SP3300-14-R-0002_CORPUS_CHRISTI _TX.pdf
PDF 451 KB Posted
- Attached to
- Corpus Christi, TX IT Support Services
- Solicitation number
- SP330014R0002
- Issued by
-
Defense Logistics Agency Distribution
About this file
SP3300-14-R-0002 Corpus Chrisi TX Request for Proposal
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 See Schedule
1. REQUISITION NUMBER
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
SP3300-14-R-0002
5. SOLICITATION NUMBER
2014 MAY 01
6. SOLICITATION ISSUE
DATE
Rafael Dixon PNNAB43
a. NAME
Phone: 717-770-8865
b. TELEPHONE NUMBER (No Collect calls)
2014 JUN 02
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY CODE SP3300
DLA DISTRIBUTION
OFFICE OF PROCUREMENT - EBS
2001 MISSION DRIVE
NEW CUMBERLAND PA 17070-5000
USA
10. THIS ACQUISITION IS 100UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
8 (A)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
541513NAICS:
25.5MSIZE STANDARD:
11. DELIVERYFOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/ CODE
OFFEROR
FACILITY
CODE
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See Schedule
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
SEE SCHEDULE
44PAGE 1 OF
03:00 PM
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE ADDENDUM
EDWOSB
32a. QUANTITY IN COLUMN 21 HAS BEEN
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED
COMPLETE PARTIAL FINAL
STANDARD FORM 1449 (REV. 2/2012) BACK
36. PAYMENT
PARTIAL FINAL
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42b. RECEIVED AT (Location)
CONTINUED ON NEXT PAGE
1. This Request for Proposals (RFP) is being issued to establish a Firm-Fixed Price (FFP) Performance Based Service contract for a base year and four (4) option years, or for a total of five (5) years. This requirement is for IT Support Services for DLA Information Operations New Cumberland located at DLA Distribution Corpus Christi, TX.
2. This acquisition is being solicited as a Service-Disabled Veteran-Owned Small Business Set-Aside. The applicable NAICS code is 541513, with a small business size standard of $25,500,000.00.
3. Period of performance for this acquisition:
Phase-In: 15 August 2014 through 14 September 2014 Base year: 15 September 2014 through 14 August 2015 Option Year One(1): 15 August 2015 through 14 August 2016 (if exercised) Option Year Two(2): 15 August 2016 through 14 August 2017 (if exercised) Option Year Three(3): 15 August 2017 through 14 August 2018 (if exercised) Option Year Four (4): 15 August 2018 through 14 August 2019 (if exercised)
4. This is a follow-on contract to contract SP3300-11-C-1009. The incumbent for this contract is Diverse Technologies Corporation (DTC), 4355 Nicole Drive, Lanham, MD 20706. Although this acquisition is a follow-on contract, the requirements included in this solicitation, SP3300-14-R-0002 may not be the same as those requirements required by the predecessor contract; therefore, offerors are advised that it is up to each offeror to determine the number of hours, labor categories, etc. required/anticipated to complete the requirements for this solicitation, SP3300-14-R-0002 based on the information provided in Solicitation SP300-14-R-0002 and any amendments issued to SP3300-14-R-0002. The Government intends to award one (1) Firm-Fixed Price (FFP) contract resulting from this solicitation. Any award resulting from this solicitation will be issued on a Standard Form (SF) 1449.
5. FAR 1.602-1- Contracting Officers Authority
(a) Contracting officers have authority to enter into, administer, or terminate contracts and make related determinations and findings. Contracting officers may bind the Government only to the extent of the authority delegated to them. Contracting officers shall receive from the appointing authority (see 1.603-1) clear instructions in writing regarding the limits of their authority. Information on the limits of the contracting officers’ authority shall be readily available to the public and agency personnel.
(b) No contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met.
6. All offeror's shall submit their proposal on a signed SF 1449. The contractor shall include past performance and technical information in the offer.
7. Proposals must be hand delivered or mailed only to the following address:
DLA DISTRIBUTION
ATTN: RAFAEL E. DIXON
ACQUISITION OPERATIONS
5404 J AVENUE, BLDG 404
NEW CUMBERLAND, PA 17070-5059
NOTE: If packages are sent by commercial carrier, the package must be plainly marked ON THE OUTSIDE OF THE COMMMERCIAL CARRIER'S ENVELOPE with the solicitation number, date, and time set forth for receipt of offers as indicated in Blocks 5 and 8, page 1, of the SF 1449. At this time, only FedEx and UPS provide express delivery to the office listed above.
