ATTACHMENT_4_TO_RFQ_SP3300-19-Q-0060.pdf
PDF 626 KB Posted
- Solicitation number
- SP3300-19-Q-0060
- Issued by
-
Defense Logistics Agency Distribution
About this file
PM Task List for Station Air Compressor
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quarterly Annual
COMPRESSOR
Operation X
Instrument Panel Lights/Gauges/ Control Buttons X Hour Meter (Actual Total Hours) X
SERVICE ITEMS
OIL TYPE: X
OIL CAPACITY: X
AIR SAMPLE PRE-SERVICE: X X
AIR SAMPLE POST-SERVICE: X
WIRING: X
CO / MOISTURE MONITOR: X
OIL LEVEL: X
OIL USED: X
HIGH PRESSURE AIR SWITCH: X
BELTS: X
PURGE VALVE: X
FILTER INFORMATION
SINTERED ELEMENT: X
FILTER #: X
FILTER #: X
INTAKE FILTER: X
FILTER #: X
FILTER #: X
PRESSURE READINGS
1ST STAGE PRESSURE: X
2ND STAGE PRESSURE: X
3RD STAGE PRESSURE: X
4TH STAGE PRESSURE: X
OIL PRESSURE: X
CASCADE CYL. HYDRO DATE
BANK/CYL. #1: X
BANK/CYL. #2: X
BANK/CYL. #3: X
BANK/CYL. #4: X
BANK/CYL. #5: X
BANK/CYL. #6: X
Note: Perform all checks, inspections, tests, adjustments, and lubrications. Top off fluid levels as needed.
PREVENTIVE MAINTENANCE TASK LIST
Equipment: Air Power International, Comp Air/Breathing Air Module (Station Air Compressor)
Frequency
ATTACHMENT 4 TO RFQ SP3300-19-Q-0060 Page 1 of 1
DDSP Fire Dept Equipment Task L
File details come from the government source that posted it.