Attachment_8_Schedule_of_Supplies_or_Services.pdf

PDF 19 KB Posted

Attached to
MHE PREVENTIVE AND REMEDIAL MAINTENANCE
Solicitation number
SP330013Q0075
Issued by

About this file

ATTACHMENT 8 SCHEDULE OF SUPPLIES OR SERVICES

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF SUPPLIES/SERVICES

ITEM NO. DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Firm-fixed-price 0001 Semi-Annual Preventive Maintenance Services for Government

Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).

0001AA Automatic Guided Vehicles (Waves) 2 EA $ $

Firm-fixed-price 0002 Semi-Annual Preventive Maintenance Services for Government

Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (Retail).

0002AA Stock Selector 168" - 218" (4ea) & Stock selector rail guide (1) 5 EA $ $

0002AB Gas Forklift, 4k, prt 180"-187" 1 EA $ $

0002AC Pallet Jack 1 EA $ $

0002AD Electric Forklift 4k Hyster 1 EA $ $

0003 Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (CGA).

0003AA Automatic Guided Vehicles (Waves) 2 EA $ $

0003AB Segways 4 EA $ $

0003AC Electric Scooters 3-4 Wheel 3 EA $ $

0004 Annual Preventive Maintenance Services for Government Owned Material Handling Equipment located at DLA Distribution Barstow, CA. (Retail).

0004AA Stock Selector 168"-218" (4 ea) & Stock Selector Rail Guide (1) 5 EA $ $

0004AB Gas Forklift, 4k, PRT 180"-187" 1 EA $ $

0004AC Pallet Jack 1 EA $ $

0004AD Electric Forklift, 4k, Hyster 1 EA $ $

0004AE Scooter, 3-4 Wheeled 2 EA $ $

0004AF Trailer, Ground 2 EA $ $

BASE YEAR PERIOD - 01 June 2013 through 31 May 2014

SCHEDULE OF SUPPLIES/SERVICES

TIME AND MATERIAL CEILING PRICE

Labor to perform equipment repair in conjunction with Remedial Maintenance. The number of hours shown is an estimate only.

Contractor will only be paid for the actual number of hours worked

0005AA DLA Distribution Barstow, CA (CGA) 200 HR $ $

0005AB DLA Distribution Barstow, CA (Retail) 300 HR $ $

TIME AND MATERIAL CEILING PRICE

0006 Replacement Parts required for equipment repairs in conjunction with Remedial Maintenance. The estimated dollars shown is an estimate based on the Governments best estimate. Contractor will be paid for the actual dollars used.

0006AA DLA Distribution Barstow, CA (CGA) $20,000.00

0006AB DLA Distribution Barstow, CA (Retail) $20,000.00

TIME AND MATERIAL CEILING PRICE

0007 Labor to perform Technical Inspections in accordance with paragraph 3.0 of the Statement of Work. The number of hours shown is an estimate only. Contractor will only be paid for the actual number of hours worked.

0007AA DLA Distribution Barstow, CA (CGA) 10 HR $ $

0007AB DLA Distribution Barstow, CA (Retail) 10 HR $ $

FIRM FIXED PRICE CEILING PRICE

0008 Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 of the Statement of Work. The quantity is an estimate only based on the Governments best estimate and are NOT TO BE EXCEEDED (NTE) without notifying the contracting officer prior to performing this task.

0008AA DLA Distribution Barstow, CA (CGA) 1 UN $ $

0008AB DLA Distribution Barstow, CA (Retail) 1 UN $ $

NTE

Total amount required by each activity:

DLA Distribution Barstow, CA (CGA) $

DLA Distribution Barstow, CA (Retail) $

TOTAL CEILING AMOUNT FOR BASE YEAR PERIOD $

Section B - Schedule

File details come from the government source that posted it. Updated .