Offers must be received by 12 June 2014 by 3:00 pm eastern local time to be considered for award. Offerors shall email the Acquisition Specialist, Mr. Rafael E. Dixon, at rafael.dixon@dla.mil the method in which they will be submitting their proposal and provide any associated tracking information. If an offeror intends to
PAGE 3 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-14-R-0002
hand deliver their proposal, the offeror must contact the Acquisition Specialist, Mr. Rafael E. Dixon, via email atleast one (1) day prior to the submission deadline to coordinate delivery.
The packaging of the proposals and ALL documents submitted must be clearly marked with the Offeror's Name and Solicitation Number and the following statement, "FOR OFFICIAL USE ONLY - SOURCE SELECTION INFORMATION - SEE
FAR 2.101 & 3.104"
8. Questions regarding this solicitation should be emailed to the Acquisition Specialist, Mr. Rafael E.
Dixon at rafael.dixon@dla.mil by 4:00pm Eastern Standard Time, on 27 May 2014. Questions not received via electronic mail may not be answered.
If an offeror has any questions regarding the solicitation or believes that the requirements in this instruction/solicitation contain an error or omission, the offeror shall immediately notify the Contract Specialist, Mr. Rafael E. Dixon (rafael.dixon@dla.mil) in writing. If an offeror believes that the requirements in this instruction are otherwise unsound, the offeror shall immediately notify the Contracting Officer, Joni L. Stephens (joni.stephens@dla.mil) in writing with supporting rationale. Offerors are reminded that the Government reserves the right to award this effort based on initial proposals received, without discussions.
9. Accessibility of E & IT Products to People with Disabilities (Section 508 of the Rehabilitation Act):
Unless otherwise specified, all products (supplies or services) furnished under this contract shall comply with the applicable Electronic and Information Technology (E&IT) Accessibility Standards at 36 CFR part 1194.
10. The Government is not soliciting for the “same old way” of doing business. The Government encourages proposals that will achieve savings through innovative processes. Furthermore, DLA Distribution personnel are working to eliminate unnecessary requirements and negotiating for a reduction in supplies and services prices.
Therefore, your assistance is requested in reducing prices and improving our buying processes.
PAGE 4 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SUPPLIES/SERVICES: D301-V00006569
ITEM DESCRIPTION:
IT Support Services for DLA Distribution Corpus Christi, TX in accordance with the attached Performance Work Statement (PWS).
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 D301-V00006569 11.000 MO $ ________________ $ ________________
IT SUPPORT
SERVICES CORPUS
CHRISTI, TX
PREP FOR DELIVERY:
See Attached Performance Work Statement.
PERIOD OF PERFORMANCE: 09/15/2014 - 08/14/2015
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 0049528231 0001 N/A N/A N/A 04/24/2013
SUPPLIES/SERVICES: V999-V00007739
This CLIN is for cost-reimbursement travel in accordance with the Joint Travel Regulations (JTR) for the base year of the contract. This is a not-to-exceed (NTE) amount of $1,500.00
0002 V999-V00007739 12.000 MO $ ________________ $ ________________
TRAVEL
See Attached Statement of Work.
PERIOD OF PERFORMANCE: 08/15/2014 - 08/14/2015
PAGE 5 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SUPPLY/SERVICE: D301-V00006569 CONT'D
ITEM PR PRLI PR PRLI Material Need Ship Date .
0002 0049528232 0001 N/A N/A N/A 04/24/2013
Phase-In Period for one (1) month for IT Support Services at DLA Distribution Corpus Christi, TX. In accordance with the attached Performance Work Statement (PWS).
0003 D301-V00006569 1.000 MO $ ________________ $ ________________
PHASE-IN ONE (1)
MONTH CORPUS
CHRISTI
See Attached Performance Work Statement
PERIOD OF PERFORMANCE: 08/15/2014 - 09/14/2014
IT Support Services for DLA Distribution Corpus Christi, TX in accordance with the attached Performance Work
1001 D301-V00006569 12.000 MO $ ________________ $ ________________
IT SUPPORT
PRICING TERMS: Firm Fixed Price
PAGE 6 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PERIOD OF PERFORMANCE: 08/15/2015 - 08/14/2016
ITEM PR PRLI PR PRLI Material Need Ship Date .
