Exhibit_1_-_Contract_Data_Requirements_List_(CDRL).pdf
PDF 4 MB Posted
- Solicitation number
- SP3300-19-Q-5023
- Issued by
-
Defense Logistics Agency Distribution
About this file
Exhibit 1 - Contract Data Requirements List (CDRL)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AWARD_SYNOPSIS.pdf | ||
| Amendment_0003_Attachment_2a_-_Drawing.pdf | ||
| Amendment_0003_Attachment_2b_-_Drawing_(AutoCAD).dwg | DWG drawing | |
| Amendment_0003_Attachment_1_-_Statement_of_Work.pdf | ||
| Site_Visit_Photos.pptm | PPTM file | |
| SP330019Q5023_-_Amendment_0003.pdf | ||
| Building_Diagram_WH3_-_NG.pdf | ||
| Amendment_0003_Attachment_3_-_Schedule_of_Supplies.xlsx | XLSX spreadsheet | |
| SP330019Q5023_-_Amendment_0002.pdf | ||
| SP330019Q5023_-_Amendment_0001.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_2b_-_Drawing_AutoCAD.dwg | DWG drawing | |
| Attachment_2a_-_Drawing.pdf | ||
| Attachment_3_-_Schedule_of_Supplies.xlsx | XLSX spreadsheet | |
| RFQ_SP330019Q5023.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDRV Bldg. 3 Replace Paint Booth
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Installation Schedule
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-S-SAT1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Installation Drawings
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT9
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days after contract award.
** For approval, submit final draft NLT 10 days prior to installation start date.
Reproduction copies shall be in AutoCad Release 2018 and submitted by e-mail.
J7-AB 1 1
DF-FDI 2 2
DDRV-G 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
As-Built Drawings
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-S-30575
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 15 days after installation completion date.
** Approval required prior to final acceptance.
Reproduction copies shall be in AutoCad Release 2018 and submitted by e-mail.
J7-AB 1 1
DF-FDI 2 2
DDRV-G 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Commercial Manual
3. SUBTITLE
Operating Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT3
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion.
**Approval required prior to preliminary testing start date.
J7-AB 1 1
DF-FDI 2 2
DDRV-G 2 2
15. TOTAL 5 5 0
G. PREPARED BY
Timothy D. Flynn
H. DATE
14 Mar 19
I. APPROVED BY
Frank Capuano
J. DATE
14 Mar 19
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 1 of 4 Pages Adobe Professional 7.0
DD FORM 1423 (BACK), AUG 96
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDRV Bldg. 3 Replace Paint Booth.
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Commercial Manual
3. SUBTITLE
Maintenance Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DF-FDI 2 2
DDRV-G 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Technical Representative List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT11
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to commencement of final operating test.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Training Material and Schedules
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion.
J7-AB 1 1
DF-FDI 2 2
DDRV-G 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Power Requirements
3. SUBTITLE
Operating Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-P-SAT-1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days after award of contract.
**Approval required prior to commencement of work.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
G. PREPARED BY
Timothy D. Flynn
H. DATE
14 Mar 19
I. APPROVED BY
Frank Capuano
J. DATE
14 Mar 19
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 2 of 4 Pages Adobe Professional 7.0
DD FORM 1423 (BACK), AUG 96
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDRV Bldg. 3 Replace Paint Booth
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Design Data Calculations
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-2440A
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to start of installation.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Real Property Material Test Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-T-3071B
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation start.
** Approval prior to start of installation.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Fire Prot., Eng Drawings, Assoc. Desc. Data & Calc.
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT-10
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to installation date.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Certificate of Compliance
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT-14
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* At completion of contract.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
G. PREPARED BY
Timothy D. Flynn
H. DATE
14 Mar 19
I. APPROVED BY
Frank Capuano
J. DATE
14 Mar 19
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 3 of 4 Pages Adobe Professional 7.0
DD FORM 1423 (BACK), AUG 96
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDRV Bldg. 3 Replace Paint Booth
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-T-SAT-1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.17
6. REQUIRING OFFICE
DF-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to start of installation.
J7-AB 1 1
DF-FDI 1 1
DDRV-G 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft Final
Reg Repro
16. REMARKS
15. TOTAL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation date.
15. TOTAL
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
* At completion of contract.
15. TOTAL
G. PREPARED BY
Timothy D. Flynn
H. DATE
14 Mar 19
I. APPROVED BY
Frank Capuano
J. DATE
14 Mar 19
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 4 of 4 Pages Adobe Professional 7.0
DD FORM 1423 (BACK), AUG 96
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
.j
DATA ITEM DESCRIPTION
Form Approved
0MB No. 0704-0188
The puorlD re,ur�g owoen ,or thll co11ec:non CM a1rormnon u e1am.-c1 ti n•ag• 1 tv i,ou,a pw raponae, .-.cJIIGlrtf Iha llPIII rot� na :ruct1ona, H111Cr11rta •JRStlftCI a••• aowcea.
ialhering and maintaining tlla data nuded, and completi1111 and re11iewing Iha collection of informelion. S.nd comments rw1ardlnp 1hi1 burd9n .. 11m11a or ..., other -,.e1 of thi5 collection of infonnatlon. lnclucll!!II 1u111ndona for reducing th■ burden, ID 0.par1fflont of Dei\mse, Wahinl!lon Hoedqu.,.,. Servrc:■a, Director... for lnfannatlon Oponttian• and Reporta (OJ04-01111). 121& Jeffiirson Davia Highway, Suit■ 1204. Ar,ngton, VA 22202-4�- Rapa� sllould be-•• 1h■t notwhhstandln11 ■ny oth■r provision of,_, no person 1h8" be 11111,Ject to any •nalty fc.- fairing to cc.-nply wilh • coll■ction of Information if It do■s not dlsptay ■ ""1T■ ntly valid 0MB corrtrol number, PLEASE DO NOT RETIRf YOUR FORM TO THE
ABOVE ......... 1,.
