About this file

CLIN Pricing Worksheet

View the file

Other files

File Type Posted
Award_Notice.docx DOCX document
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Attach_10_Proposal_Sub_Instr_Rev_1_12-15-15.docx DOCX document
Amendment_0001.pdf PDF
Attach_1_-_PWS.doc DOC document
Attach_2_-DLA_Dist_PH_Equip_List.xls XLS spreadsheet
Attach_7_-_Sample_Maintenance_Workorder.pdf PDF
Attach_10_Proposal_Sub_Instr.docx DOCX document
Attach_15_Subcontracting_Plan_Template.doc DOC document
Attach_9_Past_Performance_Q.docx DOCX document
Attach_13_Request_for_access_to_DDHP_Controlled_Industrial_Area.docx DOCX document
Attach_8_-_Vehicle_Technical_Inspection_DLA_Form_1730.pdf PDF
Attach_6_-_MaintTask_Charts.ppt PPT presentation
Attach_11_Accounting_System_Cert.docx DOCX document
Attach_4_-_DLA_Dist_(Retail)_PH_Equip_List.xls XLS spreadsheet
Attach_3_-_DLA_Disp_PH_Equip_List.xlsx XLSX spreadsheet
Attach_5_-_DLA_Dist_D2_Pearl_Harbor_Equip_List.xls XLS spreadsheet
SP3300-16-R-0017.pdf PDF
Attach_14_DOL_Wage_Determination.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Base Year - January 1, 2016 - December 31, 2016
CLIN 000112MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Pearl Harbor, Hawaii

forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00 generator, port 60-100kw (EJON ca0011) 1 EA $0.00

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 000212MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution, Pearl Harbor, Hawaii

forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 pallet jack elc srt 6k EJONs (dl8435, dl8436, dl8437) 3 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00

generator, port 60-100kw (EJON ca0011)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0003
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Distribution Pearl Harbor, Hawaii2,000HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0004
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution Pearl Harbor, Hawaii$110,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0005
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution Pearl Harbor, Hawaii$12,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 000612MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii

forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00

forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042)3EA$0.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 000712MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii

forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00

forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042)3EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0008
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Distribution (Retail) Pearl Harbor, Hawaii220HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0009
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution (Retail) Pearl Harbor$50,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0010
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution (Retail) Pearl Harbor$2,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Base Year - January 1, 2016 - December 31, 2016
CLIN 001112MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii

forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00

DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

CLIN 001212MO
Firm-Fixed Price
Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii

forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00 warehouse sweeper walking (EJON 0w4377) 1 EA $0.00

scrubbing machine, floor (EJON 0w3256)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0013
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
D2 at DLA Distribution Pearl Harbor, Hawaii200HR
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0014
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
D2 at DLA Distribution Pearl Harbor, Hawaii$50,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0015
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
D2 at DLA Distribution Pearl Harbor, Hawaii$2,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 001612MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii

forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00

scrap shredder (EJON 0w6214)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 001712MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii

forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00

scrap shredder (EJON 0w6214)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0018
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Disposition Services, Pearl Harbor, Hawaii170HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0019
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Disposition Services, Pearl Harbor, Hawaii$48,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 0020
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Disposition Services, Pearl Harbor, Hawaii$2,000.00

Option Year 1

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Option Year 1- January 1, 2017 - December 31, 2017
CLIN 100112MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Pearl Harbor, Hawaii

forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00 generator, port 60-100kw (EJON ca0011) 1 EA $0.00

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 100212MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution, Pearl Harbor, Hawaii

forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 pallet jack elc srt 6k EJONs (dl8435, dl8436, dl8437) 3 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00

generator, port 60-100kw (EJON ca0011)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1003
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Distribution Pearl Harbor, Hawaii2,000HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1004
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution Pearl Harbor, Hawaii$110,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1005
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution Pearl Harbor, Hawaii$12,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 100612MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii

forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00

forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042)3EA$0.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 100712MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii

forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00

forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042)3EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1008
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Distribution (Retail) Pearl Harbor, Hawaii220HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1009
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution (Retail) Pearl Harbor$50,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1010
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution (Retail) Pearl Harbor$2,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Option Year 1 - January 1, 2017 - December 31, 2017
CLIN 101112MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii

forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00

DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

CLIN 101212MO
Firm-Fixed Price
Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii

forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00 warehouse sweeper walking (EJON 0w4377) 1 EA $0.00

scrubbing machine, floor (EJON 0w3256)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1013
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
D2 at DLA Distribution Pearl Harbor, Hawaii200HR
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1014
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
D2 at DLA Distribution Pearl Harbor, Hawaii$50,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1015
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
D2 at DLA Distribution Pearl Harbor, Hawaii$2,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 101612MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii

forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00

scrap shredder (EJON 0w6214)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 101712MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii

forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00

scrap shredder (EJON 0w6214)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1018
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Disposition Services, Pearl Harbor, Hawaii170HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1019
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Disposition Services, Pearl Harbor, Hawaii$48,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 1020
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Disposition Services, Pearl Harbor, Hawaii$2,000.00

Option Year 2

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Option Year 2 - January 1, 2018 - December 31, 2018
CLIN 200112MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Pearl Harbor, Hawaii

forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00 generator, port 60-100kw (EJON ca0011) 1 EA $0.00

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 200212MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution, Pearl Harbor, Hawaii

forklft e 4k 36v 144-168" (EJON zy0430) 1 EA $0.00 forklift dsl prt 20k 210" (EJON dl6307) 1 EA $0.00 forklift dsl prt 6k 100-189" (EJON dl6244) 1 EA $0.00 forklift elc 4k 180-185" (EJON dl9307) 1 EA $0.00 forklift erch 3k 100-144" (EJONs dl9461, dl9462, dl9463) 3 EA $0.00 forklift gas prt 15k 210" (EJON dl3235) 1 EA $0.00 forklift gas prt 6k 180-189" (EJONs-dl0225, dl0226, dl0227, dl0228, zy0421, zy0422, zy0423, zy0424, zy0425, zy0426, zy0427, zx0001, zx0002) 13 EA $0.00 forklift gas srt 6k 180" (EJONs-zy0428, zy0429) 2 EA $0.00 forklift gprt 10k 159-180 (EJON zz0388) 1 EA $0.00 pallet jack elc srt 6k EJONs (dl8435, dl8436, dl8437) 3 EA $0.00 scooter 3or4 wheel gas (EJONs-dl9418, dl9419, dl9421, dl9422, dl9424, dl9425) 6 EA $0.00 stock selector 168-218" (EJONs-dl4603, dl4604, dm0014, dm0018) 4 EA $0.00 trailer semi 20 ton stake (EJONs dl3237, dl3238, dl4494, zn0508, zn0509) 5 EA $0.00 truck trailer spotter (EJON dl2490) 1 EA $0.00 turret truck rail guided (EJONs-dl3517, dl3518) 2 EA $0.00 turret truck wire guided (EJONs-dl0062, dl0063) 2 EA $0.00 warehouse sweeper riding (EJONs-dl9304, dl9305, dl9464) 3 EA $0.00

generator, port 60-100kw (EJON ca0011)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2003
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Distribution Pearl Harbor, Hawaii2,000HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2004
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution Pearl Harbor, Hawaii$110,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2005
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution Pearl Harbor, Hawaii$12,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 200612MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii

forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00

forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042)3EA$0.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 200712MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution (Retail) Pearl Harbor, Hawaii

forklift, gas srt 6k 180" (EJONs ph2030, ph2031, ph2032, ph2033) 4 EA $0.00 forklift, gas 4k 180" (EJONs ph2002, ph2009, ph2010, ph2023) 4 EA $0.00 forklift, gas 4k 187" (EJONs ph2021, ph2034, ph2035) 3 EA $0.00 forklift, gas prt 6k 180-189" (EJONs ph2004, ph2000, ph2022) 3 EA $0.00 stock selector 168-218" (EJONs ph2013, ph2036) 2 EA $0.00 forklift, elec 4k 180-185" (EJONs ph2037, ph2038, ph2039) 3 EA $0.00 forklift, elec 10k (EJON ph2006) 1 EA $0.00 forklift, dsl prt 20k 210" (EJON ph2017) 1 EA $0.00 forklift, dsl prt 12k 122-210" (EJON ph2043) 1 EA $0.00

forklift 10k gp 180 (EJONs ph2040, ph2041, ph2042)3EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2008
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Distribution (Retail) Pearl Harbor, Hawaii220HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2009
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution (Retail) Pearl Harbor$50,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2010
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Distribution (Retail) Pearl Harbor$2,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Option Year 2 - January 1, 2018 - December 31, 2018
CLIN 201112MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii

forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
Base Year - January 1, 2016 - December 31, 2016
CLIN 201212MO
Firm-Fixed Price
Annual Preventive Maintenance Services for the D2 Government Owned Material Handling Equipment located at DLA Distribution/Pearl Harbor, Hawaii

forklift, elec 3k wh 4kstand (EJONs 0w1852, 0w1854) 2 EA $0.00 forklift, dsl prt 4k 144-187" (EJON 0w0524) 1 EA $0.00 forklift gas prt 4k 144" 7 each (EJONs 0w1597, 0w4327, 0w4328, 0w4332, 0w6334, 0w6346, 0w7827) 7 EA $0.00 forklift dsl prt 6k 100-189" (EJON 0w5997) 1 EA $0.00 warehouse sweeper riding (EJON 0w8666) 1 EA $0.00 warehouse sweeper walking (EJON 0w4377) 1 EA $0.00

scrubbing machine, floor (EJON 0w3256)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2013
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
D2 at DLA Distribution Pearl Harbor, Hawaii200HR
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2014
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
D2 at DLA Distribution Pearl Harbor, Hawaii$50,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2015
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
D2 at DLA Distribution Pearl Harbor, Hawaii$2,000.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 201612MO
Firm-Fixed Price
Semi-Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii

forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00

scrap shredder (EJON 0w6214)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 201712MO
Firm-Fixed Price
Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Disposition Services, Pearl Harbor, Hawaii

forklift gas prt 4k 144" (EJONs 0w4329, 0w4330, 0w4331) 3 EA $0.00 forlift electric 3k n/a 144-200" (EJONs 0w2325, 0w2327) 2 EA $0.00 forklift dsl, prt 6k 100-189 (EJON 0w4270) 1 EA $0.00 forklift dsl, 10k (EJON 0w0973) 1 EA $0.00 forklift dsl, prt 20k 210" (EJON 0w271e) 1 EA $0.00 front end loader (EJON 0w4650) 1 EA $0.00 scooter, 3 or 4 wheel (EJON 0w5314) 1 EA $0.00 scrap handler (EJON 0w0676) 1 EA $0.00

scrap shredder (EJON 0w6214)1EA$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2018
Time and Materials Costs
Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.
DLA Disposition Services, Pearl Harbor, Hawaii170HR$0.00$0.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2019
Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Disposition Services, Pearl Harbor, Hawaii$48,000.00
DESCRIPTIONQTYU/IUNIT PRICECEILING PRICE
CLIN 2020
Off-Site Transportation for repairs made on MHE in route to other military installations or major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The estimated dollars shown is an estimate only. Contractor will be paid for the actual dollars used.
DLA Disposition Services, Pearl Harbor, Hawaii$2,000.00

File details come from the government source that posted it. Updated .