sheets in accordance with membrane manufacturer's printed installation instructions. Allow for sufficient membrane to form proper membrane terminations. Remove dusting agents and dirt from membrane and substrate areas where bonding adhesives are to be
SECTION 07 53 23 Page 11 applied. Apply specified adhesive evenly and continuously to substrate at rates recommended by the roof membrane manufacturer's printed application instructions. When adhesive is spray applied, roll with a paint roller to ensure proper contact and coverage. Do not apply bonding adhesive to surfaces of membrane in seam or lap areas. Allow adhesive to flash off or dry to consistency prescribed by manufacturer before adhering sheets to the substrate. Roll each sheet into adhesive slowly and evenly to avoid wrinkles; broom or roll the membrane to remove air pockets and fishmouths and to ensure full, continuous bonding of sheet to substrate. Form field lap splices or seams as specified. Check all seams and ensure full lap seal. Apply lap sealant to all adhesive formed seams and all cut edges of reinforced membrane materials.
3.2.4 Tape Seams / Lap Splices
Field form seams, or lap splices, with seam tape in accordance with membrane manufacturer's printed instructions and as specified. Clean and prime mating surfaces in the seam area. After primer has dried or set in accordance with membrane manufacturer's instructions, apply seam tape to bottom membrane and roll with a 3 inch to 4 inch wide smooth silicone or steel hand roller, or other manufacturer approved rolling device, to ensure full contact and adhesion of tape to bottom membrane. Tape end laps must be minimum 1 inch . Roll top membrane into position to check for proper overlap and alignment. Remove release paper from top of seam tape and form seam splice. Ensure top membrane contact with seam tape as release paper is removed. Roll the closed seam with a smooth silicone or steel hand roller, rolling first across the width of the seam then along the entire length, being careful not to damage the membrane. Apply minimum 9 inch long strip of membrane-backed flashing tape over T-intersections of roof membrane. Roll tape to ensure full adhesion and seal over T-joint.
3.2.5 Perimeter Attachment
Adhesive bond or mechanically secure roof membrane sheet at roof perimeter in a manner to comply with wind resistance requirements and in accordance with membrane manufacturer's printed application instructions. When adhesively bonding a mechanically fastened system in perimeter areas, the perimeter boundary of the adhesive bond must be the same as the boundary required for additional perimeter mechanical fastening to meet wind resistance requirements.
3.2.6 Securement at Base Tie-In Conditions
Mechanically fasten the roof membrane at penetrations, at base of curbs and walls, and at all locations where the membrane turns and angle greater than 4 degrees (1:12). Space fasteners a maximum of 12 inch on center, except where more frequent attachment is required to meet specified wind resistance or where recommended by the roof membrane manufacturer. Flash over fasteners with a fully adhered layer of material as recommended by the roof membrane manufacturer's printed data.
3.3 FLASHINGS
3.3.1 General
Provide flashings in the angles formed at walls and other vertical surfaces and where required to make the work watertight, except where metal flashings are indicated.
SECTION 07 53 23 Page 12
Provide a one-ply flashing membrane, as specified for the system used, and install immediately after the roofing membrane is placed and prior to finish coating where a finish coating is required. Flashings must be stepped where vertical surfaces abut sloped roof surfaces. Provide sheet metal reglet in which sheet metal cap flashings are installed of not more than 16 inch nor less than 8 inch above the roofing surfaces. Exposed joints and end laps of flashing membrane must be made and sealed in the manner required for roofing membrane.
3.3.2 Membrane Flashing
Install flashing and flashing accessories as the roof membrane is installed. Apply flashing to cleaned surfaces and as recommended by the roof membrane manufacturer and as specified. Utilize cured EPDM membrane flashing and prefabricated accessory flashings to the maximum extent recommended by the roof membrane manufacturer. Limit uncured flashing material to reinforcing inside and outside corners and angle changes in plane of membrane, and to flashing scuppers, pourable sealer pockets, and other formed penetrations or unusually shaped conditions as recommended by the roof membrane manufacturer where the use of cured material is impractical. Extend base flashing not less than 8 inch above roofing surface and as necessary to provide for seaming overlap on roof membrane as recommended by the roof membrane manufacturer.