0003 0049527900 0001 N/A N/A N/A 04/24/2013 1001 N/A N/A N/A N/A N/A 04/24/2013
This CLIN is for cost-reimbursement travel in accordance with the Joint Travel Regulations (JTR) for option year one (1) of the contract. This is a not-to-exceed (NTE) amount of $1,500.00
1002 V999-V00007739 12.000 MO $ ________________ $ ________________
PERIOD OF PERFORMANCE: 08/15/2015 - 08/14/2016
ITEM PR PRLI PR PRLI Material Need Ship Date .
1002 N/A N/A N/A N/A N/A 04/24/2013
PAGE 7 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
IT Support Services for DLA Distribution Corpus Christi, TX in accordance with the attached Performance Work
2001 D301-V00006569 12.000 MO $ ________________ $ ________________
IT SUPPORT
PERIOD OF PERFORMANCE: 08/15/2016 - 08/14/2017
ITEM PR PRLI PR PRLI Material Need Ship Date .
2001 N/A N/A N/A N/A N/A 04/24/2013
This CLIN is for cost-reimbursement travel in accordance with the Joint Travel Regulations (JTR) for option year two (2) of the contract. This is a not-to-exceed (NTE) amount of $1,500.00
2002 V999-V00007739 12.000 MO $ ________________ $ ________________
PAGE 8 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SUPPLY/SERVICE: V999-V00007739 CONT'D
PERIOD OF PERFORMANCE: 08/15/2016 - 08/14/2017
ITEM PR PRLI PR PRLI Material Need Ship Date .
2002 N/A N/A N/A N/A N/A 04/24/2013
IT Support Services for DLA Distribution Corpus Christi, TX in accordance with the attached Performance Work
3001 D301-V00006569 12.000 MO $ ________________ $ ________________
IT SUPPORT
PERIOD OF PERFORMANCE: 08/15/2017 - 08/14/2018
ITEM PR PRLI PR PRLI Material Need Ship Date .
3001 N/A N/A N/A N/A N/A 04/24/2013
PAGE 9 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SUPPLY/SERVICE: V999-V00007739 CONT'D
This CLIN is for cost-reimbursement travel in accordance with the Joint Travel Regulations (JTR) for option year three (3) of the contract. This is a not-to-exceed (NTE) amount of $1,500.00
3002 V999-V00007739 12.000 MO $ ________________ $ ________________
PERIOD OF PERFORMANCE: 08/15/2017 - 08/14/2018
ITEM PR PRLI PR PRLI Material Need Ship Date .
3002 N/A N/A N/A N/A N/A 04/24/2013
IT Support Services for DLA Distribution Corpus Christi, TX in accordance with the attached Performance Work
4001 D301-V00006569 12.000 MO $ ________________ $ ________________
IT SUPPORT
PAGE 10 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PERIOD OF PERFORMANCE: 08/15/2018 - 08/14/2019
ITEM PR PRLI PR PRLI Material Need Ship Date .
4001 N/A N/A N/A N/A N/A 04/24/2013
This CLIN is for cost-reimbursement travel in accordance with the Joint Travel Regulations (JTR) for option year four (4) of the contract. This is a not-to-exceed (NTE) amount of $1,500.00
4002 V999-V00007739 12.000 MO $ ________________ $ ________________
PERIOD OF PERFORMANCE: 08/15/2018 - 08/14/2019
ITEM PR PRLI PR PRLI Material Need Ship Date .
4002 N/A N/A N/A N/A N/A 04/24/2013
PAGE 11 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Part 12 Clauses
CLAUSES ADDED TO PART 12 BY ADDENDUM
Clauses
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS) REQUIREMENTS
(a) The contractor, in performing this contract, will be subject to a past performance assessment in accordance with FAR 42.15 and the Contractor Performance Assessment Reporting System (CPARS) training materials can be found at http://www.cpars.csd.disa.mil/allapps/cpartrng/documents/CPARS%20Presentation.pdf. All information contained in the assessment may be used by the Government, within the limitations of FAR 42.15, for future source selections in accordance with FAR 15.304 where past performance is an evaluation factor. Assessments will be conducted as prescribed by CPARS guidance.