1. TITLE 2, IDENTIFICATION NUMBER
Installation Schedule D1-S-SATl
3. DESCRIPTION/PURPOSE
Contractor planned performance information to assist the Government in timely project planning, and preliminary coordination actions at the installation site.
4. APPROVAL CATE
(YYYYMMDDJ
(JJ/03/25
5. OFFICE OF PRIMARY RESPONSIBILITY (OPAi
DF-FDI
7. APPLICATION/INTERRELATIONSHIP
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
NIA NIA
This data is applicable to all contractor performance/work actions necessary to comply with specificaaons for referenced project and assure program continuity.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
The schedule shall clearly identify the contractor, contractor number, installation site and area{s) where work will be performed.
The schedule shall contain contractor planned dates, days, or time periods for all design, engineering, pmchasing, manufacturing, ship1,>ing, iostalltion, testing, other work, and data submittals as applicable/required for compliance with the applicable specification and completion within the period of performance time specified in the connct.
AOOl
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EG) PREVIOUS EDmoN MAY BE USED. Page l_ of _l_ Pages D■lign■d using Perform l'fa, WHS/01011, Aug 96
DATA ITEM DESCRIPTION
Form Approved
0MB No. 0704-0188 n1■ pw:bllC reportlnQI ti"wtif9" lot ffii• colJ•ctton of •uo,m•11on is estlmat.v lo average l101iours P9' ,.,.,onu., tncluc!WtQ ln. tsMII for ,�.w.na au -ucttans. 1earc1ung •�JStlf)Q GMa sources, gll1hering a,d maintaining Ille data nHdecl, and completing and reviewing Ille colllc:rion of inform■lian. Send cammffll• regardlnp tti1 bwclen attm•• or .. Y olhor 11p■ct of INs cdleclian ot inform■lian, induding 11111111111on■ for reducing lh■ burd■n. 10 O■p•tm■nt of o■t.nla, WHhinalDrl Heedq-• S■MC111, llir■c- for lnforrna1ion o,.r■tians ■nd R111- I0704-0188l, 1.215 Jaffirsori Devil Hlghw'I', Suit,i 1204, Arlln,ton, VA 22202•4302. Re!IPand■ntw lhould be aw■r■ lh■t notwldlslsndlng _,y alher provilfan ot l■w, nc p■r.on shell b■ 111biact IO ■ny p■n■lty for f■lllng to comply with • coll■clion of nformlltion if it doll not dlsj,)■y • currently valid 0MB control number. PLEASE 00 NCJr RETURl'I YOUR FORM TO THE
2. IDENTIFICATION NUMBER
DI-E-SAT9
1.
""Vii
TITLE
ADDIEI&.
Installation Drawings and Associated Lists
3. DESCRIPTION/PURPOSE
Contract drawings are prepared to provide guidance for in the field construction, assembly installation or erection of construction parts. Submission of contract drawings for approval is required to ensure that the completed structure or construction item will meet the requirements of the construction specifications.
4. APPROVAL DATE 5. OFFICE OF PRIMARY RESPONSIBILITY IOPR) 6a. DTIC APPLICABLE 8b. GIDEP APPLICABLE
(YYYYMMDDJ
00/03125 DF·FDI NIA NIA
7. APPLICATIONANTERRELATlt NSHIP This data item is applicable to contracts requiring construction of real property facilities.
8. APPROVAL LIMITATION
N/A
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
1. Contract drawings shall include complete erection layouts, details and installation instructions. Details and layouts shall show dimensions; locations and markings of component parts and related incidental work and procedures to be followed when erecting or constructing the item. If approved, each copy of die drawings will be identified as having received such approval by being so stamped and dated. The contractor shall make any corrections required by the Contracting Officer. One set of drawings will be returned to the contractor. Contract drawings shall be either blue or black line prints on a white background. Blue prints are not acceptable. Drawings shall be prepared in accordance with MIL-STD-100 and MIL-STD-D-1000. Each contract drawing shall be identified with the following information applicable:
System nomenclature Drawing number CI number and location Subcontractor/supplier/manufacturer name
2. Contract drawings shall cover items including, but not limited to, the construction specifications Institute Inc index as required by the contract specifications:
a. General requirements
b. Site work and foundations for pit area
c. Concrete construction
d. Make-up air unit
e. Metals
f. Exhaust fan
g. Roof pentrationsl
h. Doors, windows and glass
i. Finishes ·. S ialties t il:it booth constrUCtion drawings
11. DISTRIBUTION STATEMENT
A002 DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page_ of __ Pages
Deoianed ueing Perform Pro, WHS/DIOfl, Aug 96
Form Approved
0MB No. 0704-()188 rne p�o1,c repon�ng p�toen tor tn.ts co11ect1on ot ,morm�t,on IS tst�ma!ed to ave,eg,e_ 1 ,u �ours SMt!' responte, 1nc1ua1ng tn& 11m_e ,or !•v,•w�ng m�t,utuoo5, seil'tcrung exsstmg aata SOW'�, gathering and ma1nta1n1ng the data needed, and cample!1ng and rev1ew1ng the collection of 1nforma1ion. Send comments regard1n11 thts burden esumate o, any other aspect of !his colleclion of information, including suggestions for reducing the burden, to Department of Dafanse, Washington Headquarters Sarvtces, Directorate for lnfotmation Operaliona and Reports 10704-0lBBJ, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any c1her prevision cf law, no person ahall be subject to eny penelty for failing to comply with a collection of information if ii doas not display a cwrently va!ld 0MB control number. PLEASE DO NOT Rl:l\.lRN YOUR FORM TO THE
ABOVE ADDRESS,
2. IDENTIFICATION NUMBER1. TITLE
Installation Drawin�s and Associated Lists (continued)
3. DESCRIPTION/PURPOSE
See Page 1
4. APPROVAL DATE
{YYYYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
7. APPLICATION/INTERRELATIONSHIP
8. APPROVAL LIMITATION
10. PREPARATION INSTRUCTIONS
k. Equipment
1. Furnishing
m. Special construction
n. Conveying systems
o. Mechanical
p. Electrical
q. Related incidental work
11, DISTRIBUTION STATEMENT
A002
DD FORM 1664, AUG 96 (EG)
9a. APPLICABLE FORMS
PREVIOUS EDITION MAY BE USED.
