J.1_-_PWS.pdf
PDF 305 KB Posted
- Solicitation number
- SP3300-19-R-5004
- Issued by
-
Defense Logistics Agency Distribution
About this file
This performance work statement outlines labor support services requirements for the Work in Process Control Area at Corpus Christi Army Depot. The contractor shall provide management, supervision, and labor to perform material receiving, storage, issue, delivery, and computer operations in support of the depot's maintenance activity. Key responsibilities include verifying material against receiving documents; storing items in automated storage racks, pallets, and trays; selecting and issuing material to work centers; operating material handling equipment; and monitoring the automated storage and retrieval system. The contractor must meet acceptable performance levels for timely storage, issue of urgent requests, and accuracy. The contract also requires safety, training, quality control, and report submission programs.
Attachment J.1
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
PERFORMANCE WORK STATEMENT (PWS)
Corpus Christi Army Depot (CCAD) Work in Process Control Area (WIPCA) Labor Support Services For
Defense Logistics Agency (DLA) Distribution, Corpus Christi, TX
SECTION C‐1: GENERAL CONDITIONS AND REQUIREMENTS
1.0 Background.
A. DLA Distribution Corpus Christi, TX has a requirement for a Contractor to provide all
| management, | supervision, | and | labor, | required | to | perform | receipt, | stow, | issue, | local | delivery | |||
| of | material, | and | Computer | Operations | in | the | Work | in | Process | Control | Area | (WIPCA) | of | the |
| Corpus | Christi | Army | Depot | (CCAD) | Maintenance | Activity. | The | Labor | Support | Services | ||||
| performed | under | this | contract | will | help | to | ensure | that | DLA | Distribution | Corpus | Christi | ||
| provides | distribution | support | to | the | WIPCA | CCAD | Maintenance | Activity | during | maintenance | ||||
| cycles | in | order | to | maintain | production | schedules. |
B. DLA Distribution Corpus Christi is collocated with the Corpus Christi Army Depot (CCAD)
| on | Naval | Air | Station | (NAS) | Corpus | Christi. | CCAD | is | the | industry | leader | of | repair | and | |
| overhaul | for | helicopters, | engines | and | components | in | Army | Aviation. | CCAD | is | the | largest | |||
| rotary | wing | repair | facility | in | the | world | providing | global | support | to | all | Branches | of | the | |
| Military | by | conducting | accident | investigations, | troubleshooting, | and | repairing | aircraft | |||||||
| anytime, | anywhere. | CCAD | is | designated | as | a | Center | of | Industrial | and | Technical | Excellence | |||
| for | rotary | wing | aircraft | (less | avionics). | CCAD | provides | overhaul, | repair, | modification, | |||||
| recapitalization, | retrofit, | testing | and | modernization | of | helicopters, | engines | and | components | ||||||
| for | all | Military | Branches | and | Foreign | Military | Sales. |
1.1 Scope of Work.
A. This is a non‐personal services contract to provide Labor Support Services to DLA
| Distribution | Corpus | Christi. | The | Government | shall | not | exercise | any | supervision | or | control | |||
| over | the | contract | staff | performing | the | services | described | herein. | Such | contract | service | |||
| providers | shall | be | accountable | solely | to | the | Contractor | who, | in | turn, | is | responsible | to | the |
| Government. | The | Government | and | the | Contractor | understand | that | the | services | to | be | |||
| provided | under | this | contract | by | the | Contractor | are | non‐personal | services | and | that | no | ||
| Employer‐Employee | relationship | exists | between | the | Government | and | the | Contractor. |
B. The Contractor shall provide all management, supervision, and labor required to perform
| validation | of | material | prior | to | storage, | stow, | issue, | local | material | delivery | activities | and | |
| Computer | Operations | in | support | of | the | Work | in | Process | Control | Area | (WIPCA) | of | the |
| Corpus | Christi | Army | Depot | (CCAD) | Maintenance | Activity. | The | Contractor | shall | utilize | the | ||
| Automated | Storage | Retrieval | System | (ASRS) | to | perform | the | stow, | pick | and | issue | process; | |
| Logistics | Modernization | Program | (LMP) | and | the | Federal | Logistics | Data | (FEDLOG) | to | |||
| perform | required | research; | and | the | Electronic | Turn‐In | Document | System | (ETIDS) | to | |||
| perform | the | Beyond | Economical | Repair | (BER) | processes. | The | Contractor | shall | utilize | the | ||
| Distribution | Standard | System | (DSS) | to | manifest | material | moving | to | the | work | centers | by |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS non‐Automatic Ground Vehicle (AGV) transport.
C. The Government may provide technical direction, which will assist the Contractor in
| accomplishing | the | work | detailed | in | the | PWS; | however, | the | Government | will | not | control | the | |
| methods | used | by | the | Contractor | to | perform | the | service | requirements | set | forth | in | the | PWS. |
| The | Contractor | shall | submit | to | the | Contracting | Officer's | Representative | (COR) | all | ||||
| documentation | generated | as | a | result | of | these | services. |
1.2 Operating Conditions.
1.2.1 Interaction with Other Government Organizations.
| A. The | Contractor’s | primary | interaction | with | the | Government | shall | be | through | the |
| Government | employees | located | on | site. | The | Government | will: |
| 1. Perform | all | Contracting | Officer’s | Representative | (COR) | functions. | |||||
| 2. | Perform | quality | assurance | evaluations | of | the | Contractor’s | performance. | |||
| 3. Provide | the | primary | interface | between | the | Contractor | and | the | host | installation, | local |
customers, and DLA Distribution.
| B. The | COR | monitors | all | technical | aspects | of | the | contract | and | assists | in | contract |
| administration. | The | COR | is | authorized | to | perform | the | following | functions: |
| 1. Provide | the | primary | interface | between | the | Contractor | and | CCAD. | ||
| 2. Assure | that | the | Contractor | performs | the | technical | requirements | of | the | contract. |
| 3. Perform | inspections | necessary | in | connection | with | contract | performance. | |||
| 4. Maintain | written | and | oral | communications | with | the | Contractor | concerning | technical |
| aspects | of | the | contract. | |||||
| 5. Issue | written | interpretations | of | technical | requirements.. | |||
| 6. Monitor | the | Contractor's | performance, | conduct | quality | assurance | evaluations, | and |
| notify | the | KO | and | Contractor | of | any | efficiencies | and | deficiencies. | ||
| 7. Assist | in | identifying | and | incorporating | process | improvements. | |||||
| 8. Coordinate | availability | of | Government | Property | (GP). | ||||||
| 9. Provide | access | and | site | entry | of | Contractor | personnel. | ||||
| 10. Perform | other | inherently | Governmental | functions, | or | other | functions, | not | part | of | these |
support services.
| C. A | letter | of | designation | issued | to | the | COR, | a | copy | of | which | is | sent | to | the | Contractor, | states | the |
| responsibilities | and | limitations | of | the | COR, | especially | with | regard | to | changes | in | cost | or | price | ||||
| and | estimates | or | changes | in | delivery | dates. | The | COR | is | not | authorized | to | change | any | of | the | ||
| terms | and | conditions | of | the | contract. |
| D. The | Government | and | the | Contractor | will | have | personnel | working | in | the | same | area. | The | |
| Government | will | provide | general | instructions | on | limitations | and | deadlines. | Additional | |||||
| instructions | will | be | provided | for | any | unusual | assignments | or | those | that | vary | from | ||
| established | procedures. | Contractor | personnel | will | independently | carry | out | the | tasks | |||||
| identified | in | this | PWS. | Completed | work | will | be | spot‐checked | by | the | Government | for | ||
| adherence | to | procedures, | accuracy, | and | completeness. |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
1.2.2 Place of Performance.
A. The primary place of performance for work performed under this Contract is at
DLA Distribution Corpus Christi and Corpus Christ Army Depot (CCAD) in Corpus Christi, TX.
