Questions and Answers.pdf
PDF 109 KB Posted
- Solicitation number
- SP330021Q0106
- Issued by
-
Defense Logistics Agency Distribution
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Statement Of Work (SOW).pdf | ||
| Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Will these bollards need to be filled with concrete after installed? If so are there specs on the type of concrete? Answer – No
2. Do these need to be painted? If so, what color? Answer – Yellow
3. Is there a detailed drawing for the installation kit and a rating for the anchor bolt? Answer – Reference Uline item H-2121 or equal. I have no detailed drawing for the installation kit.
4. Is there a grade for the bollard pipe being requested? Schedule 40? Schedule 80? Answer – Reference Uline item H-4971F or equal. There is no specific grade. The bollards serve to minimize damage to the legs of pallet racks.
5. Does the bollard have to be galvanized coated? Answer – No
6. Is there a required crush rating for the bollards? Answer – No
7. What level of excavation will be required? Are there Bollards already in place that will need removed?
Answer - Leveling is required but to be specific no excavation needed. They simply are to be flush and level to the concrete warehouse floor. The leveling and installation kit would suffice, but a hammer drill must be used to support anchoring the stud/screw to fasten the nut.
8. Please provide drawings of bollard installation locations. Answer – Drawings will be emailed directly to contractors who request them.
IF you sent a question to steven.lesh@dla.mil but do not see it answered above, please reach out to me again and I will make sure to provide you with an answer.
mailto:steven.lesh@dla.mil
File details come from the government source that posted it. Updated .