(b) The contractor will be provided with a copy of the assessment. The contractor will have 30 calendar-days to submit comments, additional information, or rebut statements if warranted or desired. The contractor must strictly control access to the assessment while in the Contractor's possession and must ensure that the assessment is never released to persons or entities outside of the contractor's control. After receipt of Contractor's comments or expiration of the 30 day comment period, whichever occurs first, and depending on the Contractor's response the Government will:
(1) If no comments are received; close the CPAR by the Assessing Official Rep and Reviewing Official;
(2) If the Contractor concurs with the assessment; accept/update and close the CPARS and forward comments to all reviewers;
(3) If Contractor does not concur with the assessment, coordinate a final response with Reviewing Official, Assessing Official Representative, and Assessing Official;.
(4) Enter the final government response and close CPARS.
(c) After completion of one of the appropriate actions, the Assessing Official will notify all individuals that the report is complete. The assessment is considered complete when signed by the Assessing or Reviewing Official.
(d) The official responsible for the corporate operating unit being assessed can submit a written request to receive a copy of the completed CPARS assessment. The assessment is not subject to the Disputes clause of the contract, nor is it subject to appeal beyond the review and comment procedures described above and in the CPARS Guide.
(e) Refer to http://www.cpars.csd.disa.mil/ for details and additional information related to CPARS, CPARS user access (which includes obtaining a PKI certificate), how contract performance assessments are conducted, and how contractors participate.
ILLEGAL ITEMS NOT AUTHORIZED ON FEDERAL INSTALLATION
Illegal drugs, guns or other contraband are not authorized on this Federal installation. It is the contractor's responsibility to ensure that its employees working on-site at this installation are U. S. citizens or legal aliens with no outstanding warrants. This installation is manned by a DoD Police Force who possesses apprehension authority, which includes holding suspects for local authorities. The local authorities can issue a citation that charges the individual with a specific offense and requires the individual to appear before a Federal Magistrate. This agency processes illegal aliens in accordance with INS instructions.
MARK CONTRACT NUMBER ON ALL CORRESPONDENCE
Contractor must mark the contract or purchase order number on all paperwork and shipments. The order number must appear on the exterior of the shipment. Failure to follow these instructions will hold up payment to you and could result in the return of merchandise at your expense.
THE FOLLOWING CLAUSES ARE HEREBY INCORPORATED BY REFERENCE:
FAR 52.203-3 – Gratuities (APR 1984) FAR 52.203-12- Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) FAR 52.204-4 - Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) FAR 52.204-9 – Personal Identity Verification of Contractor Personnel (JAN 2011) FAR 52.215-21 – Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications, ALT IV (OCT 2010)
FAR 52.222-46 – Evaluation of Compensation for Professional Employees (FEB 1993) FAR 52.223-5 – Pollution Prevention and Right-to-know Information (MAY 2011) FAR 52.223-10 – Waste Reduction Program (MAY 2011) FAR 52.227-1- Authorization and Consent (DEC 2007) FAR 52.228-5 – Insurance – Work on a Government Installation (JAN 1997) FAR 52.232-17- Interest (OCT 2010) FAR 52.232-40 – Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) FAR 52.233-1 – Disputes (JUL 2002) FAR 52.237-2 – Protection of Government Buildings, Equipment, and Vegetation (APR 1984) FAR 52.242-13 – Bankruptcy (JUL 1995) DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials (SEP 2011) DFARS 252.204-7000 Disclosure of Information (AUG 2013)
PAGE 12 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-14-R-0002
http://www.cpars.csd.disa.mil/allapps/cpartrng/documents/CPARS%20Presentation.pdf http://www.cpars.csd.disa.mil/
DFARS 252.204-7003 Control of Government Personnel Work Product (APR 1992) DFARS 252.205-7000 Provision of Information to Cooperative Agreement Holders (DEC 1991) DFARS 252.209-7004 Subcontracting with Firms That Are Owned or Controlled by the Government of a Terrorist Country. (DEC 2006) DFARS 252.223-7004 Drug Free Workforce (SEP 1988) DFARS 252.223-7006 Prohibition on Storage and Disposal of Toxic and Hazardous Material (APR 2012) DFARS 252.225-7012 Preference for Certain Domestic Commodities (FEB 2013) DFARS 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns (SEP 2004) DFARS 252.232-7010 Levies on Contract Payments (DEC 2006) DFARS 252.243-7002 Requests for Equitable Adjustment (DEC 2012) DFARS 252.247-7023 Transportation of Supplies by Sea (JUN 2013)
THE FOLLOWING CLAUSES ARE HEREBY INCORPORATED BY FULL TEXT:
FAR 52.217-8 – OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of Clause)
FAR 52.217-9 – OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
(End of Clause)
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil (End of Clause)
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING
REPORTS (JUN 2012)
(a) Definitions. As used in this clause—
(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(4) “Receiving report” means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
PAGE 13 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-14-R-0002
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252246.htm https://wawf.eb.mil/
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(End of clause)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
_________________2-in 1 Invoice__________________________________________ (Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SL4701 Issue By DoDAAC SP3300 Admin DoDAAC SP3300 Inspect By DoDAAC N/A Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) SP3300 Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
PAGE 14 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-14-R-0002
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause) DFARS 252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING AND CERTIFICATIONS (JAN 2008)
(a) The Contractor shall ensure that personnel accessing information systems have the proper and current information assurance certification to perform information assurance functions in accordance with DoD 8570.01-M, Information Assurance Workforce Improvement Program. The Contractor shall meet the applicable information assurance certification requirements, including—
(1) DoD-approved information assurance workforce certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; and
(2) Appropriate operating system certification for information assurance technical positions as required by DoD 8570.01-M.
(b) Upon request by the Government, the Contractor shall provide documentation supporting the information assurance certification status of personnel performing information assurance functions.
(c) Contractor personnel who do not have proper and current certifications shall be denied access to DoD information systems for the purpose of performing information assurance functions.
(End of clause)
DLAD 52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (MAR 2012)
(a) Work to be performed under this contract or task order may, in full or in part, be performed at the Defense Logistics Agency (DLA) Headquarters (HQ) or other DLA field activity office(s), with physical access to a Federally-controlled facility. Prior to beginning work on a contract, DLA and its field activity offices require all contractor personnel working on the Federally-controlled facility to have a favorably adjudicated National Agency Check with Written Inquiries (NACI) or NACI equivalent.
(b) Additionally, in accordance with Department of Defense (DoD) Regulation 5200.2-R, Personnel Security Programs, and DLA Issuance 4314, Personnel Security Program, all DoD Contractor personnel who have access to Federally-controlled information systems must be assigned to positions which are designated at one of three information technology (IT) levels, each requiring a certain level of investigation and clearance, as follows:
(1) IT-I for an IT position requiring a Single Scope Background Investigation (SSBI) or SSBI equivalent;
(2) IT-II for an IT position requiring a National Agency Check with Law and Credit (NACLC) or NACLC equivalent; and
(3) IT-III for an IT position requiring a NACI or equivalent.
Note: IT levels will be designated according to the criteria in DoD 5200.2-R.
(c) Previously completed security investigations may be accepted by the Government in lieu of new investigations if determined by the DLA Intelligence Personnel Security Office to be essentially equivalent in scope to the contract requirements. The length of time elapsed since the previous investigation will also be considered in determining whether a new investigation is warranted. To assist the Government in making this determination, the Contractor must provide the following information to the respective DLA Personnel Security Office immediately upon receipt of the contract. This information must be provided for each Contractor employee who will perform work on a Federally-controlled facility and/or will require access to Federally-controlled information systems:
(1) Full name, with middle name, as applicable, with social security number;
(2) Citizenship status with date and place of birth;
(3) Proof of the individual’s favorably adjudicated background investigation or NACI, consisting of identification of the type of investigation performed, date of the favorable adjudication, and name of the agency that performed the investigation;
(4) Company name, address, phone and fax numbers with email address;
(5) Location of on-site workstation or phone number if off-site (if known by the time of award); and
(6) Delivery order or contract number and expiration date; and name of the Contracting Officer.
(d) The Contracting Officer will ensure that the contractor is notified as soon as a determination is made by the assigned or cognizant DLA Personnel Security Office regarding acceptance of the previous investigation and clearance level.
(1) If a new investigation is deemed necessary, the Contractor and Contracting Officer will be notified by the respective DLA Personnel Security Office after appropriate checks in DoD databases have been made.
(2) If the Contractor employee requires access to classified information and currently does not have the appropriate clearance level and/or an active security clearance, the DLA Personnel Security Office will relay this information to the Contractor and Contracting Officer for further action.
(3) The Contracting Officer will ensure that the respective DLA Personnel Security Office initiates the investigation for the required clearance level(s) of the Contractor personnel.
(4) It is the Contractor’s responsibility to ensure that adequate information is provided and that each Contractor employee completes the appropriate paperwork, as required either by the Contracting Officer or the DLA Personnel Security Office, in order to begin the investigation process for the required clearance level.
PAGE 15 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(e) The Contractor is responsible for ensuring that each Contractor employee assigned to the position has the appropriate security clearance level.
(f) The Contractor shall submit each request for IT access and investigation through the contracting officer to the assigned or cognizant DLA Personnel Security Office. Requests shall include the following information and/or documentation:
(1) Standard Form (SF) 85, Questionnaire for Non-Sensitive Positions, or the SF 86, Questionnaire for National Security Positions (see note below);
(2) Proof of citizenship (i.e., an original or a certified copy of a birth certificate, passport, or naturalization certificate); and
(3) Form FD-258, fingerprint card (however, fingerprinting can be performed by the cognizant DLA Personnel Security Office).
(Note to (f)(1) above: An investigation request is facilitated through use of the SF 85 or the SF 86.
These forms with instructions as well as the Optional Form (OF) 306, Declaration for Federal Employment, which is required with submission of the SF85 or SF 86, are available at the Office of Personnel Management’s (OPM) system called Electronic –Questionnaires for Investigations Processing (e-QIP). Hard copies of the SF85 and SF86 are available at OPM’s web-site, www.opm.gov, but hard copies of the forms are not accepted.)
(g) Required documentation, listed above in paragraphs (f) (1) through (3), must be provided by the Contractor as directed by the Contracting Officer to the cognizant DLA Personnel Security Office at the time of fingerprinting or prior to the DLA Security Office releasing the investigation to the Office of Personnel Management.
(h) Upon completion of the NACI, NACLC, SSBI, or other sufficient, appropriate investigation, the results of the investigation will be forwarded by the office performing the investigation to either the appropriate adjudication facility for eligibility determination or the DLA Intelligence Security Division for review and determination regarding the applicant’s suitability to occupy an unescorted entry position in performance of the DLA contract. Contractor personnel shall not commence work on this effort until the investigation has been favorably adjudicated or has been waived into the position pending completion of adjudication. The DLA Intelligence Personnel Security Office will ensure that results of investigations will be sent by the office performing the investigation to the Defense Industrial Security Clearance Office (DISCO) or DLA Intelligence Personnel Security Office.
(i) A waiver for an IT-I or IT-II position to allow assignment of an individual Contractor employee to commence work prior to completion of the investigation may be granted in emergency situations when it is determined that a delay would be harmful to national security. A request for waiver will be considered only after the Government is in receipt of the individual Contractor employee’s completed forms.
The request for a waiver must be approved by the Commander/Director or an authorized representative of the site. The cognizant DLA Personnel Security Office reserves the right to determine whether a waiver request will be forwarded for processing, however, there will be no waiver for an IT-III position. The individual Contractor employee for which the waiver is being requested may not be assigned to a position, that is, physically work at the Federally-controlled facility and/or be granted access to Federally-controlled information systems, until the waiver has been approved.
(j) The requirements of this clause apply to the prime Contractor and any subcontractors the prime Contractor may employ during the course of this contract, as well as any temporary employees that may be hired by the Contractor. The Government retains the right to request removal of Contractor personnel, regardless of prior clearance or adjudication status whose actions, while assigned to this contract, who are determined by the Contracting Officer to conflict with the interests of the Government. If such removal occurs, the Contractor shall assign qualified personnel, with the required investigation, to any vacancy.
(k) All Contractor personnel who are granted access to Government and/or Federally-controlled information systems shall observe all local automated information system (AIS) security policies and procedures as provided by the DLA site Information Systems Security Officer. Violations of local AIS security policy, such as password sharing, performing personal work, file access violations, or browsing files outside the scope of the contract, will result in removal of the Contractor employee from Government property and referral to the Contractor for appropriate disciplinary action. Actions taken by the Contractor in response to a violation will be evaluated and will be reflected in the Contractor’s performance assessment for use in making future source selection decisions. In addition, based on the nature and extent of any violations of AIS security policy, the Government will consider whether it needs to pursue any other actions under the contract such as a possible termination.
(l) The Contractor is also required to obtain a common access card (CAC) for each contractor employee in accordance with procedures established at the DLA HQ or field activity office. When a CAC is required, the Contracting Officer will ensure that the contractor follows the requirements of Homeland Security Presidential Directive 12.
(m) Contractor personnel must additionally receive operations security (OPSEC) and information security (INFOSEC) awareness training. The DLA annual OPSEC refresher training and DLA annual INFOSEC training will satisfy these requirements and are available through the DLA Intelligence Office.
(n) When a Contractor employee who has been granted a clearance is removed from the contract, the Contractor shall provide an appropriately trained substitute who has met or will meet the investigative requirements of this clause. The substitute may not begin work on the contract without written documentation, signed by the Contracting Officer, stating that the new Contractor employee has met one of the criteria set forth in paragraphs (c), (d), or (i) of this clause, (i.e., acceptance of a previously completed security investigation, satisfactory completion of a new investigation, or a waiver allowing work to begin pending completion of an investigation).
Contractor individual employees removed from this contract as a result of a violation of local AIS security policy are removed for the duration of the contract.
(o) The Contractor shall notify the contracting officer in writing, within 12 hours, when a Contractor employee working on this contract resigns, is reassigned, terminated or no longer requires admittance to the Federally-controlled facility or access to Federally-controlled information systems. When the Contractor employee departs, the Contractor will relay departure information to the cognizant DLA
PAGE 16 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
http://www.opm.gov/
Security Office so appropriate databases can be updated. The Contractor will ensure each departed employee has completed the DLA J6 Out-Processing Checklist, when applicable, for the necessary security briefing, has returned any Government-furnished equipment, returned the DoD CAC and DLA (or equivalent) badge, returned any DoD or DLA vehicle decal, and requested deletion of local area network account with a prepared Department of Defense (DD) form 2875. The Contractor will be responsible for any costs involved for failure to complete the out-processing, including recovery of Government property and investigation involved.
(p) These Contractor security requirements do not excuse the Contractor from meeting the delivery schedule set forth in the contract, or waive the delivery schedule in any way. The Contractor shall meet the required delivery schedule unless the contracting officer grants a waiver or extension.
(q) The Contractor shall not bill for personnel, who are not working on the contract while that Contractor employee’s clearance investigation is pending.
(End of Clause)
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (SEP 2013)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS --
COMMERCIAL ITEMS (JAN 2014)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
____ Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.] _X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
_X_ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010) (Pub. L. 111-5).
___ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
__X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013) (31 U.S.C. 6101 note).
__X_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
___ (10) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (May 2012) (section 738 of Division C of Public Law 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).
___ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (13) [Reserved] ___ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011).
___ (iii) Alternate II (Nov 2011).
___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
__X_ (16) 52.219-8, Utilization of Small Business Concerns (Jul 2013) (15 U.S.C. 637(d)(2) and (3)).
___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Jul 2013) (15 U.S.C. 637 (d)(4)).
___ (ii) Alternate I (Oct 2001) of 52.219-9.
___ (iii) Alternate II (Oct 2001) of 52.219-9.
___ (iv) Alternate III (July 2010) of 52.219-9.
___ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
___ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (21) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
PAGE 17 OF 44 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
___ (ii) Alternate I (June 2003) of 52.219-23.
___ (22) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Jul 2013) (Pub. L.
103-355, section 7102, and 10 U.S.C. 2323).
___ (23) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
_X__ (24) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).
_X__ (25) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).
___ (26) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Jul 2013) (15 U.S.C. 637(m)).
___ (27) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Jul 2013) (15 U.S.C. 637(m)).
_X_ (28) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
_X__ (29) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014) (E.O. 13126).
_X__ (30) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
_X__ (31) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
_X__ (32) 52.222-35, Equal Opportunity for Veterans (Sep 2010) (38 U.S.C. 4212).
_X__ (33) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).
_X__ (34) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).
_X__ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
_X__ (36) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
___ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.
6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
___ (39) (i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O.
13423).
___ (ii) Alternate I (Dec 2007) of 52.223-16.
_X__ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011).
___ (41) 52.225-1, Buy American Act--Supplies (Feb 2009) (41 U.S.C. 10a-10d).
___ (42) (i) 52.225-3, Buy American Act--Free Trade Agreements--Israeli Trade Act (Nov 2012) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
___ (ii) Alternate I (Mar 2012) of 52.225-3.
___ (iii) Alternate II (Mar 2012) of 52.225-3.
___ (iv) Alternate III (Nov 2012) of 52.225-3.
___ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X__ (44) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
___ (45) 52.225-26, Contractors Performing Private Security Functions Outside…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .