Attachment_5_J.12_TRACKED_TE_3.1_GF.doc
DOC document 66 KB Posted
- Solicitation number
- SP330017R5004
- Issued by
-
Defense Logistics Agency Distribution
About this file
Amendment 0002 Attachment 5 Revised TE 3.1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_10_Revised_J.25,_COMPLETE_DDRV_Proposed_Productive_Hours_a_4-14-17.xlsx | XLSX spreadsheet | |
| Amendment_0002_RFP_SP3300-17-R-5004_SECTIONS_B-M.docx | DOCX document | |
| Attachment_1_-_Amend_0002_DDRV_Questions.docx | DOCX document | |
| Attachment_6_Revised_J.13_TE_3.2_TRACKED_Government_Training.docx | DOCX document | |
| Attachment_11_J.26_Amendment_02_Proposed_Training_Hrs.xlsx | XLSX spreadsheet | |
| Attachment_8__J.15_TE_4.1_TRACKED_Contractor_Training_.docx | DOCX document | |
| Amendment_0002_SF30_and_pg_2.pdf | ||
| Attachment_3_-_Amend_0002_J.1_PWS.docx | DOCX document | |
| Attachment_9_J.16__NEW_TE_4.2_Amendment_02_Government_Provided_Equipment_.xlsx | XLSX spreadsheet | |
| Attachment_4_J.5_TRACKED_Contractor_Furnished_Equipment.docx | DOCX document | |
| Attachment_2_-_Amend_0002_Word_Table.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP3300-17-R-5004
Amendment 0002
Attachment 5 Revised TE 3.1
Technical Exhibit 3.1
DLA RICHMOND GOVERNMENT FACILITIES (GF)
LEGEND
| Type Construction*1 |
| Facility Function*2 |
| B = Brick |
| CB = Concrete Block |
| S = Storage |
| I = Issue |
| H = Heated |
| UH = Unheated |
| KO = Kitting Operation |
| R = Receiving |
| TB = Tin Building |
| D = Dehumidified |
| H = Hazardous |
| P = Packaging |
| OS = Open Storage |
| RMT = Round Metal Tank |
| C = Cold Storage |
| SPT = Support |
| W = Wood |
| PVC = PVC/Poly Cover |
| D = Detrash |
| SP = Shipping |
| TRCF = Tin Roof Concrete Floor |
| A = Asphalt |
| Building/Lot # |
| Type |
Const.*1 Year
Const.
Gross
Sq. Ft.
(GSF)
SP Occupied.
(NSF)
Support Space
Sq Ft Facility
Function*2 Commodities
| Bldg 44 (Bays A-B) |
| B |
| 1941 |
| 36,000 |
| 36,000 |
| R, S, I, P, SP |
| Central Shipping and Receiving |
| Open Shed 3 |
| TRCF |
| 1995 |
| 104,000 |
| 43,112 |
| N/A |
| R, S, I, P, SP |
| Drum Storage |
| Open Shed 4 |
| TRCF |
| 1995 |
| 104,000 |
| 38,074 |
| N/A |
| R, S, I, P, SP |
| Drum Storage. ODS Cylinder storage |
Hazardous Material
| Open Shed 5 |
| TRCF |
| 1995 |
| 104,000 |
| 42,775 |
| N/A |
| R, S, I, P, SP |
| Drum Storage. ODS Cylinder storage |
Hazardous Material
| Open Shed 6 |
| TRCF |
| 1995 |
| 80,000 |
| 19,409 |
| N/A |
| R, S, I, P, SP |
| Drum Storage Hazardous Material |
| Open Storage 75 |
| A |
8,000
| N/A |
| R, S, I, P |
| Open Bulk Storage Compressed Gas Cylinders |
| Whse 11 (Bays A-L) |
| B |
| 1942 |
| 222,480 |
| 46,730 |
| 21,600 |
| R, S, I, P |
| Bulk Locations, Box Shop in Bay “L” -Heated, Dock Level, Unheated |
| Whse 12 (Bays A-E) |
| B |
| 1941 |
| 102,960 |
| 38,986 |
| 30,550 |
| R, S, I, P |
| Rack/.Bulk Locations, Dock Level, Unheated Hazardous Materials |
| Whse 13 (Bays A-E) |
| CB |
| 1993 |
| 99,384 |
| 35,015 |
| 19,680 |
| R, S, I, P |
| Rack/Bulk Locations, Dock Level, Unheated Hazardous Materials-Corrosives 1.4S & 1.4G explosives |
Whse 14 (Bays A-L)
| B |
| 1942 |
| 222,750 |
| 148,427 |
| 21,600 |
| R, S, I, P |
| Bulk Locations, Dock Level, Unheated Non - Hazardous Materials |
| Whse 8 (Bays A-E) |
| CB |
| 1984 |
| 99,120 |
| 50,513 |
| 9,988 |
| R, S, I, P |
| Rack/Bulk, locations, rated Class 1, Division 2 Explosive, Heated & Unheated, Dock Level, EE Rated MHE Required Hazardous Materials- Flammables, poisons, oxidizers |
| Whse 9 (Bays A-E) |
| B |
| 1941 |
| 98,050 |
| 8035 |
| 44,356 |
| R, S, I, P |
| Rack/Bulk locations, Unheated, Dock Level |
ISO Tanks
32,760
TE 3.1 – GF
File details come from the government source that posted it. Updated .