ATTACHMENT_5_-_Drawings_UPS_Upgrade_Bldg_100.pdf

PDF 5 MB Posted

Attached to
Replace Transformer and UPS Upgrade Building 100 Federal contract opportunity
Solicitation number
SP3300-17-B-0011
Issued by
Defense Logistics Agency Distribution

About this file

ATTACHMENT 5 - UPS DRAWINGS

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP330017B0011

ATTACHMENT 5 - UPS DRAWINGS

tjc0831 Typewritten Text

BUILDING 100 REPLACE TRANSFORMER AND UPGRADE UPS - DDJC TRACY

tjc0831 Typewritten Text E 0.0

DAK0013

Typewritten Text

PROJECT LOCATION

DAK0013

Line

BUILDING 100 REPLACE TRANSFORMER AND UPGRADE UPS

DDJC - TRACY, CA

REPLACE EXISTING MBP

NEW BATTERY

EXISTING

EXISTING

BUILDING 100 UPS ROOM LAYOUT

(not to scale)

NEW UPS

NEW 800AF/700AT, NEMA 12 CIRCUIT BREAKER

BUILDING 100 REPLACE TRANSFORMER

AND UPGRADE UPS

DRWG E 5.1

SP330017B0011

ATTACHMENT 5 - UPS DRAWINGS

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Line

Rectangle

BU

IL

D

IN

G

R

EP

LA

C E

TR

A

N

SF

O

RM

ER

A

N D

U

PG

RA

D

E U

PS

D

D

JC

TR

A C

Y, C

A

EX

IS

TI

N

G U

PS

S

IN

G

LE

L

IN

E

D

IA

G

RA

M

BUILDING 100 REPLACE

TRANSFORMER AND UPGRADE UPS

DRWG # E 5.2

SP330017B0011

ATTACHMENT 5 - UPS DRAWINGS

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

DAK0013

Rectangle

Rectangle

K2

MBS INPUT

FROM UPS-2

(3Ø,4W,G)

MAINTENANCE

BYPASS INPUT

480vac, 60Hz (3Ø,4W,G)

For 2xSG-225kva UPS, 480Vac, 3Ø/4W/G p/n: PH021317-01SP

K1/2/3

SKRU

K1

OUTPUT TO

CRITICAL LOAD

480vac, 60Hz (3Ø, 4W,G)

Existing UPS INPUT SWITHBOARD (ISB)

480Vac, 3Ø/4W/G, 60Hz

UIS INPUT

480vac, 60Hz (3Ø,4W,G)

MIB-1

350AT

400AF

MIB-2

350AT

400AF

SIB

700AT

800AF

MBB

700AT

800AF

NEUTRAL

GROUND K1/2/3 K1/2

K2 K1

K2K1

GE

Critical Power

Drawing Title:

Drawing No.:

Issued by: Issued date:

Released by: Revised date:

Scale:

Sheet No.:

PH

PH 02/27/17 NONE

MI, RPAP-PC w/SKRU, 3ø/4W/G, for 2x SG-225kva, in PC system

PH021317-03GEMI

Rev. No.:

1.0

Project Name: Point of Contact:

Kahlon Amarjeet Equipment Part Number:

PH021317-01SP DLA

MBS INPUT

FROM UPS-1

(3Ø,4W,G)

BATTERY

CABINET

(EXISTING)

BATTERY

CABINET

(NEW)

K4

F8, 9

K7

K6

SSM

IN

V E R T E R

R E C T

IF

IE

R

FROM

BATTERY

(+, -, G)

RECTIFIER

INPUT

(3Ø, 3W,G)

BYPASS

INPUT

(3Ø, 4W,G)

UPS-1

SG-225KVA

480VAC, 60Hz

(EXISTING)

VR1 VR2

L3

L1 L50

K50

R50/ C50

5th THD filter (Option)

TR1

Customer Interface

Card (CIC)

F2

F3 F4

CP

K8

Q1

K3

R

P

A

K4

F8, 9

K7

K6

SSM

IN

V E R T E R

R E C T

IF

IE

R

FROM

BATTERY

(+, -, G)

RECTIFIER

INPUT

(3Ø, 3W,G)

BYPASS

INPUT

(3Ø, 4W,G)

UPS-2

SG-225KVA

480VAC, 60Hz

(EXISTING)

VR1 VR2

L3

L1

L50

K50

R50/

C50

5th THD filter (Option)

TR1

Customer Interface

Card (CIC)