1.2.3 Period of Performance.
A. The period of performance shall be for one (1) Base Year of twelve (12) months and four (4) twelve (12) month Option Years from the date of contract award (DACA).
1.2.4 Federal Holidays.
A. Federal holidays generally observed by Government personnel include the following:
Observed Federal Holidays
| New | Year’s | Day | Labor | Day | |
| Martin | Luther | King | Day | Columbus | Day |
| President’s | Day | Veteran’s | Day | ||
| Memorial | Day | Thanksgiving | Day | ||
| Independence | Day | Christmas | Day |
| B. If | the | holiday | falls | on | a | Saturday, | it | will | be | observed | on | the | preceding | Friday. | If | the | holiday | |
| falls | on | a | Sunday, | it | will | be | observed | on | the | following | Monday. | The | Contractor | shall | not | be | ||
| required | to | perform | services | on | these | days. |
| C. In | the | event | an | Executive | Order | issued | by | the | President | of | the | United | States | declares |
| Agencies | of | the | Federal | Government | closed | for | a | regularly | scheduled | workday, | the | |||
| Contracting | Officer’s | Representative | (COR), | in | conjunction | with | the | Contracting | Officer | (KO) | ||||
| and/or | the | Contract | Specialist, | will | determine | and | advise | the | Contractor | on | whether | |||
| services | are | required | for | that | day. |
1.2.5 Hours of Operation of and Access to the Host Installation.
A. The normal hours of operation for DLA Distribution Corpus Christi Government employees
| (e.g. | the | Contracting | Officer’s | Representative | (COR)) | are | Monday | through | Friday, | 0700‐ |
| 1530, | excluding | Federal | Holidays. |
| B. The | Contractor | shall | perform | all | services, | at | a | minimum, | during | First, | Second | and | Third | |
| Shifts | Monday | through | Saturday. | The | Contractor | may | be | required | to | establish | a | Saturday | ||
| Shift | to | support | the | maintenance | work | centers | and | to | complete | distribution | support | for | all | |
| production | workload. | The | Contractor | shall | perform | workload | planning | and | adjust | staffing | ||||
| as | needed | to | meet | the | Acceptable | Performance | Levels | (APLs). | The | Contractor | shall | |||
| implement | a | two | (2) | hour | call | back | roster | capability | to | provide | emergency | support | for | |
| customer | requirements | outside | of | the | normal | three | shift | operating | hours, | which | may | occur | ||
| due | to | production | surges | or | unforeseen | requirements | requested | by | CCAD. | The | Contractor | |||
| shall | be | prepared | to | adjust | operational | hours | when | required | by | the | COR | to | support | changes |
| in | the | mission | requirements. |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
C. Due to changing traffic requirements brought on by construction, changing missions, and
| security | concerns | within | the | host | installation, | access | to | the | host | installation | is | subject | to |
| change, | sometimes | with | little | or | no | warning. | Inbound | and | outbound | traffic | restrictions | may |
exist.
D. Force Protection Conditions (FPCONs) may affect access to the host installations and the
| Distribution | Center. | The | FPCON | is | established | by | the | host | installation | or | higher | national | ||
| command | authorities, | and | the | Installation | Commander | is | responsible | for | implementing | the | ||||
| proper | response | to | progressive | levels | of | terrorist | threats. | FPCONs | are | normally | displayed | |||
| at | most | entrance | gates, | building | entrances | and | office | entrances. | The | Contractor | shall | |||
| adhere | to | and | operate | IAW | any | restrictions | imposed | as | a | result | of | a | FPCON. | Measures |
| implemented | under | the | various | levels | of | terrorist | threat | may | impact | the | Contractor’s | |||
| normal | operational | approach | to | distribution | services. | The | Contractor | shall | ensure | that | ||||
| distribution | services | are | sustained | during | heightened | security | measures. |
1.2.6 Vehicle Registration.
A. The Contractor shall register all Contractor‐provided vehicles used in performance of the
| contract | requirements | and | ensure | that | Contractor | Employee | vehicles | to | be | driven | on | the | ||||
| installation, | to | include | motorcycles, | are | registered | with | the | installation | security | office | and | |||||
| are | in | conformance | with | local | regulations | in | effect | at | the | time | of | registration | and | as | long | as |
| employed | by | the | Contractor. | The | Government | will | not | permit | access | to | the | installation | ||||
| without | proper | vehicle | identification | and | registration. | Evidence | of | a | valid | driver’s | license, | |||||
| vehicle | registration | card, | and | insurance | are | required | for | registration. | Contractor | |||||||
| Employees | shall | maintain | current | registration | and | proof | of | insurance | on | all | privately | owned | ||||
| vehicles | (POVs) | brought | on | the | installation. | The | Contractor | shall | maintain | current | ||||||
| registration | and | proof | of | insurance | on | all | Contractor‐owned | vehicles | brought | on | the | |||||
| installation. | The | Contractor | shall | return | all | Government | vehicle | passes | to | the | Government | |||||
| either | within | one | working | day | of | the | completion | of | the | contract | or | upon | termination | of | an | |
| individual's | employment, | whichever | comes | first. |
1.2.7 Parking and Traffic Control.
A. The Contractor and its Employees shall abide by installation parking and traffic regulations.
| All | vehicles | shall | be | parked | in | designated | parking | areas | only. | Vehicles | parked | in | non‐ | |
| designated | parking | areas | may | be | booted | or | towed | at | the | owner’s | expense. | The | Contractor | |
| and | its | Employees | shall | conform | to | Federal, | State | and | installation | driving | regulations. | |||
| Parking | within | the | secure | area | will | require | the | appropriate | placard, | which | the | Contractor | ||
| shall | request | through | the | COR | and | is | issued | by | the | installation. |
1.2.8 Work Schedule.
A. The core hours for First Shift are 0600 – 1430 hours, Monday through Friday except Federal
| Holidays. | The | Contractor | shall | stagger | the | start | and | end | times | for | each | Employee | on | the | |
| Shift | to | ensure | that | the | daily | workload | is | completed. |
B. The core hours for the Second Shift are 1400 – 2230 hours, Monday through Friday except
| Federal | Holidays. | The | Contractor | shall | stagger | the | start | and | end | times | for | each | Employee | |
| on | the | Shift | to | ensure | that | the | daily | workload | is | completed. |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
C. The core hours for the Third Shift are 2200 – 0630 hours, Monday through Friday except
| Federal | Holidays. | The | contractor | shall | stagger | the | start | and | end | times | for | each | Employee | |
| on | the | Shift | to | ensure | that | the | daily | workload | is | completed. |
D. The Contractor shall not work overtime without the prior coordination with the COR or KO.
| The | Contractor | shall | work | weekends | and | Federal | holidays | when | operational | requirements | ||||
| dictate. | Notice | to | work | weekends | or | Federal | holidays | may | be | subject | to | last | minute | |
| requests | from | the | customer. | The | Project | Supervisor | must | rearrange | Contractor | personnel | ||||
| schedules | to | minimize | use | of | overtime | hours. | The | Government | reserves | the | right | to | require | |
| the | Contractor | to | work | a | standard | Saturday | and/or | Sunday | Shift | when | there | are | temporary | |
| increases | in | workload | or | there | is | a | valid | customer | requirement. | This | may | require | the | |
| Contractor | to | make | last | minute | changes | to | the | Contractor | Employee | schedules | to | |||