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
9b. AMSC NUMBER
Page_ of __ Pages Daslgned using Perform Pto, WHS/OIOR, Aug 96
'i I
-1 I
. I
.J I j
DATA ITEM DESCRIPTION
Form Approved
0MB No. 0704-0188
Tne puom� repon109 outd•n ror in11 co11ect1on o, an•orm1t1-,n 1s nt1m1t•d to average 11u nours per nsponse, 1nc1uding lhG t,me rcir re,,11ew,ng 10:-.trucc,on;, Ho1,�n1n9 ••11t1n9 a-lta 11ci�rct1, galherlng and mllfntlining th• data nnclld, and complma a,d nmewing th• collection of lnfarma1ion. S.ncl commema regarding lhie burden el'dmata ot any othlr apect of 1h11 coll,cdon of lnfonnalion includillg sullllQtlons for raducing th■ bwdlln, to Depstment of Dlf..,., Washington Hudquarws Servicea, Dlrac:torate for Information Oparations and Reports (0704-01881, iz111 Jeffilrson-Davis Hi�way. Suite 1204, Arlinl{ton, VA 22202-4302. Raponclerrts lfiould be aw .. that notwilhstandlng_ ��r.!!ther provision of law, no J!.l!!SOn shal be sub_jec:t to any penaltv fa, failing to comply with a collec1fon of information ii it don not display a currently vatHI OMS control number, PLEAIE DO NOT RETURN YOUR FOIW TO THE
A&OVE AODIE&S,
1. TITLE 2. IDENTIFICATION NUMBER
As Built Drawings DI-S-3057S
3. DESCRIPTION,Pl.lRPOSE To provide up-to-date cooskuction drawings indicating the current status of real property facilities (archtectural, mechanical and electrical)
. 4. APPROVAL DATE 6. OFFICE OF PRIMARY RESPONSIBILITY JOPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
(YYYYMMOOJ
09/03/2S DF-FDI NIA NIA
7. APPLICATIONnNTERRELATI )NSHIP As built drawings are used as part of the DLA permanent real property records, for maintenance, operation and modification activities.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
1. The as-built drawings shall accurately reflect the "As-Installed", "As-Erected" and/or "As-Built" condition of all installed, erected and/or constructed real property facilities. Regardless of whether the as-built drawings are originals or reproducibles the title "as-built" shall be clearly marked above the title block, and the words "Final Revision" shall be inserted in the title block.
2. Reproducibles shall be prepared in accordance with MIL-D-5480 .
3. The As-Built drawings shall be signed and sealed by a person registered as an engineer in a state or possession of the United States.
11. DISTRIBUTION STATEMENT
A003
DD FORM 1664, AUG 96 (EGI PREVIOUS EDITION MAY BE USED. Page _ of __ Pages Designed using Parfarm Pro, WHSIOIOR. Aug 88
. 0MB No. 0704-0188
1na puDuc r•�on1no'iura,n tot· tms. c:011Kac11 ot 1nfotma11on rs e${im.11•d to av•••G• 110 r10ur1 per rnponse, mc.,...-u1ng tna tm& for revtewmg 1Mu.ac.uons. Rillti:mng •••tt1IIF'IV a::na •vv•1,,..,., gat,aring and maintaining Iha dlllll Medod, and completing and reviewing Iha c:ol!IICtion of Information. Slnd commema regarding 1111s burden u1ima18 or any other upec1 Ill 1hia c:allaction of lnformallon, Including suag111ions for raducing 1he burden, Ill Department of �e. Washington H1adqua1Bra &ervlcea, Dinlctorm for lnformetlon Operations and Rapart1 10704-01881, 121 & Jefferson DIIVis Highway, Suite 1204, Arington, VA 22202-4302. Responden1S should ba swwe !hat notwith111nding any other provllion of l■w, no per■on 1h11 be !�� to�,e:,n■lly for failing to comply with a colection of information if it does not di1pll\l I currendy v■lld OMS comrol number. PLEASE DO NOT RETURN YOUR FORM TO THE
1. TITLE 2. IDENTIFICATION NUMBER
Commercial Manual
3. DESCRIPTION/PURPOSE
A commercial manual contains technical information of the assembly, installation, operation, �. and maintenance of commercial equipment. This type of manual is published by the manufacturer and furnished to the purchaser umwly at no cost.
