Attachment 3 Contract Data Requirements List (CDRL) & Data Item Description (DID)

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form Approved

CONTRACT DATA REQUIREMENTS LIST

0MB No. 0704-0188

The public reporting burden for this coll11c1ion of information is estimated to average 440 hours per response, including the timo for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of !aw, no person shall be subject to any penalty for failing to comply with a collaction of information if it doe$ not display a currently valid 0MB control number, Please do not raturn your form to tho above organization, Sand complated form to the Government IHuing Contracting Officer for tho Contract/PR No. ll$l&d in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

I

E. CONTRACT/PR NO. F. CONTRACTOR

DDJC Bldg 30 CCP System

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3, SUBTITLE

A00l Installation Schedule

4. AUTHORITY (Data Acquisition Document No.) 16. CONTRACT REFERENCE 6, REQUIRING OFFICE

DI-S-SATI 3.1.16.7 DS-FJIF

7. DD 250 REC 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

Yes

REQUIRED

One/R b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Fina!

Yes SUBMISSION** Draft

Rog Repro

16. REMARKS J7-AB I I

* 30 days after contract award. DS-FDI I ** Approval required prior to commencement of work. DS-FJIF 1 I

16. TOTAL 3 3 0

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Drawings, Engineering and Associated List Layout Drawings

4. AUTHORITY (Dara Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-E-SAT2 3.1.16.7 DS-FJIF

7. DD 250 REC 9, DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

Yes

REQUIRED

One/R b, COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

Yes SUBMISSIO� * Drah

Rog Repro

16. REMARKS J7-AB 1

* 30 Days after contract award. DS-FDI 1 I ** For approval, submit final draft NLT 10 days prior to installation start date. DS-FJIF 1 I Reproduction copies shall be in AutoCad Release 2014 and submitted via eMmail. 15. TOTAL 3 3 0

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Drawings, Engineering and Associated List As Builts

4. AUTHORITY {Data Acquisition Document No.)

5, CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-E-SAT2 3.1.16.7 DS-FJIF

7. DD 260 REQ ,. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

Yes

REQUIRED

One/R b. COPIES

8. APP CODE 11, AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final Yes

SUBMISSION** Draft Rog Repro

16. REMARKS J7-AB 1

* 15 days after installation completion date. DS-FDI 1 ** Approval required prior to final acceptance. DS-FJIF I Reproduction copies shall be in AutoCad Release 2014 and submitted via eMmail.

15. TOTAL 3 3 0

1, DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Commercial Manual Operating Manual

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE 6, REQUIRING OFFICE

DI-E-SATI 3.1.16.7 DS-FJIF

7. 00 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION REQUIRED

b. COPIES

8. APP CODE 11. AS OF DATE 13, DATE OF SUBSEQUENT a. ADDRESSEE Final SUBMISSIO� * Draft Rog Repro

16. REMARKS J7-AB I

* 30 days prior to installation completion date DS-FDI I ** Approval required prior to preliminary testing start date DS-FJIF 1 3

15. TOTAL 3 5 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

Adobe Professional 8.0

I

I I

I

I

I 17. PRICE GROUP

I 18. ESTIMATED

TOTAL PRICE

I

I

I

I

I 17. PRICE GROUP

I 18. ESTIMATED

I

TOTAL PRICE

I

I

I

I I

17. PRICE GROUP

I

18. ESTIMATED

TOTAL PRICE

I

I

I

I

I 17, PRICE GROUP

I 18. ESTIMATED

TOTAL PRICE

I

I

I

I

I

I

Attachment 3 - CDRLs and DIDs

RFP #SP3300-17-R-0009

DATA ITEM DESCRIPTION

Form Approved

0MB No. 0104-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports {0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.

1. TITLE 2. IDENTIFICATION NUMBER

Power Requirements DI-P-SATl

3. DESCRIPTION/PURPOSE

This item provides a comprehensive list of power requirments for all equipment to be furnished and installed by the Contractor.

4. APPROVAL DATE

(YYYYMMDDJ

06/04/20

7. APPLICATION/INTERRELATIONSHIP

5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)

DES-DDC-EI

6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE

NIA NA/

This Data Item Description is to be applied to contracts when the Government requires evaluation of p[ ower requirments to determine if sufficient power is available.

8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER

NIA NIA NIA

10. PREPARATION INSTRUCTIONS

1. Unless otherwise specified, the data item shall be in the Contractor's/supplier's standard format.

2. Power requirements shall be listed by total for each warehouse section in addition to each piece of equipment furnished.

A007

11. DISTRIBUTION STATEMENT

DD FORM 1664, AUG 96 (EGJ PREVIOUS EDITION MAY BE USED. Page of Pages

Designed using Perform Pro, WHS/OIOR, Aug 96

File details come from the government source that posted it. Updated .