Seal flashing membrane for a minimum of 3 inch on each side of fastening device used to anchor roof membrane to nailers. Completely adhere flashing sheets in place. Seam flashing membrane in the same manner as roof membrane, except as otherwise recommended by the membrane manufacturer's printed instructions and approved by the Contracting Officer. Reinforce all corners and angle transitions by applying uncured membrane to the area in accordance with roof membrane manufacturer recommendations. Mechanically fasten top edge of base flashing with manufacturer recommended termination bar fastened at maximum 12 inch on center. Install sheet metal flashing over the termination bar in the completed work. Mechanically fasten top edge of base flashing for all other terminations in a manner recommended by the roof membrane manufacturer. Apply membrane liner over top of exposed nailers and blocking and to overlap top edge of base flashing installation at curbs, parapet walls, expansion joints and as otherwise indicated to serve as waterproof lining under sheet metal flashing components.
3.3.3 Flashing at Roof Drain
Provide a tapered insulation sump into the drain bowl area. Do not exceed tapered slope of 18 degrees for unreinforced membrane and 5 degrees for reinforced membrane. Provide tapered insulation with surface suitable for adhering membrane in the drain sump area. Avoid field seams running through or within 24 inch of roof drain, or as otherwise recommended by the roof membrane manufacturer. Adhere the membrane to the tapered in the drain sump area. Apply water block mastic and extend membrane sheets over edge of drain bowl opening at the roof drain deck flange in accordance with membrane manufacturer's printed application instructions. Ensure membrane is free of wrinkles and folds in the drain area. Securely clamp membrane in the flashing clamping ring. Ensure membrane is cut to within 3/4 inch of inside rim of clamping ring to maintain drainage capacity. Do not cut back to bolt holes. Retrofit roof drains must conform to
ANSI/SPRI RD-1 .
SECTION 07 53 23 Page 13
3.3.4 PRE-FABRICATED CURBS
Securely anchor prefabricated curbs to nailer or other base substrate and flashed with EPDM membrane flashing materials.
3.3.5 Set-On Accessories
Where pipe or conduit blocking, supports and similar roof accessories, or isolated paver block, are set on the membrane, adhere reinforced membrane or walkpad material, as recommended by the roof membrane manufacturer, to bottom of accessories prior to setting on roofing membrane. Install set-on accessories to permit normal movement due to expansion, contraction, vibration, and similar occurrences without damaging roofing membrane. Do not mechanically secure set-on accessories through roofing membrane into roof deck substrate.
3.3.6 Lightning Protection
Flash lightning protection system components or attach to the roof membrane in a manner acceptable to the roof membrane manufacturer.
3.4 ROOF WALKPADS
Install walkpads at roof access points and where otherwise indicated for traffic areas and for access to mechanical equipment, in accordance with the roof membrane manufacturer's printed instructions. Provide minimum 6 inch separation between adjacent walkpads to accommodate drainage.
3.5 CORRECTION OF DEFICIENCIES
Where any form of deficiency is found, take additional measures as deemed necessary by the Contracting Officer to determine the extent of the deficiency and perform corrective actions as directed by the Contracting Officer.
3.6 CLEAN UP
Remove debris, scraps, containers and other rubbish and trash resulting from installation of the roofing system from job site each day.
3.7 PROTECTION OF APPLIED ROOFING
At the end of the day's work and when precipitation is imminent, protect applied membrane roofing system from water intrusion.
3.7.1 Water Cutoffs
Straighten insulation line using loose-laid cut insulation sheets and seal the terminated edge of the roof membrane system in an effective manner.
Remove the water cut-offs to expose the insulation when resuming work, and remove the insulation sheets used for fill-in.
3.7.2 Temporary Flashing for Permanent Roofing
Provide temporary flashing at drains, curbs, walls and other penetrations and terminations of roofing sheets until permanent flashings can be applied. Remove temporary flashing before applying permanent flashing.
SECTION 07 53 23 Page 14
3.7.3 Temporary Walkways, Runways, and Platforms
Do not permit storing, walking, wheeling, and trucking directly on applied roofing materials. Provide temporary walkways, runways, and platforms of smooth clean boards, mats or planks as necessary to avoid damage to applied roofing materials, and to distribute weight to conform to live load limits of roof construction. Use rubber-tired equipment for roofing work.
3.8 FIELD QUALITY CONTROL
3.8.1 Construction Monitoring
During progress of the roof work, Contractor must make visual inspections as necessary to ensure compliance with specified parameters. Additionally, verify the following:
a. Equipment is in working order. Metering devices are accurate.
b. Materials are not installed in adverse weather conditions.
c. Substrates are in acceptable condition, in compliance with specification, prior to application of subsequent materials.
Nailers and blocking are provided where and as needed.
Insulation substrate is smooth, properly secured to its substrate, and without excessive gaps prior to membrane application.
