Attachment 2 QASP.docx

DOCX document 29 KB Posted

Attached to
Enclave Border Protection Support Services
Solicitation number
SP3300-12-R-0030
Issued by

About this file

Attachment 2 QASP

View the file

Other files

File Type Posted
SP3300-12-R-0030-0002.pdf PDF
SP3300-12-R-0030-0001.pdf PDF
Attachment 1 PWS .docx DOCX document
Attachment 8 5.2 - CE Matrix and Certs.pdf PDF
Attachment 7 5.1 - IA Certs Matrix.pdf PDF
Attachment 3 DD254.pdf PDF
Attachment 6 2.1 - IA Technical CE Functional Definitions.pdf PDF
Attachment 5 Past Performance Questionnaire.docx DOCX document
SP3300-12-R-0030.pdf PDF
Attachment 4 DD254 Continuation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-12-R-0030

Attachment 1

Quality Assurance Surveillance Plan for Enclave Border Protection Support Services

AT

DLA INFORMATION OPERATIONS AT NEW CUMBERLAND, PENNSLYVANIA

A. The Quality Assurance Surveillance Plan (QASP) is the Government’s plan to ensure the Contractor provides the required support services, and adheres to the quality standards as specified in the PWS. Both the Contractor and the Government will agree to the terms of the contract. During the life of the contract, administrative procedures such as inspections, documentation and retention of records, which reflect the Contractor’s performance, will be retained.

B. The Contractor shall also maintain all records of performance for a minimum of six (6) months after the completion of this contact.

C. The Contracting Officer’s Representative (COR) will monitor performance to ensure services are received and carried out in accordance with the standards set forth in the PWS. This monitoring shall be done via Government inspection and review of the various reports and documentation generated in performance of the support requirements. This QASP will be used to monitor compliance with contract terms and conditions, identify nonconforming services to determine appropriate action. This plan sets forth the method and manner by which the Government intends to conduct surveillance of work under the contract, and is subject to the unilateral change by the Government without modification of the contract. All work required by the contract is subject to surveillance whether or not specifically included in the plan. When the Contractor performance fails to achieve the acceptable performance level and is clearly the fault of the Contractor, the COR will prepare a Contract Discrepancy Report (CDR) and forward it to the Contracting Officer (KO) to issue to the Contractor. In response to the CDR, the Contractor shall explain within seven working days, in writing, why performance was unacceptable, how performance will be returned to acceptable levels and how recurrence of the problem will be prevented in the future. The KO will evaluate the Contractor’s explanation and determine the appropriate action(s).

1. Inspections: The COR is responsible for technical oversight of the Contractor’s performance. The COR’s duties shall include, but are not limited to, assurance of the completion of work in a quality manner, resolution of quality concerns, and payment for services rendered. This responsibility includes the determination of adequacy of services performed by the contractor in accordance with the terms and conditions of the contract. The COR will perform all inspections on behalf of the Government and will confer with the Contractor regarding any problems encountered in the performance of the work.

2. Deficiencies: Once an inspection has been conducted, the Contractor and KO will be notified via electronic mail of its results. All inspections will be documented on a pass/fail basis. When a failed inspection occurs, the Contractor shall be allowed the time to correct all noted deficiencies. The Contractor should resolve the deficiencies as documented by the COR in the failed inspection report. The COR will perform a re-inspection and further assess the area or item of concern once again on a pass/fail basis.

3. Re-Performance of Work: When the Contractor re-performs services as a result of the inspections defined in this section, and the contractor does not meet the standards identified in the SOW, the Government may desire that the work be re-performed prior to the completion of the contract. If this is the case, the Contractor shall perform the service at no additional cost to the Government.

4. Performance Measures. Performance Measures will be assessed on a Pass and Fail Grading System as defined below:

Rating
Definitions
Pass
When performance complies with the SOW
Fail
When performance does not comply with the SOW

D. Method of Surveillance. There are various surveillance methods used to monitor contract performance and compliance. When selecting the appropriate method, the COR will take into consideration task criticality, task complexity, time available, mission requirements. The following is the preferred method of surveillance that will be used to assess contract performance under this contract: 100% inspection of all Contractor generated documentation will be conducted for quality and timeliness.

E. Procedures. The COR will perform inspections to ensure Contractor compliance with the appropriate paragraphs in the PWS, other government requirements, and the Contractor’s own procedures, and will record the results of the inspections, noting the date and time. If inspection indicates a performance level is not met, the KO will notify the Contractor of the deficiency for correction. The Contractor will be given a reasonable time after notification to correct the unacceptable performance. The length of time allowed to correct the problem will depend upon the requirement, complexity of corrective action(s) and the deficiency. The Contractor will notify the KO if the time allowed for correction is not adequate. The COR will not consider the correction action(s) until all deficiencies have been corrected and determined by the COR to be adequate (Government follow-up). Contractor non-responsiveness, deficiencies not adequately addressed or corrected after notification of such, or estimated dates of completion that are not acceptable to the COR will be forwarded to the KO for action.

F. The chart below provides timely and quality performance standards for specific requirements already stated in the PWS:

Deliverable
Standard
Acceptable Performance Level
Method of Surveillance
Maintain Enclave Border Protection Capabilities and Control for DLA Information Operations Local Area Networks
100% uptime during business hours
The Weighted Network Downtime (WND) for the Local Area Network will be maintained at 1 hour or less per month during core hours
COR review and verification; inspections, monitoring, record keeping; analyzing sample of data customer complaints
Provide resources to manage and maintain the DLA Information Operations Enclave Border Protection Environment consisting of firewalls, intrusion detection systems and virtual private network devices
100% of patches installed within DLA-specified time limits
At least 95% of all network patches are installed within DLA-specified time limits.
COR review and verification; inspections, monitoring, record keeping; analyzing sample of data; customer complaints
Respond/Correct and investigate/report cyber security incidents in a timely manner
100%
Responds/Corrects within 24 hours from occurrence and investigates/reports within five business days from occurrence at least 95% of the time.
COR review and verification; inspections, monitoring, record keeping; analyzing sample of data; customer complaints
Required documentation / reports
98% of documentation / reports are submitted to the COR or designee within the designated time period
Timeliness – No more than three (3) missed due dates within the period of performance.
Review of reports by the COR

File details come from the government source that posted it. Updated .