The file's text, extracted by GovTribe without its formatting.
Base Year
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Base Year - January 1, 2016 - December 31, 2016 | | | | |
| CLIN 0001 | 12 | MO |
| Firm-Fixed Price | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Pearl Harbor, Hawaii | | |
forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00 generator, port 60-100kw (EJON ca0011) 1 EA $0.00
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 0002 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution, Pearl Harbor, Hawaii | | | | |
forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 pallet jack elc srt 6k EJONs (dl8435, dl8436, dl8437) 3 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00
| generator, port 60-100kw (EJON ca0011) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0003 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | 2,000 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0004 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | | | | $110,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0005 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | | | | $12,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 0006 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii | | | | |
forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00
| forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042) | 3 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 0007 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii | | | | |
forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00
| forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042) | 3 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0008 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Distribution (Retail) Pearl Harbor, Hawaii | 220 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0009 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution (Retail) Pearl Harbor | | | | $50,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0010 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution (Retail) Pearl Harbor | | | | $2,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Base Year - January 1, 2016 - December 31, 2016 | | | | |
| CLIN 0011 | 12 | MO |
| Firm-Fixed Price | | |
| Semi-Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii | | |
forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00
DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE
| CLIN 0012 | 12 | MO |
| Firm-Fixed Price | | |
| Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii | | |
forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00 warehouse sweeper walking (EJON 0w4377) 1 EA $0.00
| scrubbing machine, floor (EJON 0w3256) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0013 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | 200 | HR | | |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0014 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | | | | $50,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0015 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | | | | $2,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 0016 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii | | | | |
forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00
| scrap shredder (EJON 0w6214) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 0017 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii | | | | |
forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00
| scrap shredder (EJON 0w6214) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0018 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | 170 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0019 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | | | | $48,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 0020 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | | | | $2,000.00 |
Option Year 1
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Option Year 1- January 1, 2017 - December 31, 2017 | | | | |
| CLIN 1001 | 12 | MO |
| Firm-Fixed Price | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Pearl Harbor, Hawaii | | |
forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00 generator, port 60-100kw (EJON ca0011) 1 EA $0.00
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 1002 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution, Pearl Harbor, Hawaii | | | | |
forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 pallet jack elc srt 6k EJONs (dl8435, dl8436, dl8437) 3 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00
| generator, port 60-100kw (EJON ca0011) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1003 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | 2,000 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1004 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | | | | $110,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1005 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | | | | $12,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 1006 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii | | | | |
forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00
| forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042) | 3 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 1007 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii | | | | |
forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00
| forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042) | 3 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1008 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Distribution (Retail) Pearl Harbor, Hawaii | 220 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1009 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution (Retail) Pearl Harbor | | | | $50,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1010 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution (Retail) Pearl Harbor | | | | $2,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Option Year 1 - January 1, 2017 - December 31, 2017 | | | | |
| CLIN 1011 | 12 | MO |
| Firm-Fixed Price | | |
| Semi-Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii | | |
forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00
DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE
| CLIN 1012 | 12 | MO |
| Firm-Fixed Price | | |
| Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii | | |
forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00 warehouse sweeper walking (EJON 0w4377) 1 EA $0.00
| scrubbing machine, floor (EJON 0w3256) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1013 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | 200 | HR | | |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1014 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | | | | $50,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1015 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | | | | $2,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 1016 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii | | | | |
forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00
| scrap shredder (EJON 0w6214) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 1017 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii | | | | |
forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00
| scrap shredder (EJON 0w6214) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1018 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | 170 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1019 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | | | | $48,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 1020 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | | | | $2,000.00 |
Option Year 2
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Option Year 2 - January 1, 2018 - December 31, 2018 | | | | |
| CLIN 2001 | 12 | MO |
| Firm-Fixed Price | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Pearl Harbor, Hawaii | | |
forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00 generator, port 60-100kw (EJON ca0011) 1 EA $0.00
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 2002 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution, Pearl Harbor, Hawaii | | | | |
forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 pallet jack elc srt 6k EJONs (dl8435, dl8436, dl8437) 3 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00
| generator, port 60-100kw (EJON ca0011) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2003 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | 2,000 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2004 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | | | | $110,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2005 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution Pearl Harbor, Hawaii | | | | $12,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 2006 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii | | | | |
forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00
| forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042) | 3 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 2007 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii | | | | |
forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00
| forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042) | 3 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2008 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Distribution (Retail) Pearl Harbor, Hawaii | 220 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2009 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution (Retail) Pearl Harbor | | | | $50,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2010 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Distribution (Retail) Pearl Harbor | | | | $2,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Option Year 2 - January 1, 2018 - December 31, 2018 | | | | |
| CLIN 2011 | 12 | MO |
| Firm-Fixed Price | | |
| Semi-Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii | | |
forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| Base Year - January 1, 2016 - December 31, 2016 | | | | |
| CLIN 2012 | 12 | MO |
| Firm-Fixed Price | | |
| Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii | | |
forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00 warehouse sweeper walking (EJON 0w4377) 1 EA $0.00
| scrubbing machine, floor (EJON 0w3256) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2013 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | 200 | HR | | |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2014 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | | | | $50,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2015 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| D2 at DLA Distribution Pearl Harbor, Hawaii | | | | $2,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 2016 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii | | | | |
forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00
| scrap shredder (EJON 0w6214) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 2017 | 12 | MO | | |
| Firm-Fixed Price | | | | |
| Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii | | | | |
forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00
| scrap shredder (EJON 0w6214) | 1 | EA | | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2018 | | | | |
| Time and Materials Costs | | | | |
| Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | 170 | HR | $0.00 | $0.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2019 | | | | |
| Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | | | | $48,000.00 |
| DESCRIPTION | QTY | U/I | UNIT PRICE | CEILING PRICE |
| CLIN 2020 | | | | |
| Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used. | | | | |
| DLA Disposition Services, Pearl Harbor, Hawaii | | | | $2,000.00 |