The proper number, type, and spacing of fasteners are installed.
Materials comply with the specified requirements.
All materials are properly stored, handled and protected from moisture or other damages. Liquid components are properly mixed prior to application.
Membrane is allowed to relax prior to seaming. Adhesives are applied uniformly to both mating surfaces and checked for proper set prior to bonding mating materials. Mechanical attachments are spaced as required
Membrane is properly overlapped.
Membrane seaming is as specified and seams are hand rolled to ensure full adhesion and bond width. In-seam sealant is applied when adhesive seams are used in the field of the roof. All seams are checked at the end of each work day.
Applied membrane is inspected and repaired as necessary prior to ballast installation.
Membrane is fully adhered without ridges, wrinkles, kinks, fishmouths.
Installer adheres to specified and detailed application parameters.
Associated flashings and sheet metal are installed in a timely manner in accord with the specified requirements.
SECTION 07 53 23 Page 15
Ballast is within the specified weight range.
Temporary protection measures are in place at the end of each work shift.
3.8.2 Manufacturer's Inspection
Manufacturer's technical representative must visit the site a minimum of three times during the installation for purposes of reviewing materials installation practices and adequacy of work in place. Inspections must occur during the first 20 squares of membrane installation, at mid-point of the installation, and at substantial completion, at a minimum. Do not exceed additional inspections one for each 100 squares of total roof area with the exception that follow-up inspections of previously noted deficiencies or application errors must be performed as requested by the Contracting Officer. After each inspection, submit a report signed by the manufacturer's technical representative to the Contracting Officer within 3 working days. Note overall quality of work, deficiencies and any other concerns, and recommended corrective action.
3.9 INSTRUCTIONS TO GOVERNMENT PERSONNEL
Furnish written and verbal instructions on proper maintenance procedures to designated Government personnel. Furnish instructions by a competent representative of the roof membrane manufacturer and include a minimum of 4 hours on maintenance and emergency repair of the membrane. Include a demonstration of membrane repair, and give sources of required special tools. Furnish information on safety requirements during maintenance and emergency repair operations.
3.10 INFORMATION CARD
For each roof, furnish a typewritten information card for facility records anda photoengraved 0.032 inch thick aluminum card for exterior display.
Card must be 8-1/2 by 11 inch minimum, identifying facility name and number; location; contract number; approximate roof area; detailed roof system description, including deck type, membrane, number of plies, method of application, manufacturer, insulation and cover board system and thickness; presence of tapered insulation for primary drainage, presence of vapor retarder; date of completion; installing contractor identification and contact information; membrane manufacturer warranty expiration, warranty reference number, and contact information. Install card at roof top or access location as directed by the Contracting Officer and provide a paper copy to the Contracting Officer.
-- End of Section --
SECTION 07 53 23 Page 16
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