| accommodate | this | requirement. |
1.2.9 Travel.
A. Local travel by Contractor personnel is not authorized in the performance of this contract.
1.3 Personnel.
A. All contract personnel attending meetings, answering Government telephones,
| corresponding | by | e‐mail, | and | working | in | other | situations | where | their | Contractor | status | is | |||
| not | obvious | to | third | parties | are | required | to | identify | themselves | as | such | to | avoid | creating | an |
| impression | in | the | minds | of | the | members | of | the | public | that | they | are | Government | officials. | |
| All | Contractor | Employees | shall | wear | required | Government | ID | badges | conspicuously | on | his | ||||
| or | her | outer | clothing | above | the | waist | at | all | times | and | shall | identify | themselves | as | |
| Contractors | while | in | the | work | place | and | at | meetings. | Contractor | personnel | may | also | wear | ||
| distinctive | clothing | bearing | the | name | of | the | company | and/or | badges | that | contain | the | |||
| company | name | and | Contractor | personnel | name. | During | performance | of | the | service | |||||
| requirements | set | forth | in | this | PWS, | all | Contractor | personnel | shall | introduce | themselves | or | |||
| shall | ensure | they | are | introduced | as | Contractor | personnel. | Contractor | personnel | ||||||
| identification | shall | not | be | substituted | for | DoD | required | passes | or | badges. |
| B. The | Contractor | shall | report | all | contractor | labor | hours | (including | subcontractor | labor | hours) | |||||
| required | for | performance | of | services | provided | under | this | contract | for | the | DLA | via | a | secure | ||
| data | collection | site. | The | contractor | is | required | to | completely | fill | in | all | required | data | fields | ||
| using | the | following | web | address: | http://www.ecmra.mil/. | Reporting | inputs | will | be | for | the | |||||
| labor | executed | during | the | period | of | performance | during | each | Government | fiscal | year | (FY), | ||||
| which | runs | October | 1 | through | September | 30. | While | inputs | may | be | reported | any | time | during | ||
| the | FY, | all | data | shall | be | reported | no | later | than | October | 31 | of | each | calendar | year. | Contractors |
| may | direct | questions | to | the | help | desk | at | http://www.ecmra.mil. |
| C. The | Contractor | shall | provide | the | names | and | telephone | numbers | (to | include | mobile | |||||
| telephone | and | pager, | as | applicable) | for | all | Key | Personnel | in | writing | at | the | start | of | the | |
| transition | period. | All | Key | Personnel, | upon | notification, | shall | be | on‐site | to | meet | with | ||||
| Government | personnel | within | one | (1) | hour | during | normal | duty | hours | and | within | two | (2) | |||
| hours | outside | of | normal | duty | hours, | when | not | in | an | excused | absence | status. | In | the | event | of |
| the | replacement | of | any | Key | Personnel, | the | Contractor | shall | submit | proposed | substitution(s) | |||||
| to | the | KO | or | COR, | in | writing, | IAW | Section | H, | Special | Contract | Requirements. |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
D. The Government estimates the following labor categories in paragraphs 1.6.1, Key
| Personnel | and | 1.6.2 | Non‐Key | Labor | Categories | the | Contractor | shall | identify | to | perform | the | |
| requirements | of | the | contract. | This | estimate | does | not | prohibit | the | Contractor | from | using | |
| different | labor | categories. |
1.3.1 Key Personnel.
| A. The | Contractor, | or | Contractor | and | Subcontractor | Team, | must | have | the | necessary | |||||
| qualifications | to | provide | these | services. | The | Contractor | shall | identify | all | key | personnel | by | |||
| name, | position, | and | firm | ((if | other | than | prime | contractor, | show | the | address | (city/state) | |||
| where | the | firm | is | located)) | in | the | organization | chart. | Resumes | will | be | presented | with | the | |
| appropriate | dates | and | responses | to | required | qualifications | as | noted | in | the | corresponding | ||||
| position | description. | The | resumes | will | be | evaluated | to | ensure | that | the | individuals | meet | the | ||
| desired | qualifications | and | experience | necessary | to | perform | the | roles | and | responsibilities | |||||
| required | of | the | tasks | detailed | in | this | PWS. | Any | substitution | of | personnel | following | contract | ||
| award | shall | also | meet | the | qualification | requirements | of | the | PWS. | Any | permanent | ||||
| substitution | of | Contractor | personnel | at | time | of | award | or | any | time | thereafter | must | be | ||
| approved | by | the | KO | and | requires | the | submission | of | resumes | and | letters | of | intent | for | this |
purpose.
B. Project Supervisor.
| The | Contractor | shall | designate | a | Project | Supervisor | who | will | be | onsite | during | performance | |||
| and | must | possess | the | basic | knowledge | and | skills | required | to | plan, | control, | and | manage | the | |
| successful | completion | of | the | work. | The | Project | Supervisor | shall | be | qualified | to | be | the | ||
| Contractor’s | onsite | supervisor | and | point | of | contact | (POC) | to | Government | representatives. | |||||
| The | Project | Supervisor | serves | as | the | principle | communicators | of | policies | and | procedures | ||||
| between | DLA | Distribution | Corpus | Christi, | CCAD, | and | the | Contractor’s | Employees. | The | |||||
| Project | Supervisor | is | responsible | for | ensuring | compliance | to | all | contract | requirements. | The | ||||
| Project | Supervisor | shall | provide | overall | supervision | for | Contactor | Employees, | to | include, | |||||
| but | not | limited | to | planning | and | managing | the | work | professionally, | ensuring | that | work | is | ||
| scheduled | properly | to | obtain | maximum | use | of | resources; | ensuring | that | accurate | and | timely | |||
| reports | are | provided; | provide | effective | supervision | to | prevent | inefficient | or | wasteful | |||||
| methods | in | the | performance | of | the | services; | and | ensure | cost | saving | factors | and | quality | ||
| controls | are | used | to | ensure | work | is | performed | as | scheduled | and | at | a | fair | and | reasonable |
| cost. | The | Project | Supervisor | shall | be | familiar | with | the | contract | requirements, | manage | day‐ | |||
| to‐day | issues | and | activities | and | attend | scheduled | and | unscheduled | meetings | and | briefings. | ||||
| The | Project | Supervisor | may | be | required | to | work | weekends | to | provide | supervision | and | |||
| oversight | of | any | Contractor | Employees | working | overtime. | The | Project | Supervisor | shall | |||||
| respond | to | Government | inquiries | within | 30 | minutes | of | notification | during | normal | duty | ||||
| hours | and | within | two | (2) | hours | of | notification | after | normal | duty | hours. |