F2

F3 F4

CP

K8

Q1 Q2

K3

R

P

A

RIB-1

400AT

400AF

RIB-2

400AT

400AF

MMB

700AT

800AF

BIB-1

350AT

400AF

BIB-2

350AT

400AF

MMB-TEMP

350AT

400AF

K2

K1/2/3

SKRU

K1

MBB

350AT

400AF

K1/2/3K1/2

K2 K1

K2K1

MIB

350AT

400AF

xxx xxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxx xxxxxx xx x xxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x

Existing UPS OUTPUT SWITCHBOARD (OSB)

480Vac, 3Ø/4W/G, 60Hz

FB-1

300AT

400AF

FB-4

20AT

2P

FB-2

350AT

400AF

MAIN

700AT

800AF

FB-3

350AT

400AF

FB-5

20AT

2P

FB-6

20AT

2P

FB-7

20AT

2P

SPACE

20AT

2P

SPACE

20AT

2P

TEMPORARY

OUTPUT TO

CRITICAL LOAD

Modification Instructions:

1. Additional items required:

1.1. Existing Input Swbd (ISB)

1.1.1. MMB breaker, 3P, 700AT/800AF, MCCB, manually operated breaker.

1.2. Existing Output Swbd (OSB)

1.1.1. MAIN breaker, 3P, 700AT/800AF, MCCB, manually operated breaker.

2. Modification Instructions:

2.1. Initial condition:

2.1.1. On ISB switchboard:

MMB-TEMP, RIB-1 and BIB-1 breaker are closed.

All remaining breakers are open.

2.1.2. On OSB switchboard:

MAIN breaker must be open.

All remaining breakers are closed to support the critical load

2.1. Install the 2

nd UPS and RPAP unit

2.1. Transfer to critical from UPS-1 to

Maintenance bypass mode via existing MBP. Now the critical load is supported by utility.

See power flows in RED

2.2. Disconnect the power cable from

UPS-1 to existing MBP, MIB breaker.

See power flow in BLUE.

2.3. Shut down the UPS-1 module.

2.4. Connect UPS-2 input and RPAP MBB

breaker to existing ISB switchboard.

25. Connect RPAP input to both UPS outputs and OSB switchboard MAIN,

2.6. Connect RPA control cables.

2.7. Connect SKRU control and MIB

breakers aux contact from RPAP to each UPS module

2.8. Run the RPA system to make sure it

works correctly with MAIN breaker in the OSB open.

Existing MBP 480Vac, 3Ø/4W/G, 60Hz

NEW 800AF/700AT MCCB

NEMA 12 ENCLOSURENEW 3/4" C

NEW RPA CARD

NEW BATTERY

NEW 3/4"C

REMOVE

NEW 3/4"C

GOVT. SUPPLIED UPS

NEW 2- 4#500,1#4GRD

NEW MBP RPAP-PC

EXISTING

RACK

NEW 2- 4#500,1#4GRD

REMOVE 4#350, 1#4 GRD

4#350, 1#4 GRD

REMOVE EXISTING MBP

NEW 3"C 4#350, 1#4 GRD

NEW 4#350, 1#4GRD

NEW 3"C, 4#350, 1#4GRD

il

BUILDING 100 UPS NEW SINGLE LINE

REMOVE EXISTING CABEL

SP330017B0011

ATTACHMENT 5 - UPS DRAWINGS

DAK0013

Rectangle

DAK0013

Line

DAK0013

Rectangle

DAK0013

Line

DAK0013

Rectangle

DAK0013

Line

DAK0013

Rectangle

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Rectangle

DAK0013

Line

DAK0013

Rectangle

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Line

DAK0013

Rectangle

DAK0013

Typewritten Text

BUILDING 100 REPLACE TRANSFORMER

AND UPGRADE UPS - DDJC TRACY

DRWG # E 5.3

DAK0013

Typewritten Text

BUILDING 100 REPLACE TRANSFORMER AND UPGRADE UPS - DDJC TRACY

Line

BUILDING 100 REPLACE TRANSFORMER AND UPGRADE UPS DDJC - TRACY, CA

ANNEXURE 1

BUILDING 100 EXISTING UPS LAYOUT

SP330017B0011

ATTACHMENT 5 - UPS DRAWINGS

Annexure 1 - Existing UPS layout
E 0.0 General Project Location
E5.1 UPS-LayOut
E5.2 UPS-ExistingSingleLine
E5.3 UPS- NewSingleLine

File details come from the government source that posted it. Updated .