1 01 14 00 1 Preconstruction Submittals List of Contact Personnel 1.4.1.1 2 01 20 00 1 Preconstruction Submittals Schedule of Prices 1.3 G 3 01 32 01.00 10 1 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G 4 01 32 01.00 10 1 Preconstruction Submittals Initial Project Schedule 3.4.2 G 5 01 32 01.00 10 1 Preconstruction Submittals Periodic Schedule Update 3.6.2 G 6 01 33 00 1 Preconstruction Submittals Submittal Register 1.8 G 7 01 35 26 1 Preconstruction Submittals APP - Construction 1.7.1 G 8 01 35 26 1 Preconstruction Submittals Accident Prevention Plan (APP) 1.7 G 9 01 35 26 6 Test Reports Monthly Exposure Reports 1.4 10 01 35 26 6 Test Reports Notifications and Reports 1.12 11 01 35 26 6 Test Reports Accident Reports - If required 1.12.2 G 12 01 35 26 6 Test Reports LHE Inspection Reports 1.12.3 13 01 35 26 7 Certificates Standard Lift Plan 1.7.3.2 G 14 01 35 26 7 Certificates Critical Lift Plan 1.7.3.3 G 15 01 35 26 7 Certificates Activity Hazard Analysis (AHA) 1.8 16 01 35 26 7 Certificates Hot Work Permit 1.9.1 17 01 35 26 7 Certificates Certificate of Compliance 1.12.4 18 01 45 00.10 20 1 Preconstruction Submittals QC Plan 1.6 G 19 01 50 00 1 Preconstruction Submittals Construction Site Plan 1.3 G 20 01 50 00 1 Preconstruction Submittals Traffic Control Plan 3.3.1 G 21 01 50 00 1 Preconstruction Submittals Haul Road Plan 2.2.1 G 22 01 57 19 1 Preconstruction Submittals Preconstruction Survey 1.6.1 23 01 57 19 1 Preconstruction Submittals Regulatory Notifications 1.6.2 G 24 01 57 19 1 Preconstruction Submittals Employee Training Records 1.6.4 G 25 01 57 19 1 Preconstruction Submittals Solid Waste Management Permit 1.11 G 26 01 57 19 7 Certificates Employee Training Records 1.6.4 G 27 01 57 19 11 Closeout Submittals Regulatory Notifications 1.6.2 G
28 01 57 19 11 Closeout Submittals Assembled Employee Training Records 1.6.4 G
29 01 57 19 11 Closeout Submittals Solid Waste Management Permit 1.11 G 30 01 57 19 11 Closeout Submittals Waste Determination Documentation 3.7.1 G
31 01 57 19 11 Closeout Submittals Project Solid Waste Disposal Documentation Report 3.7.2.1 G
32 01 57 19 11 Closeout Submittals Sales Documentation 3.7.2.1 G
33 01 57 19 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.3.1 G
34 01 57 19 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste 3.7.3.5 G
35 01 74 19 1 Preconstruction Submittals Construction Waste Management Plan 1.7 G
36 01 74 19 11 Closeout Submittals Final Construction Waste Diversion Report 1.1
37 01 78 00 3 Product Data Warranty Management Plan 1.8.1 38 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.7 G 39 01 78 00 11 Closeout Submittals As-Built Drawings 3.1 G
TITLE: REPLACE ROOF BUILDING 81
SUBMITTAL REGISTER
JOB NAME: 81 ROOF
LOCATION:
CONTRACT NO:
CONTRACTOR:
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES APPROVING AUTHORITY
ATTACHMENT 2
Acti vity
Trans mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
TITLE: REPLACE ROOF BUILDING 81
SUBMITTAL REGISTER
JOB NAME: 81 ROOF
LOCATION:
CONTRACT NO:
CONTRACTOR:
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES APPROVING AUTHORITY
40 01 78 00 11 Closeout Submittals Record Drawings 3.3 G
41 01 78 00 11 Closeout Submittals As-Built Record of Equipment and Materials 1.8.1
42 01 78 00 11 Closeout Submittals Final Approved Shop Drawings 3.4 G 43 01 78 23 10 Operation and Maintenance Data O&M Database 1.4 G 44 02 41 00 1 Preconstruction Submittals Demolition Plan 1.2.2 G 45 02 41 00 1 Preconstruction Submittals Existing Conditions 1.1 46 02 41 00 7 Certificates Notification 1.7 G 47 02 41 00 11 Closeout Submittals Receipts 3.2.3 48 06 10 00 6 Test Reports Preservative-treated 1.4.2 49 06 10 00 7 Certificates Certificates of Grade 1.7.1 50 06 10 00 7 Certificates Preservative Treatment 1.6 51 07 22 00 2 Shop Drawings Insulation Board Layout 1.3 G 52 07 22 00 2 Shop Drawings Verification of Existing Conditions 1.3 G 53 07 22 00 3 Product Data Insulation 2.1 G 54 07 22 00 3 Product Data Cover Board 1.4 G 55 07 22 00 3 Product Data Moisture Control 2.4 G 56 07 22 00 3 Product Data Asphalt 1.10.1 G 57 07 22 00 3 Product Data Asphalt 2.3.3 G 58 07 22 00 3 Product Data Recycled Content For Insulation 2.1.2 59 07 22 00 6 Test Reports Flame Spread Rating 1.8.1 G 60 07 22 00 7 Certificates Installer Qualifications 1.6 G 61 07 22 00 7 Certificates Indoor Air Quality For Insulation 2.1.3 62 07 22 00 8 Manufacturer's Instructions Insulation 2.1 G 63 07 53 23 2 Shop Drawings Roof Plan Drawing 1.3.1 64 07 53 23 2 Shop Drawings Boundaries of Enhanced Perimeter 1.3.1 65 07 53 23 2 Shop Drawings Location of Perimeter Half-Sheets 1.3.1