1.3.2 Non‐Key Personnel Labor Categories.
A. Warehouse Specialist Lead.
| The | Contractor | shall | designate | one | Warehouse | Specialist | Lead | for | First, | Second | and | Third | ||
| Shifts | Monday | through | Friday | and | weekends | as | required. | The | Warehouse | Specialist | Leads | |||
| serve | as | working | leaders | over | Employees | engaged | in | the | operations | of | the | WIPCA | PAK | line |
| processes. | The | Warehouse | Specialist | Leads | distribute | and | balance | workload | to | improve |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
| workflow | or | to | accommodate | unexpected | temporary | increases | in | workload. | The | |||||
| Warehouse | Specialist | Leads | are | also | responsible | to | check | work | in | progress | on | the | PAK | |
| lines, | respond | to | customer | inquiries, | monitors, | and | process | Aircraft | on | Ground | (AOG) | and | ||
| Flight | Test | issues. | The | Warehouse | Specialist | Leads | must | be | prepared | to | answer | workers’ | ||
| questions | regarding | procedures, | policies, | written | instructions, | and | other | directions | and | |||||
| inform | workers | of | changes | in | policies | and | procedures. | The | Warehouse | Specialist | Leads | |||
| must | conduct | spot | checks, | and | complete | work | for | compliance | with | the | requirements | on | ||
| work | sequence, | procedures, | methods, | and | deadlines. | The | Warehouse | Specialist | Leads | |||||
| ensure | that | work | is | done | properly | and | efficiently | IAW | the | terms | and | condition | of | the |
| contract. | The | Warehouse | Specialist | Leads | shall | oversee | day‐to‐day | operations | during | the | ||||
| assigned | shift, | determine | the | number | of | PAK | stands | required | to | accomplish | the | daily | picks, | |
| monitor | productivity, | make | general | work | assignments, | and | respond | to | customer | related | ||||
| inquiries. | The | Contractor | shall | ensure | that | a | Warehouse | Specialist | Leads | or | designated | |||
| alternate | leads | are | assigned | to | each | shift | to | include | weekends | when | overtime | is | required | |
| for | customer | support. |
| B. Warehouse | Specialist. | |||||||||||||
| The | Warehouse | Specialists | perform | a | variety | of | warehousing | duties, | which | require | an | |||
| understanding | of | the | WIPCA | and | warehousing | processes | and | procedures. | The | work | ||||
| involves | verifying | materials | against | receiving | documents; | researching | and | correcting | ||||||
| discrepancies; | routing | material | to | the | prescribed | storage | locations; | storing, | stacking, | or | ||||
| palletizing | material | in | accordance | with | (IAW) | prescribed | storage | methods; | selecting | |||||
| material | from | the | ASRS | trays | and | pallets | issuing | to | the | designated | work | center; | manifesting | |
| material | in | the | DSS | as | required; | and, | physically | delivering | and | picking | up | material | at | the |
| work | centers. | The | Warehouse | Specialist | may | be | required | to | operate | Material | Handling | |||
| Equipment | (MHE) | that | includes | a | forklift | (up | to | 6K) | and | a | warehouse | tractor | (4K) | and |
| warehouse | trailers. | Warehouse | Specialists | shall | use | LMP, | DSS, | the | ASRS/HK | Data | Base | |||
| (HKDB), | ESPS, | ETIDS, | and | FEDLOG | in | the | performance | of | the | work | assigned. |
| C. Computer | Operator | III | Lead. | |||||||||||
| The | Contractor | shall | designate | one | Computer | Operator | III | (CO | III) | Lead | for | First | and | Second |
| Shifts | Monday | through | Friday | and | weekends | as | required. | The | CO | III | Leads | are | responsible | |
| for | leading | Employees | who | monitor | and | control | a | computer | by | operating | the | central | ||
| console | or | on‐line | terminals. | The | CO | III | Leads | continuously | observe | the | operation | of | the | |
| console | panel, | storage | devices, | printers, | and | the | action | of | the | console | printer | to | monitor | the |
| system | and | determine | the | point | of | job | steps | to | continue | operations | when | individual | units | of |
| the | system | malfunction. | The | CO | III | Leads | may | also | operate | auxiliary | equipment | directly | ||
| associated | with | the | computer | and | maintain | records | regarding | output | units | and | supply | |||
| inventories. | The | CO | III | Leads | manipulate | controls | to | rearrange | sequence | of | job | steps | to | |
| continue | operations | in | the | event | that | individual | units | of | the | system | malfunction. |
| D. Computer | Operator | III. | ||||||||||||
| The | Computer | Operator | III | (CO | III), | under | general | supervision, | monitors | and | controls | a | ||
| computer | by | operating | the | central | console | or | on‐line | terminals. | The | CO | III | may | operate | |
| auxiliary | equipment | directly | associated | with | the | computer. | The | CO | III | continuously | ||||
| observes | the | operation | of | the | console | panel, | storage | devices, | printers, | and | the | action | of | the |
| console | printer | to | monitor | the | system | and | determines | the | point | of | job | steps | to | continue |
| operations | when | individual | units | of | the | system | malfunction. | The | CO | III | also | assists | in | |
| manipulating | controls | to | rearrange | sequence | of | job | steps | to | continue | operations | when | |||
| individual | units | of | the | system | malfunction. |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
1.3.3 Personnel Qualifications.
A. The Contractor shall implement a continuing recruiting program such that the Contractor
| can | respond | to | urgent | and | phased | surge | and | mobilization | requirements. | Personnel | |||||
| assigned | to | or | utilized | by | the | Contractor | in | the | performance | of | this | contract | shall, | as | a |
| minimum, | meet | the | experience, | educational, | or | other | background | requirements | set | forth | |||||
| below | and | shall | be | fully | capable | of | performing | in | an | efficient, | reliable, | and | professional | ||
| manner. | If | the | KO | questions | the | qualifications | or | competence | of | any | person | performing | |||
| under | the | contract, | the | burden | of | proof | that | the | person | is | qualified | as | prescribed | herein | |
| shall | be | upon | the | Contractor. |
| B. The | Contractor | shall | not | employ | any | person | who | is | not | a | citizen | or | legal | resident | alien | of | the |
| United | States | and | who | does | not | have | the | requisite | security | check | as | set | forth | in | Paragraph | ||
| 1.7.3 | Personnel | Clearance. |
C. The Contractor shall ensure that all Employees (Prime and Sub‐Contract Labor) submit to and pass a controlled substance screening test prior to performing work on this Contract.
D. All Contractor personnel shall demonstrate the following knowledge and skills:
1. The ability to read, write, speak, and proficiently communicate using the English
| language | in | oral | and | written | communications. | ||||||||
| 2. The | ability | to | work | independently | and | well | with | others | in | a | team | environment. | |
| 3. Possess | the | experience | and | proficiency | necessary | to | work | with | the | latest | version | of | MS |
Office Suite necessary to perform the requirements set forth in this PWS.
