Attach_1_SOW_SP330018Q0022_DDAG.pdf

PDF 27 KB Posted

Attached to
Brand Name or Equal - Purchase and Installation of a Corrugated Box Maker at DLA Distribution Albany Georgia
Solicitation number
SP3300-18-Q-0022
Issued by

About this file

Attachment 1 - Statement of Work

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Attach_2_Wage_Determination_SP330018Q0022.pdf PDF
RFQ_SP330018Q0022.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP330018Q0022 Attachment 1

Page | 1

STATEMENT OF WORK (SOW)

THE PURCHASE AND INSTALLATION OF A CORRUGATED BOX MAKER

AT DLA DISTRIBUTION ALBANY, GEORGIA

1.0 Background:

A. The Defense Logistics Agency (DLA) is a United States (U.S.) Department of Defense (DOD) agency that provides worldwide logistics support for the missions of the Military Departments and the Unified Combatant Commands under conditions of peace and war.

B. DLA Distribution Albany, Georgia (DDAG) has a requirement for a Contractor to purchase, install, provide all management, supervision, labor, equipment, materials, tools, and supplies to perform this contract.

C. Box maker machine will replace (1) unit that has been in operation by the container fabrication section at DDAG for 20 years. The current machines are wearing out its usefulness based on recurring down time, lack of precise control, and concern for operational safety.

2.0 Scope of Work to be performed:

A. The corrugated box maker shall be equivalent to the T-Roc Model HBM-72.

B. Contractor shall provide materials, supervision, tools, installation, labor, training, and materials to install and make operational the corrugated box maker. Contractor shall provide all transportation and rigging services to off-load, move, position, install one corrugated box maker within a designated location of Building 1221.

C. At the time of contract award, the Contracting Officer (KO) will identify the on-site Government point of contact (POC) who will monitor performance to ensure services are received and carried out in accordance with the requirements in this SOW. All references in this SOW to “Contractor personnel” include both Contractor employees and subcontractors.

D. Contractor personnel shall be escorted by Government personnel at all times when accessing these secured buildings. Installation date shall be coordinated with the POC.

Page | 2

2.1 The following are the requirement for one corrugated box maker for the purchase and installation:

A. Box maker shall be able to cut, slot, crease, and process single wall corrugated fiberboard with a capacity bursting (Mullen) test up to 200#.

B. Box maker shall be able to cut, slot, crease, and process double wall corrugated fiberboard with a capacity bursting (Mullen) test up to 450#.

C. Digital entry and display for quick entry and recall of box data without having to reset. Programmable sequence control system to allow data entry time. (For box styles and length, width and height) Set up for the machine should be between 30 seconds to 2 minutes for each new box.

D. The box maker shall accept a width of 72”

E. The machine should have the ability to make boxes of these types:

FTC- full telescope carton RSC- regular slotted cartons OSC- overlap slotted carton FOL- full overlap slotted carton HSCC-half slotted carton DBLCC- double cover carton FTHS-full telescope half slotted (2pc) OPF- one-piece folder FPF- five-panel folder TS- triple slide carton PADS and LINERS

F. Variable crease adjustments

G. Slot depth capacity of 19”, with a 38” width capacity

H. Include 5 cut heads & 4 score heads

I. Machine main voltage to be 208 AC volts single phase

J. Automatic air blower to clean out cut-off section

K. In-feed & out-feed table

L. Safety interlocks at access doors to prevent accidental injury

Page | 3

2.2 Training

Upon completion of installation and testing the contractor shall provide the following documentation and training.

A. Maintenance manuals for corrective and preventative maintenance (3 copies) and list of spare parts

B. Operator manuals (3 copies) Provides details for operational procedures for equipment and safety procedures for equipment operation

C. Operator training: The contractor shall provide minimum 8 hours training for 3 DDAG warehouse employees for the equipment as follows:

a. Procedure for operation of the equipment

b. Provide training of programming sequence control for data entry.

c. Safety training

d. Troubleshooting procedure for jam clearing and set-up

2.3 Warranty

A. Standard Manufacturer’s Warranty

2.4 Place of Performance

A. Defense Logistics Agency Defense Depot, Albany Georgia Bldg 1221 Door 20 814 Radford Blvd.

Albany, Georgia 31704

2.5 Period of Performance

A. The Contractor shall complete all equipment installation and training within 24 weeks after the date of contract award.

3.0 Responsibilities of the Government

A. The Government shall provide floor space not less than 96” X 189” that is sufficient to withstand 10,000 lbs.

B. The Government will provide an electrical power for the box machine.

(1phase/40 amp/208 volts) C. The Government will make available air pressure line (90 psi) for the box machine.

D. The Government will provide sufficient corrugated board stock to run machine during operating training.

E. The Government will make available at no cost to the Contractor electricity for

Contractor connection at Government provided work areas.

File details come from the government source that posted it.