4. APPROVAL DATE
fYYYYMMDDJ
6. OFFICE OF PRIMARY RESPONSIBILITY (OPRI
DF-FDI
7. APPUCATIONJINTERRELATll)NSHIP
Ba. DTIC APPLICABLE Sb. GIDEP APPLICABLE
NIA NIA
1. This data item is invoked when it bas been determined that the manufacturer's manual is acceptable, as published or with minor changes, for Government use.
2. This data item updates content and format of previous edition.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FOR�S
NIA
1. The manual shall contain all information and data nonnally supplied w�th the hardware items.
2. The manual may be supplemented with existing data to comply with the contract.
9b. AMSC NUMBER
NIA
3. The manual and supplements shall be legible and on paper of sufficient quality for long term use.
4. Manuals to be furnished must include sufficient information to satisfy all technical segments indicated in the "Description/Purpose" of Block 3 and the following additional information.
a. The manual shall contain an index of the contents, section, markers or dividers where appropriate, and each manual shall be affixed or placed in a protective cover or binder or durable material, so as to provide a reasonable life under normal handling conditions. Minimum identification marking requirements for the manual cover or binder.
b. The Operation or Operator's Manual/Section shall in,clude in detail all.actions required to activate, dir8Ct, operate and control the installed system/equipment. All aspects of material flow, .push button station(s), console operation, other pertinent functions and visual aids to the extent necessary for clarity, shall be included.
c. The Parts and Maintenance Manual/Section shall contain the part name and identification, such as stock numbers, quantity required, sources of supply, and whether parts are manufactured by the contractor and/or sub-contractors, or are standard co�nents purchased from other manufacturers identified in the data. Additionally, a separate list identifyiq s�rt items and applicable quantities which are recommended by the contractor for maintenance of the end item for a one year penod shall be included.
A004&AOOS
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EGJ
( continued)
PREVIOUS EDmON MAY BE USED. Page 1_ of _2_ Pages DesiQned using l'llrform Pro, WHS/DIOR, Aug 88 j i
I i
·j
·:1
I l
I
-l
DATA ITEM DESCRIPTION
Form Approved
0MB No. 0104·0188
,,. p1.,u11c rttport.nQI t1urde11 ,., tfiit coll•c11on at mfo,meho,, IS Kt.m•ted to aver•u• l \v_111K11s par respon■e, StelVP"IQ tne ttme Tot reviewana ,n,,._ .. on,, MM«;mna exIstIna: �•1• 1ources, 1111hering and maintaining the data nNcled, and completing and reviewing 1he callec1ion of lnfornia11on, Send comment• N11ei!!i1111 lhls burden atim■te or any olher •pect of thi1 c:alec1ion of Information, induding sugges1ions for raducing 1he burden, to Dep•-t of Dmn•, Wlllhington Headqu1rter1 Si,vic:n. Diractorate for lnformallon Opntlone end lleportl C0704-0188J, 12111 .Jeff11son Dallis Highway, Sua 1204, A!lin9.tan, VA 22202-4302. Re1pondan11111\ould be aware that no1Wilhatandlng anv other provision of law, no per1on 1h11 be -,h;.ct lo any penally for failing lo comply with a collec1ion of information if it doe, nol dilpCay a curren11y vlld 0MB con1rCJI numbar. PLEASE DO NOT RETURN YOUR FORM TO THE aM°ui: ar,nliESS,
1. TITLE 2. IDENTIFICATION NUMBER
Commercial Manual (continued)
3. DESCRIPTION/PURPOSE
See Page 1
4. APPROVAL DATE
(YYYYMMDD)
6. OFRCE OF PRIMARY RESPONSIBILITY (OPR)
DF-FDI
7. APPLICATION/INTERRELATIONSHIP
8, APPROVAL LIMITATION Sa. APPLICABLE FORMS
10. PREPARATION INSTRUCTIONS
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
9b. AMSC NUMBER
d. The maintenance manual shall contain a recommended maintenance program. The program shall include the plans and procedures necessary for the management, accomplishment and quality control of both prevenlive and corrective maintenance, so as to maintain the equipment in a serviceable condition or to restore it to an operable condition once it has failed. The program shall include the requirements for servicing, repair, lubrication, inspection, corrosion control, testing, calibration, overhaul, support equipment, special tools, the number of maintenance personnel and their required skills, and the maintenance work area (including any special physical characteristics and environment). The maintenance manual shall contain a "Trouble-shooting Guide" which lists malfunctions most likely to occur and a detailed step-by-step procedure for locating and correcting each listed malfunction. Lubricants instructions, including identification of recommended lubricants and instructions regarding periodic adjustments, safety features and requirements shall be included.
e. A list of contractor technical representatives shall be provided incl� the prime contractor, contract number, the installation site, a primary and an alternate source, names of designated individuals, the supplier's (firm name and address if other than the contractor's) phone numbers where the individual representatives can be contacted. This list shall be included as a part of the Mamtenance Manual. If multiple sources apply due to various subsystems or equipment items required by the contract specification, the list shall clearly identify the specific subsystem or equipnent item to the responsible technical representative. The Government will use this list for notification to provide technical assistance or maintenance service within the time limit(s) specified in the contract for consultation and performance as necessary to eliminate, C01'1'8Ct, or repair any system/equipment malfunction or failure.
5. The manual shall be updated to include any equipment, part number, or material modifications/changes made during the warranty period by the contractor.
A004&A005
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EG)
u!
PREVIOUS EDITION MAY BE USED. Page L of _l_ Pages D11ignad l.lling Perform Pro. WHS/01011. Aug 98 j
Form Approved
0MB No. 0704-0188
The pUDIC ,eparung DW'U911 ,or Vlll COlleG'IIOII ut tnrarm.i.., 1$ ••1111,il'id 10 .... I ,lfliovrs par , .. POn .. , ;:"',=:e ... Clll'lg u".; tffNt '°' raVleWWlg lnSUUCUOftl, .. � 9Jlllbng Q .. souro.s, galh9rlna .,111 mmtiinlng lhe data nNded, .. d """""t.11111 and ""'iewlng th• calllCtion ltlll lnformn11n. Send "- r■garding this burdan estirlate or aw 11th• ...,..,t al 1his collection of inform■lion. lncludir,g 111gge1tlone for ,.cb;lr,g the burden. to Dllpmlment of DefenN, W•hlngton Htladqu-rs Servlca, Dl111Ctor1t1 for lnform■don Op,r,it;ona end Reports (0704-01881, 1216 Jllff■r1on Davi■ Highway, Sulie 1204, Arlington, VA 22202-4302, Rapon'"""" 1h11111d be aw•11hat notwlthalandlng 1ny other provi■lon of•-• no parson shllll be subjllc:t to any penally for failing to comply with • collection of lnfarmation if h doe, not dlaplay • currently valld 0MB control number. PLEASE 00 NOT RETURN YOUR FORIII TO llfE
AMUS: ADDRESS.
1. TITLE 2. IDENTIFICATION NUMBER
Technical Reoresentative List DI-E-SATll
3. OESCRIPTIONJPURPOSE
The purpose of this data item is to ensure that the Government has availability of technical representative service/suppon.
4. APPROVAL DATE 5. OFFICE OF PRIMARY RESPONSIBILITY (OPRJ 6a. DTIC APPLICABLE 6b. GIOEP APPLICABLE fYYYYMMDDJ
QIJ/03/25 DF-FDI NIA NIA
7. APPLICATION/INTERRELATIONSHIP
This Data Item Description should be applied to conlracts where the Government requires Contractor technical representative services and support of Contractor furnished equipment/systems for an extended penod after final acceptance.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
Unless otherwise specified, the Data item shall be in the Contractor/Supplier's standard format and shall contain:
Business Firm/Individual Consultant Name Mailing Address Telephone Number
A006
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EG) PREVIOUS EomoN MAY BE USED. Page 1_ or _1_ Pagea 011lgned iqlng P1rfonn l'NI, WHSIOIOR, Aug 98
0MB No. 0704-0188
1ne I"!"''"' r•:roning buraen !or 1IU c01iM:110n 01 w,1orm1111on 1& eo�m•lff to werea• 11u t,wrs per rsspon••• __,,,.,II u• ume ,or reYleWWII 11aw--••• -M- _, aa1e -•• gathemg en maintalrw,g 1h11 dete IINded, .,d completing -,d rlllriewklg the colleotion of infarmlllion. Send cc,- reg•ding thia bwden -1imlllll or any other aspect of this collec1ion of lntarmalian, including su11gettlona for reducing 1he burden, to Departmllll of Defante, WNhinaton HNdquartert Servloea, Dfrwctarllle far Information Op•etilWlt 111d Alpa,ts 10704-0188), 12Hi Jeffinon Davit Highway, Sutt. 1204, Allington. VA 22202-4302. Respond- tfiould be -•re that notwltht1anding .,Y.�1her provilion � law, no penon shall be subjeci to any penalty tor falllng to comply wilh e collKtlon cf Information if it does not display a curently valid 0MB control numbar. PI.EAIII; DO NOT RETURN YOUR FORM TO THE a■nvs: •nmiESS.
1. TITLE 2. IDENTIFICATION NUMBER
Trainin2 Manual DI-E-SAT
3. DESCRIPTION/PURPOSE
This data consists of graphs, mathematical curves, analysis tables, drawings, and empirical data which reflects quantatively and qualitatively the operating and maintenance requirements of the furnished equipment/system. The purpose of this data is to enable the Government to verify the personnel requirements of the items being furnished.
4. APPROVAL DATE 5. OFFICE OF PRIMARY RESPONSIBILITY (OPRI
(YYYYMMDDJ
09/03/25 DF-IDI
7. APPLICATIONnNTERRELA TIONSHIP
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
NIA NIA
This Data Item Description is to be applied to contracts when the Government requires evaluation of the Training requirements of the items/systems fumiBhed wider the contract.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRJCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
1. Unless otherwise specified, the data item shall be in the contractor/supplier's standard format, and shall provide complete narrative, graphs, mathematical curves, analysis, table, drawings, and empirical data required to evaluate the items as specified in the contract.
2. Unless otherwise indicated by revision and date, the documents cited herein, of the i� in effect on date of invitation for bid or request for proposals, form a part of this DID to the extent specified herein.
A007
11. DISTRIBUTION STATEMENT
OD FORM 1664, AUG 96 (EGJ PREVIOUS EDITION MAY BE USED. Page_ of __ Pages 0.19Md wing Perform Pro, WHS/DIOA. Aug 98
·j
Form Approved
0MB No. 0704-0188
,.,. ,~.u••• rap""'ng DlUHn ,or 1n11 co11ec11on ol 1n1onrM1uon 11 es11m11aa 10 a-ea• nu ,_,. par ra1pans1, 1nciuair111 tna 1111_e ,or rav,-1ng m1 n1ct1or11, _...,,.., ••� u■ .. 1ourt81, gathering and melntatnlng 111• dell nNded, end completlna and N11iewi1111 the collaction ol information. Sand comm1nt1 regerdnp 1his burdan estinat■ or any other alpllGt or 1h11 collac:fon of lnfonna1ion, lnellldlng sv1191ltionl to, reduca,g the Durdan, to Oap-am ol o.t.nse, Washington Haadq-,.,, Sannt111, Oirec1of■ta for Information OperelioN 111d Reports 10704-0188), 1215 JeflW11on Oavi1 .. 9"w■y, Suite 1204, Arlington, VA 22202-4302. RalpOnCMnlS sfiould ti. awwe that notwhhst1nclln_11� o1har provlllon of llw, no �on 1heR be eublect ta any panalty for falling to comply with a collacdon of Information if it da. not dilplly I cummtly 111licl 0MB control numbar. Pl.EASE DO NOTAETUANYOUAFORM TO THE ABOVE anrm""'"
1. TITLE 2, IDENTIFICATION NUMBER
Power R.eQuirements DI-P-SATl
3. DESCRIPTION/PURPOSE
This item provides a comprehensive list of power requirements for all equipment to be fumished and installed by the contractor.
4, APPROVAL DATE 6. OFFICE OF PBIMARY RESPONSIBILITY (QPR)
(YYYYMMDDJ
09103125 DF-FDI
7. APPLICATIONnNTERRELA TIONSHIP
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
NIA NIA
This Data Item Description is to be applied to contracts when the Government requires evaluation of power requirements to determine if sufficient power is available.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
1. Unless otherwise specified, the data item shall be in the contractor's/supplier's standard format.
2. Power requirements shall be listed by total for each warehouse section in addition to each piece of equipment furnished.
A008
1 1. DISTRIBUTION STATEMENT
uu FORM 1664, AUG 96 (EGJ PREVIOUS EDITION MAY BE useo. Page _ of __ Pagas Designed using Parform Pro, WHS/DlDR, Aug 88
·1
DAT A ITEM DESCRIPTION
Form Approved
OMS No. 0704-0188
, n• p111>11c •'"!""•!"II ,auraen ror 11111 _,ec_nan of inlorm■uon is e11ma1_H 10 -•a■ T 1u nours pu rapona, 111C1uam11 -..e ..,.. ,or revllWfflg .,uuc11ons, Nlrcna,11 ■x1nm11 ,� ... 1ource1, 11a!herin11 ana mlllntanlng 1hl «™I needlld, 111d complelin11 and reviewing Iha collacUon of information. Send comments ra111rdlng thla burdan as1imata or •w ottw 11jMct or this colllClian cl Information, Including 1u-11Gn1 fer raducing th■ butdan, to Oep1ranant of o.fMN, W11hin11tari He1dqu1rt1rs Servic:M, Diractorm tor Jnformtelan OpartCI- and Rop«u 10704-0111), 12111 Mf•11«1Davll Highway, SUita 1204, Arllngtan, YA 22202-4302. Rupandllnts should be aw-■ that notwilhahnclnli any olher ;cwlaian of law, no'""°" lhal! be �J'vi !:'-":'.::illlty fer f•a to comply with • colhlc:11on of lnforrnetlon if it doas not display • currently vllid 01\11B control number. LEASE DO OT RETURN YOUR ORM TO THE
1. TITLE 2. IDENTIFICATION NUMBER
Design Data and Calculations DI-E-2440A
3. DESCRIPTION/PURPOSE
This data consists of graphs, mathematical curves, analysis tables and empirical data which reflects quantatively the design/capabilities of the items to be furnished. The purpose of this data is to enable the Government to verify that the item being furnished and represented by this data is in accordance with the requirements of the contract.
4. APPROVAL DATE 5. OFACE .OF PRIMARY RESPONSIBILITY IOPRI
(YYYYMMDDJ
09/03/23 DF-FDI
7. APPLICATIONnNTERRELA TIONSHIP
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
NIA NIA
This Data Item Description is to be applied to contracts when the Govemment requires evaluation of the design capabilities of the items furnished under the contract.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
1. Unless otherwise spec itied, the data item shall be in the contractor/supplier's analysis, tables and empirical data required to evaluate the items as specified in the contract.
2. Unless otherwise indicated by revision and date, the documents cited herein, of the issue in effect on date of invitation for bid or request for proposals, form a part of this DID to the extent specified herein.
3. Design data and calculations shall be signed and sealed by a person registered as an engineer in a state or possession of the United States.
11. DISTRIBUTION STATEMENT
A009
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page _of__ Pages Designed ullng P.,rform Pro, WHSIDIOR, Aug 9B
Farm Apprav«J
0MB No. 0704-0tBB rna pun-.: ,.:ro;..ng oura1n ,ar ,._ ca-.. on o, 1n1annnon 11 HfllTIBI.., to'""""" 11u no,., per l'flllOnM, ,n._,ng""" ame ,or -wma '""""""-• .. ,rcNng OISllntl oete .-011, gathering en maintaining lhe data nHdad, •nd eompletina end l'ftiewina th• coHaction of intorm1tion, Send commenta qgerdina this burden et1im.te or 1nv othe, aspect ot 1h11 COIIICtion ol infarmation. including auggestiOIIS for reducing the burden, to Dep.iment of Defen11, W81hington Headclu-11 Servlcel, Directorm for Information Operation, a,d Rep (0704-0188), 1215 Jeffemn Dwis Highway, Suite 1204, Arlington, VA 22202--4302. RHpondents should be aware that notwi1h1tandina eny other provilion of law, no peraon 1hd ba �� � .. ��,."•hv fOf faiing to comply with ■ collection of infarmation if it do■s not di1Pl■Y a currantly valid 0MB conlrOI number. PLEASE DO NOT RETURN YOUR FORM TO THE
1. TITLE 2. IDENTIFICATION NUMBER
Real Prooerty Materials Test Reoorts DI-T-30718
3. DESCRIPTION/PURPOSE
To provide test reports resulting from testing of constrnction materials as specified in the Contract.
4. APPROVAL DATE 6. OFFICE OF PRIMARY RESPONSIBILITY (QPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
(YYYYMMDDJ
09/03/25 DF-FDI NIA NIA
7. APPLICATION/INTERRELATIONSHIP
This Data Item is applicable to real property facility constrnction under which tests of constrnction materials are required.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
9b. AMSC NUMBER
NIA
1. Test reports specified in the construction job specifications shall be submitted in the format of the organization doing the testing and may be copies of such test reports.
2. Test reports shall be provided for all tests required by the specifications including but not limited to tests on:
a. Concrete d. Pavement g. Welding
b. Soil e. Brick
c. Compacted fill f. Masonry units
3. Test report requirements may be satisfied by submittal of the names of manufacturers and certificates of compliance with or guarantees and warranties of tests conducted at manufacturers plants. or by recognized U.S. testing laboratories. e.g., U.L .• on materials including but not limited to:
• SEE ATTACHED PAGE.
4. Where specific tests are sp1Cified, the specifications shall govern.
S. All docmnents shall bear the system contract identification.
AOIO (continued)
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EGJ PREVIOUS EDITION MAY BE USED. Page_of __ Pages De■igned uaing PerfOfffl Pro, WHS/DIOR, Aug 118
.l f I
·j
.I i .j
DATA ITEM DESCRIPTION
Form Approved
0MB No. 07()4.()t 88
HJ& punuc reporting owuen for ·tn1s co11■CUDJ1 o, m,orm,tton ts tnt11matei:1 to average 11u nours per rea:ponu, lflgyglng 1r.e time ror rev1ew1ng 1nctruct1ons, ae1ror11ng e,ust1na "'"'M;I sourGe1, ga1herfnO and maintaining the data needed, and completing and raviawlng 1he collection of information. Sand comments regardinp this burden estimate or any other aspec;t of this colloclion of Information, including suggestions for reduc;ing the burden, to Department of Defense, w .. hington Headquatters Sen,,ces, Direotorate for Information Opera1ion1 and Rsparta {0704-01881, 1215 Jeffer,on Davia Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be awwa that notwithstanding any other provision of law, no person shaH be subject to any penalty for failing to c;omply with a collection of information If It does not display • currently v1lid 0MB control number. Pl.EASE DO NOT RETURN YOUR FORM TO THE
ABOVE ADDRESS
1. TITLE 2. IDENTIFICATION NUMBER
Real Propertv Materials Test Reports ( continued)
3. DESCRIPTION/PURPOSE
See Pate 1 p
4. APPROVAL DATE
(YYYYMMDDJ
6. OFFICE OF PRIMARY RESPONSIBILITY (OPRI
7, APPLICATION/INTERRELATIONSHIP
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS
10. PREPARATION INSTRUCTIONS
3. { continued)
a. Asbestos-cement pipe, concrete pipe, clay pipe
b. Metal coatings
c. Portland cement
d. Concrete aggregate
e. Asphalt products
f. Reinforcing and structural steel
g. Expansion joint material
h. Welders qualification tests
i. Paints, preservatives and sealants
j. Hardware
k. Adhesives
1. Lumber and wood products
m. Roofing materials
n. Insulation
o. Plastics
p. Rubber products
q. Floor materials and finishes
r. Metal partitions
s. Accessories
t. Plumbing materials
u. Electrical materials
v. Heating, air conditioning and refrigeration materials
AOlO
11. DISTRIBUTION STATEMENT
DD FORM 1664. AUG 96 (EG) PREVIOUS EDITION MAY BE USED.
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
9b. AMSC NUMBER
Page_of __ Pages Designed using Perform Pro, WHS/DIOR, Aug 96
'i ·1
DATA ITEM DESCRIPTION
Farm Approved
0MB No. 0704-0188
1. TITLE 2. IDENTIFICATION NUMBER
Real Property Facilities - Fire Protection, Eng. Drawings, Associated Descriptive Data and Cale. D1-E-SATI0
3. DESCRIPTION/PURPOSE
Con.tract drawings are prepared to provide guidance for field construction, assembly installation or erection of tire protection systems parts. Submission of contract drawings associated descriptive data and calculations is required to ensure that the completed fire protection system will meet the requirements of the contract specifications and the fire protection authority having jurisdiction.
4. APPROVAL DATE
(YYYYMMDDJ
@/03/25
5. OFFICE OF PRIMARY RESPONSIBILITY COPA)
DF-FDI
7. APPLICATION/INTERRELATIONSHIP
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
NIA NIA
This data item is applicable to contracts requiring constrUction of real property facilities fire protection systems.
8. APPROVAL LIMITATION
NIA
10. PREPARATION INSTRUCTIONS
9a. APPLICABLE FORMS
NIA
1. Descriptive literature for all items of equipment and material offered.
9b. AMSC NUMBER
NIA
2. Fire 1;>rotection engineering drawings, associated descriptive data, and calculation for review and obtain approval from the Contracting Officer and the COR prior to commencing the sprinkJer work. The fire protection engineering drawings, associated descriptive data and calculations shall be prepared and sealed by a registered fire protection engineer who has at least four years of current experience in the design of fire protection and detection systems. Partial submittals will not be acceptable. The contractor shall annotate descriptive data to show the specific model, type, and size of each item proposed. Prepare working drawings in accordance with the requirements for "working drawi� (Plans)" as specified in NFPA 13 and MIL-STD-1000. Contract drawings shall be either blue or black line prints on white background.
A. Manufacturer's Data:
1. Pipe, fittings, and mechanical couplings
2. Alarm valves
3. Valves including gate check and globe
4. Sprin}der heads
5. Pipe hangers and supports
6. Pressure switch
7. Valve tamper switch
A0ll (continued)
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page _ of __ Pages Designed using Perform Pro, WH&/DIOR, Aug 98
I., DATA ITEM DESCRIPTION
Form Approved
0MB No. 0704-0188
Iha pUbllC r1or11ng ouraen ror mis coneetlon 01 1n,orma11on IS asumatao to average 11u nou,s pe, response, ,,......,.,g U\8 tvTIO ,o, r8VIOW1nG mmucllons, sa� ex,sung <late sources, gatharing an maintaining the date needed, and completin'l,and reviewing the collee1ion of inform■tion. Send comments regardinp this burden es1imate o, any other esptct of this collection of information, lnclucfmg suggestions for raducing the urden, to Depanment of Defense, W1shin111on Headquartefa Sorv,ces, Directo,eto for lnfom,ation Operations and Reports (0704-01881, 1216 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other �••vision of law, no person shall be �':!� :Or;'/��Y for failing to comply with a collection of information if it does not display e cunentiy valid 0MB control number. PLEASE DO OT RETURN YOUR FORM TO THE
1. TITLE 2. IDENTIFICATION NUMBER
Real Property Facilities - Fire Protection, Eng. Drawings, Associated Descriotive Data and Cale. (continued)
3. DESCRIPTION/PURPOSE
See Page 1
4. APPROVAL DATE
(YYYYMMDDJ
5. OFFICE OF PRIMARY RESPONSIBILITY (OPRI
7. APPLICATION/INTERRELATIONSHIP
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS
10. PREPARATION INSTRUCTIONS
B. Shop Drawings:
1. Sprinkler heads and piping system layout
2. System calculations
3. Alarm and supervisory system layout
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
9b. AMSC NUMBER
4. Wiring diagrams showing points of connection, terminals and color codes used for all electrical connections in the system.
C. Certificates of Compliance:
1. Contractor's material and test certificate
2. Pipe and fittings
D. Operation and Maintenance Manuals:
1. Alarm valves
2. Supervisory and alarm system
3. Working drawings: (Construction, electrical, mechanical), associated descriptive data, and calculations for review and obtain approval of the contracting office prior to commencing construction work.
A. Manufacturer's Data B. Shop Drawings C. Certificates of Compliance D. Operation and Maintenance manuals: Six bound of complete instruction for the operation and maintenance of the system, including circuit drawings and wiring diagrams.
4. As-built (Record) Working Drawings: A complete set of drawings; associated descriptive data, calculations and measured performance parameters of each installed system after completion, but before final acceptance of the work for record purposes.
Drawings shall not be smaller than 30 inches by 42 inches.
AOll
11. DISTRIBUTION STATEMENT
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page_ of __ Pages Docigned using Perform Pro, WHS/DIOR, Aug 98
.i j •I
DATA ITEM DESCRIPTION
Form Approved
0MB No. 0704-0188
The pubac ,.:rorting liiinlWI Tor 1h11 c:ollection of 1ntormal"ion • ll5llffllllecl fo -- llu nour1 par rNponse, -.,, '"• time ror NMAWlllll N rucaons, -111n11 --'II••••--• ga1hllfing an maintaining Iha da1a rweded, w,d CGmpla1tna w,d reviewing tha collaclion of information. Sand c:orn,.._,, r•g•dinp this burden as1inata or any 01her aspac:t of this c:ollac!ion of information, includi!!a sugganons for reducing the burden, to 1>9plF1ment of Def9nH, Wahinaton H•dqu.1111 Smricu, Directorate for lnlormadon Clparnons and Ael!Orll 10704-01881, 12111 Jeffarcon Dam Hi�ay. Suite 1204, �ton. VA 22202--4302. Aupondenlll aliould ba aw•• 1hlll notwi1hstancing any other provision of law,"° person shall ba aub)IICt to any penalty for failing to comply with a collec:tlon of information it It does not diaplay a currantly va�d 0MB control number, Pl.EASE DO NOT AETUIIN YOUR FORM TO THE A80VE IIDDAei&.
1. TITLE 2. IDENTIFICATION NUMBER
Certificate of Compliance DI-E-SAT14
3. DESCRIPTION/PURPOSE
This document is to provide certification that all contractual requirements have been met by the contractor.