| E. Contractor | employees | shall | have | the | requirement | training | to | operate | the | ASRS | and | MHE | ||
| equipment. | MHE | operators | shall | be | required | to | obtain | and | maintain | a | valid | operating | ||
| license | for | the | specific | type | of | MHE | (6K | capacity) | operated. | The | Contractor | is | not | authorized |
| to | operate | any | MHE | prior | to | receiving | Contractor‐Furnished | MHE | operation | training | and | |||
| receiving | their | license. |
| F. Contractor | personnel | must | be | proficient | in | reading | and | capable | of | communicating | |||||
| effectively | in | English. | Contractor | personnel | must | be | familiar | with | the | use | of | computer | |||
| operations. | Contractor | personnel | shall | be | capable | of | standing, | bending, | lifting, | and | walking | ||||
| for | the | majority | of | the | day. | Contractor | personnel | shall | be | capable | of | lifting | and | carrying | |
| moderately | heavy | material | (up | to | 60 | lbs.). |
G. Contractor Employees that operate motor vehicles to include, but not limited to, light and
| medium | trucks | and | MHE, | shall | maintain | a | valid | state | driver’s | license | with | all | class | and |
| commodity | endorsements | required | by | Public | Law | 99‐570 | and | state | law | for | the | type | of | |
| vehicle | operated | or | commodity | being | transported. | The | Contractor | shall | be | responsible | for | |||
| obtaining | all | necessary | licenses | and | for | complying | with | all | applicable | Federal, | State, | and | ||
| local | laws. | The | Contractor | shall | maintain | updated | copies | of | any | applicable | licenses | and | ||
| certifications | for | all | Employees | and | make | available | to | the | Government | upon | request. | |||
| Operators | shall | complete | the | daily | operator | checks | at | the | start | and | end | of | each | shift. |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
1.4 Security.
A. The Contractor shall implement and adhere to the CCAD Physical Security Program and
| SOP. | The | Contractor | shall | ensure | the | physical | security | of | all | Government | property, | |||
| accountable | stock, | and | that | any | information | provided | under | this | contract | is | secured | and | ||
| protected | against | theft, | sabotage, | or | other | acts | constituting | illegal | destruction. | In | addition, | |||
| the | Contractor | and | its | personnel | shall | become | familiar | with, | and | comply | with, | all | DoD | and |
| DLA | regulatory | guidance, | including, | but | not | limited | to, | the | following. |
| Publication | Title | ||||||||
| OASD | (HD&GS) | DoD | Antiterrorism | (AT) | Officer | Guide | |||
| DoDI | 2000.12 | DoD | Antiterrorism | (AT) | Program | ||||
| DoDI | O‐2000.16 | DoD | Antiterrorism | (AT) | Program | Implementation, | Volumes | 1‐2 | |
| DoDM | 5200.01 | DoD | Information | Security | Program, | Volumes | 1‐4 | ||
| DoDM | 5200.02 | DoD | Procedures | for | the | DoD | Personnel | Security | Program |
| DoD | 5200.2‐R | DoD | Personnel | Security | Program | ||||
| DoD | 5200.8‐R | DoD | Physical | Security | Program | ||||
| DoD | 5205.02‐M | DoD | Operational | Security | (OPSEC) | Program | Manual | ||
| DoD | 5220.22‐M | National | Industrial | Security | Program | Operating | Manual | (NISPOM) | |
| DoD | 5220.22‐R | Industrial | Security | Regulation | |||||
| DLAM | 5200.08 | Physical | Security | Manual, | Volumes | 1‐2 | |||
| DLAI | 1010.01 | Drug | Free | Workplace | |||||
| DLAI | 4306 | Physical | Security | Program | |||||
| DLAI | 5105 | Reporting | of | Criminal | Incidents | ||||
| DLAI | 5200.01 | Information | Security | (INFOSEC) | Program | ||||
| DLAI | 5205.02 | Operations | Security | (OPSEC) | Program | ||||
| DLAI | 6401 | Information | Assurance | (IA) | Management | Controls | |||
| DLAR | 4145.11 | Safeguarding | of | DLA | Sensitive | Inventory | Items, | Controlled | Substances, |
and Pilferable Items of Supply
| B. The | Contractor | or | any | representative | of | the | Contractor | entering | DoD | locations | to | perform | ||
| contract | requirements | shall | abide | by | all | security | regulations | and | may | be | subject | to | security | |
| inspections | and | background | checks. | Contractor | personnel | and | property | shall | be | subject | to | |||
| search | and | seizure | upon | entering, | while | on, | and | upon | leaving | the | DoD | locations | pursuant | to |
| regulatory | guidance. |
| C. | All | Contractor | personnel | shall | conduct | themselves | IAW | acceptable | business | decorum | at | all | |||||
| times. | The | Contractor | shall | remove | any | individual | from | the | site | whose | continued | presence | |||||
| or | employment | on | this | contract | is | deemed | by | the | KO | or | COR | to | be | contrary | to | the | public |
| interest, | adversely | affect | health, | morale, | welfare, | or | good | order | and | discipline | on | the | |||||
| installation, | or | is | inconsistent | with | the | best | interests | of | national | security. | The | Contractor | |||||
| will | immediately | be | removed | from | the | work | environment, | pending | a | final | decision. | The | KO | ||||
| will | clearly | document | the | reason | for | removal. | When | and | if | such | removal | occurs, | the | ||||
| Contractor | shall | within | three | working | days | assign | qualified | personnel | to | fill | any | ||||||
| vacancy(ies) | thus | created. | IAW | USC | Title | 18, | Crimes | and | Criminal | Procedure, | Part | I, | Crimes, | ||||
| Chapter | 67, | Military | and | Navy, | Section | 1382, | the | Installation | Commander | has | the | authority | |||||
| to | bar | individuals | from | the | host | installation. |
D. In the event of a strike by Contractor personnel, the Contractor shall be responsible for the
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
| cost | of | any | increased | security | as | determined | necessary | by | the | Installation | or | DLA | Site |
| Commander/Director. | Additionally, | the | Contractor | shall | be | responsible | to | continue | |||||
| performance | of | the | contract | requirements | at | no | additional | cost | to | the | Government. |
E. The Contractor shall report any security violations to the KO or COR within one (1) hour of
| discovery. | A | security | violation | is | any | knowing, | willful, | or | negligent | action | that | could | |
| reasonably | be | expected | to | result | in | an | unauthorized | disclosure | of | classified | information; | to | |
| include | a | loss | or | gain | of | classified | material. |
F. The Contractor shall report immediately to the KO or COR any suspected, alleged, or actual criminal incidents IAW DLAI 5105 Reporting of Criminal Incidents.
1.4.1 Personnel Clearance.
| A. The | Homeland | Security | Presidential | Directive | 12 | (HSPD‐12) | dated | 27 | August | 2004 | has | |||||||
| established | criteria | for | Contractors | who | require | a | Common | Access | Card | (CAC) | for | either | ||||||
| physical | access | to | an | installation | or | access | to | Government | information | technology | (IT) | |||||||
| systems. | The | Government | requires | Personnel | Security | Investigations | (PSI) | to | establish | that | ||||||||
| applicants | or | incumbents | either | employed | by | the | Government | or | working | for | the | |||||||
| Government | under | contract | are | suitable | for | the | job | and | are | eligible | for | a | public | trust | or | |||
| sensitive | position. | The | Contractor | shall | request | personnel | clearances | IAW | instructions | |||||||||
| found | in | TE | 1.1, | Contractor | Personnel | Security. | Upon | favorable | review | and | initiation | of | the | |||||
| PSI, | Contractor | personnel | may | be | granted | temporary | access | pending | final | adjudication | of | |||||||
| the | PSI | (see | Contractor | Investigative | Requirements | in | the | Technical | Library). | The | required | |||||||
| investigation | for | contractors | in | a | position | of | trust | requiring | IT | III | access | is | a | T1 | or | |||
| equivalent. | A | T1 | is | the | investigation | completed | on | an | individual | when | the | person | begins | |||||
| employment | under | a | federal | contract. | It | is | not | a | security | clearance. | The | T1 | for | the | IT | III | ||
| access | addresses | the | past | five | years | of | an | employee’s | life. | If | the | employee | is | placed | in | a | ||
| position | with | a | higher | level | of | trust, | a | different | level | of | investigation | will | apply. | The | ||||
| Contractor | shall | follow | the | following | procedures | for | obtaining | a | T1: |
1. Each Contractor employee shall complete a SF 85, Questionnaire for Non‐Sensitive
| Positions, | using | the | Electronic | Questionnaire | for | National | Security | Positions | (e‐QIP) |
| located | on | the | Office | of | Personnel | Management | (OPM) | website, | http://www.opm.gov/e‐ |
qip/.
| 2. The | Contractor | shall | require | electronic | fingerprinting, | if | available, | or | provide | two | ||||||
| fingerprint | cards | (FBI | Form | FD | 258) | to | the | KO | or | COR | who | will | forward | them | to | the |
| DLA | Intelligence | New | Cumberland | Security | Office. |
| 3. The | SF | 85 | and | fingerprint | cards | are | submitted | with | the | Contractor | Investigative |
| Request | (CIR) | annotating | the | appropriate | designation | and | a | DD | Form | 2875 | (see |
| paragraph | C‐1.4.9, | Information | System | Security). |
B. A CIR form annotating the appropriate designation shall be submitted for each contract
| employee. | The | Contractor | shall | possess | the | required | Facility | Clearance | necessary | for | ||
| accessing | classified | information | or | material. | The | Contractor | shall | possess | a | Facility | ||
| Clearance | to | process | its | employees | for | Personnel | Security | Clearances. | Further | information | ||
| for | obtaining | a | Facility | Clearance | is | available | at | the | Defense | Security | Service | website |
http://www.dss.mil/isp/fac_clear/fac_clear_check.html.
C. Not later than 15 calendar days prior to contract full performance start date, the Contractor
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
| shall | provide | the | KO | or | COR | access | rosters | of | all | personnel. | The | roster | shall | include | each | |
| employee’s | full | name, | identification | card | number | (if | assigned), | branch | or | section | (if | |||||
| applicable).. | The | Contractor | shall | update | the | roster | and | provide | to | the | KO | or | COR | NLT | five | |
| (5) | workings | days | prior | to | the | date | of | required | access. | The | Contractor | shall | make | all | ||
| modifications | to | the | rosters | and | provide | an | update | to | the | KO | or | COR | within | 12 | hours | for |
| employees | whose | employment | has | been | terminated | and | for | employees | who | no | longer | |||||
| require | access | to | restricted | or | controlled | access | areas. |
D. The Contractor shall be required to comply with all Host Installation entrance and security
| requirements. | The | installation | will | vet | all | contractors, | including | subcontractor, | for | criminal | ||
| warrants | before | a | contractor | will | be | allowed | to | enter | the | installation | or | garrison. |
E. The Prime Contractor will be required to escort suppliers, vendors, or other one‐time or
| occasional | visitors | to | the | project | site. | Notification | will | be | given | a | minimum | of | 3 | working | |
| days | prior | to | arrival | and | include | the | name | of | the | company, | the | Prime | Contractor | Company | |
| name | responsible | for | the | vendor, | and | the | vendor | representative | if | available. | Security | may | |||
| refuse | entry | without | this | notification. |
F. The Prime Contractor shall ensure that all access control requirements are adhered to per
| the | CCAD | Physical | Security | Plan. | Any | questions | or | concerns | will | be | routed | through | the | COR | |
| to | the | Security | Services | Branch | for | clarification. |
1.4.2 DoD Common Access Card (CAC)/Access Identification Badge (ID Badge).
| A. Every | Contractor | employee | shall | obtain | and | possess | a | DoD | Common | Access | Card | (CAC) | ||||
| and/or | an | Access | ID | Badge, | as | required | by | HSPD‐12 | and | Directed‐Type | Memorandums | |||||
| (DTM) | 08‐003. | Upon | favorable | review | and | initiation | of | the | PSI | to | establish | the | suitability | of | ||
| an | employee | for | the | job | and | the | approval | for | temporary | Information | Technology | (IT) | access | |||
| pending | final | adjudication | of | the | PSI, | the | Contractor | shall | submit | to | the | KO | or | COR | a | request |
| for | the | DoD | CAC, | IAW | TE | 1.2, | CAC | Procedures. |
| B. The | Contractor | shall | safeguard | all | CAC | and/or | ID | Badges. | Contractor | employees | shall | not | ||||
| share | CAC | and/or | ID | Badges. | Each | Contractor | employee | shall | wear | the | ID | Card(s) | ||||
| conspicuously | on | his | or | her | outer | clothing | above | the | waist | at | all | times | while | working | on | the |
| installation. | Personnel | may | be | challenged | and | removed | from | the | work | area | or | denied | ||||
| access | to | the | host | installation | if | the | CAC | and/or | ID | Card(s) | are | not | worn. | The | Contractor | |
| shall | not | display | or | use | any | badge | as | a | means | of | personal | identification | outside | the |
installation.
| C. In | the | event | that | a | Contractor | employee | damages | or | loses | his | or | her | CAC | and/or | ID | Card, | the |
| Contractor | shall | report | the | damaged | CAC | and/or | ID | Badge | within | two | (2) | working | hours | ||||
| after | discovery | to | the | KO | or | COR. | The | Contractor | shall | arrange | for | a | replacement | CAC | |||
| and/or | ID | Card. | The | Contractor | shall | return | all | Government | provided | CAC | and/or | ID | |||||
| Card(s) | to | the | Government | IAW | TE | 1.2 | CAC | Procedures. | Contractor | personnel | failing | to | |||||
| return | their | Government | CAC | and/or | ID | Card | are | subject | to | criminal | charges | under | United | ||||
| States | Code | (USC) | Title | 18, | Chapter | 1, | Section | 499 | and | 701. |
| D. The | Contractor | shall | return | all | government‐furnished | CAC | and | ID | Badges | to | the | KO | or | COR |
| either | within | 12 | hours | of | the | completion | of | the | contract | or | upon | termination | of | an |
| individual’s | employment, | whichever | comes | first. | Contractor | personnel | failing | to | return |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
| their | Government | CAC | or | ID | Badge | are | subject | to | criminal | charges | under | United | States | Code |
| (USC) | Title | 18, | Chapter | 1, | Section | 499 | and | 701. |
| E. The | Contractor | shall | complete | CDRL | A001, | Monthly | Contractor | Employee | Common | Access |
| Card | (CAC) | Report. |
1.4.3 Information Systems Security (INFOSEC).
| A. Upon | favorable | review | and | initiation | of | the | PSI | to | establish | the | suitability | of | an | employee | ||||
| for | the | job | and | the | approval | for | temporary | IT | access | pending | final | adjudication, | but | not | less | |||
| than | fourteen | (14) | working | days | prior | to | the | employee’s | start | date, | the | Contractor | shall | |||||
| request | Information | Technology | (IT) | eligibility | for | an | employee | requiring | access | and | ||||||||
| passwords | to | the | Government | data | systems. | All | positions | involving | computer | activities | ||||||||
| require | a | minimum | IT | III | category | eligibility. | (IT | eligibility | categories | are | defined | in | Section | |||||
| C‐2.1, | General | Definitions.) | The | Contractor | shall | submit | a | CIR | and | a | DD | Form | 2875 | (see | CIR | |||
| and | System | Authorization | Access | Requests | (SAAR) | document | in | Technical | Library) | for | ||||||||
| temporary | IT | III | eligibility, | with | final | IT | III | eligibility | contingent | upon | receiving | a | favorably | |||||
| adjudicated | T1 | (see | paragraph | 1.7.3, | Personnel | Clearance). | If | the | Contractor | requires | a | |||||||
| waiver | for | IT | II | eligibility, | the | Contractor | shall | submit | justification | for | the | eligibility | to | the | ||||
| KO | or | COR. | IT | II | eligibility | is | for | positions | that | involve | a | degree | of | access | other | than | data | |
| entry; | a | minimum | of | one | Contractor | employee | shall | obtain | IT | II | eligibility. | The | Government | |||||
| will | notify | the | Contractor | if | and | when | a | waiver | is | approved. |
| B. All | Contractor | personnel | provided | with | access | to | Government | computers | and | systems | shall | ||||
| observe | IT | security | policies | and | procedures | as | provided | by | the | KO | or | COR. | The | Contractor | |
| shall | notify | the | KO | or | COR | within | 12 | hours | when, | for | reasons | of | personnel | resignation, | |
| reassignment, | termination, | or | completion | of | portions | of | the | contract, | Contractor | personnel | |||||
| no | longer | require | access | to | Government | systems. |
C. The Contractor shall observe all copyright agreements. In the interest of protecting
| Government | systems | from | computer | viruses, | the | Contractor | shall | not | use | public | domain | |||||
| software | nor | shall | Contractor | personnel | download | software | from | public | bulletin | boards | or | |||||
| Internet | websites. | Should | the | introduction | of | a | computer | virus | or | malicious | destruction | of | ||||
| computer | software, | stored | information, | or | hardware | result | from | the | use | of | public | domain | ||||
| software | or | from | software | taken | from | a | public | bulletin | board | or | Internet | website, | the | |||
| Contractor | shall | be | required | to | repair | the | damage | and | incur | all | costs | at | no | expense | to | the |
| Government | and | without | impact | on | delivery | schedules. |
1.4.4 Safeguarding Information.
| A. The | Contractor | shall | not | allow | access | or | disclosure | of | classified | information | or | information | |||||
| regarding | the | operations | of | DLA | to | any | government | agency, | non‐government | agency, | or | ||||||
| individual | unless | specifically | authorized | by | the | KO | or | COR. | The | Contractor | shall | provide | |||||
| documents | and | files | requested | by | such | parties | to | the | KO | or | COR | within | one | (1) | hour | of | |
| receipt | of | the | authorized | request. | All | files | are | the | property | of | the | Government | and | the | |||
| Contractor | shall | turn | all | files | over | to | the | KO | or | COR | at | the | completion | or | termination | of | this |
contract.
| B. The | Contractor | may | be | required | to | access | data | and | information | that | is | proprietary | to | a |
| government | agency | or | contractor | or | that | is | of | such | nature | that | its | dissemination | and | use |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
| other | than | as | specified | in | this | contract | would | be | averse | to | the | interests | of | the | Government |
| or | others. | The | Contractor | and | its | personnel | shall | not | divulge | or | release | data | or | information | |
| developed | or | obtained | under | performance | of | this | contract | except | to | government | personnel | ||||
| who | are | authorized | to | receive | the | information | or | upon | written | approval | of | the | KO | or | COR. |
| The | Contractor | shall | not | use, | disclose, | or | reproduce | proprietary | data | that | bears | a | restrictive | ||
| legend | other | than | as | specified | in | this | contract. |
C. Disclosure of information regarding operations and services of DLA to persons not entitled
| to | receive | it, | or | failure | to | safeguard | any | classified | information | that | may | come | into | the | |
| Contractor’s | control | in | connection | with | work | under | this | contract, | may | subject | the | ||||
| Contractor, | its | agent, | or | its | Employees | to | criminal | liability | under | USC | Title | 18, | Crimes | and | |
| Criminal | Procedure, | Part | I, | Crimes, | Chapter | 37, | Espionage | and | Censorship, | Sections | 793, | ||||
| Gathering, | Transmitting | or | Losing | Defense | Information, | and | Section | 798, | Disclosure | of | |||||
| Classified | Information. | Neither | the | Contractor | nor | its | Employees | shall | disclose | or | cause | to | |||
| be | disseminated | any | information | concerning | the | operations | of | the | activity | which | could | ||||
| result | in, | or | increase | the | likelihood | of, | the | possibility | of | a | breach | of | DLA’s | security | or |
| interrupt | the | continuity | of | DLA’s | operation. |
D. The Contractor shall report any security deviation or Practices Dangerous to Security (PDS),
| to | include | Communications | Security | (COMSEC), | Operations | Security | (OPSEC), | Information | |||||||||
| Security | (INFOSEC), | etc., | to | the | KO | or | COR | within | one | (1) | hour | of | discovery. | PDS | have | the | |
| potential | to | jeopardize | the | security | of | sensitive | information | and | material | if | allowed | to | |||||
| perpetuate. | Examples | include, | but | are | not | limited | to, | any | knowing, | willful, | or | negligent | |||||
| action | that | could | reasonably | be | expected | to | result | in | an | unauthorized | disclosure | of | |||||
| classified | information; | to | include | a | loss | or | gain | of | classified | material; | failing | to | properly | ||||
| dispose | of | sensitive | documents; | leaving | doors | unsecured; | and | allowing | unauthorized | access | |||||||
| to | Security | Areas | such | as | pilferable | and | hazardous | storage. | These | practices, | when | ||||||
| identified, | shall | be | reported | immediately | to | the | KO | or | COR | and | the | Contractor | shall | take | the | ||
| appropriate | action | that | includes, | but | is | not | limited | to, | making | changes | or | providing | training | ||||
| to | ensure | the | security | of | sensitive | information | and | material. |
1.4.5 Facility Security.
| A. The | Contractor | shall | control | access | by | locking | or | unlocking | the | areas | or | facilities | used | by | |
| the | Contractor | in | the | performance | of | the | contract | requirements. | The | Contractor | shall | lock | |||
| all | internal | overhead | doors, | cages, | vaults, | warehouse | doors, | windows, | and | other | areas | for | |||
| reasons | of | internal | security | before | leaving | an | area | unattended | and | prior | to | the | conclusion | of | |
| any | working | day | (see | 1.7.6 | Key | and | Lock | Control). | The | Contractor | shall | lock | all | external | |
| cargo | and | personnel | doors | when | not | in | use. |
| B. The | Contractor | shall | enact | operational | procedures | IAW | DoD | and | DLA | regulatory | guidance | |||
| that | will | control | movement | of | authorized | personnel | into | and | out | of | secure | facilities. | The | |
| Contractor | shall | safeguard | combinations | and | provide | them | to | only | authorized | personnel. | ||||
| The | Contractor | shall | change | combinations | when | any | personnel | having | access | to | the | |||
| combination | are | reassigned, | separated, | or | no | longer | have | a | need | for | this | information, | or | the |
| combinations | have | been | subjected | to | compromise. |
C. Upon request of the KO or COR, the Contractor shall prepare and provide reports to update
| progress | on | all | recommended | corrective | actions | stemming | from | Government | inspections | or |
| assessments | conducted | at | the | site | (i.e. | Security | Program | Review | (SPR), | OPSEC/INFOSEC |
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS inspections, Vulnerability Assessments (VA), DoD and DLA regulations or policies etc.)