66 07 53 23 2 Shop Drawings Spacing of Perimeter and Corner fasteners 1.3.1
67 07 53 23 2 Shop Drawings Slopes 1.3.1 68 07 53 23 3 Product Data Cement 2.2 69 07 53 23 3 Product Data EPDM Sheet 2.1.1 G 70 07 53 23 3 Product Data Seam Tape 2.1.3 71 07 53 23 3 Product Data Bonding Adhesive 2.1.5 72 07 53 23 3 Product Data Lap Splice Adhesive 2.1.4 73 07 53 23 3 Product Data Water Cutoff Mastic/Water Block 2.1.7
74 07 53 23 3 Product Data Lap Cleaner, Lap Sealant, and Edge Treatment 2.1.6
75 07 53 23 3 Product Data Flashings 3.3 76 07 53 23 3 Product Data Flashing Accessories 2.1.8 77 07 53 23 3 Product Data Flashing Tape 2.1.8.1 78 07 53 23 3 Product Data Roof Insulation 2.1.12 79 07 53 23 3 Product Data Pre-Manufactured Accessories 2.1.10
Acti vity
Trans mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date RCD From
CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date
RCD From
APPR
Authority Remarks
TITLE: REPLACE ROOF BUILDING 81
SUBMITTAL REGISTER
JOB NAME: 81 ROOF
LOCATION:
CONTRACT NO:
CONTRACTOR:
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES APPROVING AUTHORITY
80 07 53 23 3 Product Data Warranty 1.8 G 81 07 53 23 7 Certificates Qualification of Manufacturer 1.4.1 82 07 53 23 7 Certificates Qualification of Applicator 1.4.2 83 07 53 23 7 Certificates Wind Uplift Resistance 1.4.5 G 84 07 53 23 7 Certificates Fire Resistance 1.4.4 G 85 07 53 23 8 Manufacturer's Instructions Application 3.2 G 86 07 53 23 8 Manufacturer's Instructions Application Method 3.2.3 G 87 07 53 23 8 Manufacturer's Instructions Membrane Flashing 3.3.2 G 88 07 53 23 8 Manufacturer's Instructions Seam Tape 2.1.3 89 07 53 23 8 Manufacturer's Instructions Tape Seams / Lap Splices 3.2.4 90 07 53 23 8 Manufacturer's Instructions Perimeter Attachment 3.2.5 91 07 53 23 8 Manufacturer's Instructions Primer 3.2.4 92 07 53 23 8 Manufacturer's Instructions Fasteners 3.2.6 93 07 53 23 8 Manufacturer's Instructions Pre-Manufactured Accessories 2.1.10 94 07 53 23 8 Manufacturer's Instructions Cold Weather 1.6 G 95 07 53 23 11 Closeout Submittals Warranty 1.8 96 07 53 23 11 Closeout Submittals Information Card 3.9 97 07 53 23 11 Closeout Submittals Instructions To Government Personnel 3.8 98 07 60 00 2 Shop Drawings Exposed Sheet Metal 2.2.1 G 99 07 60 00 2 Shop Drawings Gutters 3.1.14 G 100 07 60 00 2 Shop Drawings Downspouts 3.1.15 G 101 07 60 00 2 Shop Drawings Expansion Joints 3.1.19 G 102 07 60 00 2 Shop Drawings Gravel Stops and fascia 2.2.1 G 103 07 60 00 2 Shop Drawings Flashing for Roof Drains 3.1.16 G 104 07 60 00 2 Shop Drawings Counterflashing 3.1.10 G
105 07 60 00 2 Shop Drawings Flashing at Roof Penetrations and Equipment Supports 3.1.20 G
106 07 60 00 2 Shop Drawings Reglets 2.2.12 G 107 07 60 00 2 Shop Drawings Scuppers 3.1.17 G 108 07 60 00 2 Shop Drawings Copings 3.1.22 G 109 07 60 00 2 Shop Drawings Recycled Content 2.1 110 07 60 00 4 Samples Finish Samples 1.4.2 G 111 07 60 00 8 Manufacturer's Instructions Instructions for Installation 1.4.3 G 112 07 60 00 8 Manufacturer's Instructions Quality Control Plan 3.5 G 113 07 60 00 10 Operation and Maintenance Data Cleaning and Maintenance 1.4.3 G 114 26 20 00 3 Product Data Conduit and Fittings 2.2 G 115 26 20 00 3 Product Data Wires and Cables 2.5 G 116 26 20 00 3 Product Data Outlet Boxes and Covers 2.3 G 117 26 41 00 2 Shop Drawings Overall lightning protection system 1.4.1.1 G 118 26 41 00 2 Shop Drawings Each major component 1.4.1.2 G
119 26 41 00 6 Test Reports Lightning Protection and Grounding System Test Plan 1.4.3 G
Acti vity
Trans mittal #
Specification Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth
Date…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .