Attachment_4_Submittal_Register,_P.2018.01253,_Fill_Firewall_Penetrations,_Whses_16A,_16B,_17,_19_and_56.pdf~RF3a5931.TMP
PDF 25 KB Posted
- Solicitation number
- SP330018B0015
- Issued by
-
Defense Logistics Agency Distribution
About this file
Attachment 4 Submittal Register,
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
Fill Firewall Penetrations, Warehouses 16A, 16B, 17, 19 and 56
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
SD-03 Product Data 2.2.10Curing Materials 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded
Sealants 3.1.3.3Batching and Mixing Equipment 3.2Conveying and Placing Concrete 2.2.8Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete 2.4.1Curing Compound 2.2.5Mechanical Reinforcing Bar
Connectors SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content 2.2.4Water
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
Fill Firewall Penetrations, Warehouses 16A, 16B, 17, 19 and 56
03 30 53 2.2.1Cementitious Materials Pozzolan
2.2.2Aggregates 2.3Delivery Tickets
SD-08 Manufacturer’s Instructions 2.4.1Curing Compound
03 37 13 SD-06 Test Reports 1.6Preconstruction Testing
1.7 GTesting During Construction
2.1.3Aggregate
2.3 GMixture Proportions
1.7.6 GRepair Of Shotcrete
3.9 GRepair Of Shotcrete
Resistance To Alkali-Silica Reaction
SD-07 Certificates
1.5 GQualifications
2.1.1Cement 2.1.2Supplementary Cementitious
Materials
2.1.5 GAdmixtures
2.1.6Reinforcement 2.1.7Curing Materials
1.6.1 GTesting Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
File details come from the government source that posted it.