1.4.6 Key and Lock Control of Contractor Occupied Facilities.
| A. The | Contractor | shall | establish | and | maintain | a | Key | and | Lock | Control | Program | as | part | of | their | ||
| Physical | Security | SOP, | IAW | DLAM | 5200.08 | DLA | Physical | Security | Manual | and | DLAI | 4306, | |||||
| DLA | Physical | Security | Program. | The | Contractor | shall | safeguard | keys | provided | by | the | ||||||
| Government. | The | Contractor | shall | utilize | the | automated | key | control | system | or | an | ||||||
| equivalent | substitute | as | a | means | of | key | control. | The | Contractor | shall | designate | in | writing | to | |||
| the | KO | or | COR | a | key | custodian | to | manage | the | key | control | program | by | the | start | of | full |
performance.
| B. The | Contractor | shall | develop | and | maintain | a | roster | of | employees | with | key | or | lock | access | |
| requirements | for | key | control | boxes | or | equivalent | system | IAW | DLAM | 5200.08 | DLA | Physical | |||
| Security | Manual. | The | Contractor | shall | provide | the | initial | roster | 30 | days | prior | to | the | start | of |
| full | performance. | The | Contractor | shall | notify | the | KO | or | COR | within | 24 | hours | when | an | |
| employee | no | longer | requires | access | or | is | no | longer | employed | by | the | Contractor. | The | ||
| Contractor | shall | keep | all | keys | within | the | Key | and | Lock | Control | Program | under | continuous | ||
| accountability | at | all | times | and | shall | limit | the | number | of | individuals | authorized | to | draw | keys | |
| to | the | minimum | required | by | security | and | operational | requirements. | The | Contractor | shall | ||||
| not | remove | keys | to | warehouses | and | storage | or | industrial | areas | from | the | work | area | or | issue |
| them | as | personal | possession | keys. |
| C. The | Contractor | shall | not | duplicate | keys | or | allow | their | use | by | unauthorized | Contractor | |||||||||
| personnel. | The | Contractor | shall | report | any | deviation | from | these | rules | or | lost | keys | to | the | KO | ||||||
| or | COR | within | one | (1) | hour | after | discovery | of | occurrence | and | submit | a | detailed | written | |||||||
| report | by | close | of | business | (COB) | the | same | working | day. | If | lost | keys | are | discovered | at | the | |||||
| end | of | the | day | and | it | is | not | possible | to | submit | a | written | report | to | the | KO | or | COR | by | COB | the |
| same | working | day, | the | Contractor | shall | submit | the | report | within | two | (2) | hours | of | the | |||||||
| beginning | of | business | on | the | next | working | day. | The | Contractor | shall | reimburse | the | |||||||||
| Government | for | all | costs | associated | with | replacing | locks | or | re‐keying | required | as | a | result | of | |||||||
| keys | being | duplicated | or | lost. |
| D. The | Government | will | provide | the | Contractor | access | to | key | control | boxes | and | will | maintain |
| the | programming | of | key | control | boxes. | The | Government | will | furnish | Personal | Identification | ||
| Numbers | (PIN) | to | Contractor | employees | for | access | to | key | control | boxes | as | required. | Each |
| Contractor | employee | shall | safeguard | his | or | her | PIN | by | committing | it | to | memory. | Contractor |
| employees | shall | not | share | assigned | PINs. |
1.4.7 Authorized Visitor Control.
| A. Authorized | visitors | on | official | business | related | to | the | contract | shall | obtain | approval | from | ||||||
| the | host | installation | Law | Enforcement | and | Security | Office | and | the | KO | or | COR | for | entrance | to | |||
| the | host | installation. | The | Contractor | shall | submit | a | DLA | Form | 1818, | Visitor | Request | Form, | |||||
| or | equivalent | form | to | the | KO | or | COR | at | least | one | (1) | week | in | advance | for | all | planned | off‐ |
| base | visitors | needing | base | access | and | shall | follow | the | host | installation | policy | for | all | visitors. | ||||
| The | Contractor | shall | develop | specific | procedures | for | identification | (ID) | and | control | of | all | ||||||
| visitors | to | warehousing | and | administrative | areas. |
B. The Contractor shall not allow visits from foreign nationals to the Distribution Center
SP3300‐19‐R‐5004
Attachment J.1 ‐ PWS
| without | the | written | approval | from | the | Host | Installation | Law | Enforcement, | Security | Office, | |||||||||
| and | KO | or | COR. | A | foreign | national | is | defined | as | a | person | who | is | not | a | citizen | or | national | of | |
| the | United | States. | If | approval | is | obtained, | the | Contractor | shall | follow | the | instructions | for | |||||||
| coordinating | the | visit | IAW | DLAI | 4303 | Foreign | Visits | and | Disclosure | Program. |
C. The Contractor’s procedures shall include the following:
| 1. Positive | identification | of | all | visitors | by | means | of | personal | recognition, | visitor | security | |
| badge, | visitor | permit, | or | other | identifying | credentials. | The | Contractor | shall | contact | the | |
| employee, | supervisor, | or | officer | in | charge | to | ascertain | the | validity | of | the | visit. |
| 2. Using | DLA | Form | 584, | Visitor | Register | or | Contractor | equivalent | form | to | provide | a | record | |||
| of | the | identity | of | the | visitor, | the | time | and | the | duration | of | the | visit, | and | other | pertinent |
| control | data. | The | Contractor | may | use | an | automated | system | instead | of | DLA | Form | 584 | |||
| provided | the | system | records, | at | a | minimum, | provide | the | same | data | included | on | DLA | |||
| Form | 584. | The | Contractor | shall | establish | procedures | for | recovering | any | visitor | security | |||||
| badges, | visitor | permits, | or | other | identifying | credentials | at | the | completion | of | the | visit. |
1.4.8 Contact of a Suspicious Nature.
| A. Contractor | personnel | who | have | been | contacted | under | suspicious | circumstances | shall | report | |||||
| that | contact | immediately | to | their | supervisor, | who | shall | report | it | within | two | (2) | hours | to | the |
| KO | or | COR | for | action. | Suspicious | contacts | for | reporting | purposes | are | defined | as: |
1. Contact with an individual (regardless of nationality) that suggests to the Contractor
| employee | that | an | intelligence | gathering | or | terrorist | organization | may | have | targeted | him |
| or | her | for | possible | intelligence | exploitation. |
| 2. A | request | by | anyone | (regardless | of | nationality) | for | illegal | or | unauthorized | access | to |
| classified | or | unclassified | sensitive | information. |
| 3. Contact | with | a | known | or | suspected | intelligence | officer | from | any | country. | ||
| 4. Contact | with | a | foreign | diplomatic | establishment, | whether | in | the | U.S. | or | abroad, | for |
| personal | or | official | reasons. | Certain | Contractor | personnel | in | positions | designated | as | ||||
| “sensitive” | by | the | Government | may | also | be | required | to | inform | their | chain | of | command | |
| in | advance | of | the | nature | and | reason | for | contacting | a | foreign | diplomatic | establishment | or | |
| travel | to | countries | on | the | State | Department | list | whose | interests | may | be | adverse | to | the |
| United | States. |
B. Additionally, Contractor personnel who have information about activities pertaining to
| espionage, | terrorism, | unauthorized | technology | transfer, | sabotage, | sedition, | subversion, | |||
| spying, | treason, | unauthorized | release | of | classified | or | unclassified | controlled | information, | or |
| unauthorized | intrusions | into | automated | information | systems | shall | report | that | information | |
| immediately | to | the | KO | or | COR | for | action. |
1.5 Safety and Occupational Health (SOH).
| A. DLA | Distribution | is | pursuing | recognition | under | the | OSHA | Voluntary | Protection | Program | ||||||
| (VPP). | A | key | element | of | VPP | is | to | ensure | Contractor | employees | are | afforded | the | same | safe |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .