SP330012R0033 Amendment 0002.pdf
PDF 51 KB Posted
- Attached to
- Corrugated Box Maker
- Solicitation number
- SP330012R0033
- Issued by
-
Defense Logistics Agency Distribution
About this file
SP3300-12-R-0033 Amendment 0002
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP3300 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP330012R0033
X
2012 AUG 22
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA DISTRIBUTION
OFFICE OF PROCUREMENT - EBS
2001 MISSION DRIVE
NEW CUMBERLAND PA 17070-5000
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
2012 SEP 07
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
1. The purpose of this amendment is to provide an answer to a vendor question. The question submitted is as follows:
Section 2.1.E references the attachment of std. practices for fabrication and closure of cartons.
Are there any additional attachments available other than the statement of work?
2. The Government is providing the following answer in response to this question:
This amendment will provide several attachments relevant to the Statement of Work (SOW) Section 2.1E.
Specifically under SOW Section 2.1E three (3) attachments are now included for standard practices for fabrication and closure of single, double, and triple wall corrugated fiberboard construction. The SOW Section 2.1E language is as follows: The requirements for corrugated box maker shall produce containers utilizing weather resistant corrugated fiberboard sheet stock meeting established criteria in ASTM-D-4727 V3C single wall, ASTM-D-5118 V11c double wall, and ASTM-D-5168 1100 triple wall bursting strength standards. Note:
Attachments are included for standard practices for fabrication and closure of single, double, and triple wall corrugated fiberboard construction. The attachments for producing containers in accordance with ASTM-D-4727 V3C single wall, ASTM-D-5118 V11c double wall, and ASTM-D-5168 1100 triple wall bursting strength standards are now incorporated into the SOW via this amendment.
3. The solicitation closing date/time HAS NOT been changed as a result of this amendment.
4. There are no other changes to the solicitation via this amendment.
PAGE 2 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP330012R0033-0002
Attachments
List of Attachments
Description File Name
SP330012R0033 SOW
Attachment ASTM-D- 4727-98
SP330012R0033 SOW
Attachment ASTM-D- 4727-98 Amendment 0002.pdf
SP330012R0033 SOW
Attachment ASTM-D- 5118M
SP330012R0033 SOW
Attachment ASTM-D- 5118M Amendment 0002.pdf
SP330012R0033 SOW
Attachment ASTM-D-
SP330012R0033 SOW
Attachment ASTM-D- 5168 Amendment 0002.pdf
PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP330012R0033-0002
| Word Bookmarks |
| Word Bookmarks |
| 3 |
File details come from the government source that posted it. Updated .