Devens RFTA NOO- SP060424R0418.pdf
PDF 225 KB Posted
- Solicitation number
- SP0604-24-R-0418
- Issued by
-
Defense Logistics Agency Energy
About this file
This document is a Notice of Opportunity (NOO) for an Energy Savings Performance Contract (ESPC) task order at the Devens Reserve Forces Training Area in Devens, MA. The Defense Logistics Agency (DLA) Energy, on behalf of Devens RFTA, plans to award an ESPC task order using the Department of Energy's (DOE) Fourth Generation ESPC Indefinite Delivery Indefinite Quantity (IDIQ) contract.
Only the current 20 DOE Fourth Generation ESPC IDIQ contract holders (Energy Service Companies) are eligible to submit a response to this NOO. Responses must be received by August 12, 2024 at 3:00pm Fort Belvoir, VA time and submitted via email to DLAEnergy-ESPC@dla.mil. The NOO provides details on the submission requirements, including page limitations and formatting instructions. Responses will be evaluated on ESCO Approach, Past Performance, and Price, with Approach being the most important factor. The Government intends to award one ESPC task order as a result of this NOO but reserves the right not to make an award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1- Site Data Package.pdf | ||
| Attachment 1- Site Data Package.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice of Opportunity Devens RFTA, MA
Notice of Opportunity Devens Reserve Forces Training Area, Devens, MA
Energy Savings Performance Contract (ESPC) Task Order Under the Department of Energy’s (DOE) Fourth Generation
ESPC Indefinite Delivery Indefinite Quantity (IDIQ) Contract Solicitation: SP0604-24-R-0418
1. Notice: The Defense Logistics Agency (DLA) Energy, on behalf of Devens Reserve Forces
Training Area (RFTA), hereby referred to as ‘Devens RFTA’ plans to award an ESPC Task Order (TO) using the DOE Fourth-Generation ESPC IDIQ contract. DLA Energy invites the current 20 DOE Fourth-Generation ESPC IDIQ contract holders (also referred to as Energy Service Companies (ESCOs), to submit a written response to this Notice of Opportunity (NOO) for DLA Energy’s consideration. Only those 20 DOE Fourth-Generation ESPC IDIQ contract holders/ESCOs are eligible for award. To be clear, in the event of a resultant TO award, the award will only be made to one (1) of the 20 DOE Fourth-Generation ESPC IDIQ contract holders/ESCOs as the prime contractor.
2. Authority: The DLA Energy authority is in accordance with 42 U.S.C. §8287, the Federal
Acquisition Regulation (FAR) 23.205 “Energy-savings performance contracts”, Energy Policy Act of 1992 (EPAct), and DOE Final Rule, 10 CFR 436 Subpart B – Methods and Procedures for Energy Savings Performance Contracting and Energy Policy Act of 1992 (EPA, April 10, 1995).
3. Project Approach:
Devens RFTA is looking for a comprehensive project to achieve progress toward a reduction energy intensity, progress toward Carbon Free Energy (CFE) goals in line with Executive Order (EO) 14057: Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability, address the installation’s most pressing mission-level gaps and resiliency needs that impact crucial facilities to ensure energy security and resilience in line with 10 USC § 2911, and address specific infrastructure deficiencies, in line with 42 U.S.C. § 8287 utilizing the DOE Fourth-Generation ESPC IDIQ contract. In implementing EO 14057, each agency shall prioritize actions to achieve carbon pollution-free electricity goals, achieve net-zero emissions, and reduce greenhouse gasses to reduce waste, cut costs, enhance the resilience of Federal infrastructure and operations, and enable more effective accomplishment of its mission. By enhancing energy assurance, Devens RFTA will make progress towards meeting Army Reserve Installation Management Directorate (ARIMD) and Federal mandates to address its most pressing mission-level resilience needs that impact the critical facilities at Devens RFTA. The selected ESCO will be required to coordinate and work together with the base’s electrical privatization contractor, to ensure any measures don’t impinge on the privatized electrical system or other ongoing projects currently under execution at Devens RFTA. ESCO shall provide an approach on how they will mitigate cost impacts to the UP provider. To achieve its energy conservation goals, Devens RFTA is interested in any Energy Conservation Measure (ECM) and/or Water Conservations Measure (WCM) defined in Attachment J-3 of the DOE Fourth-Generation ESPC IDIQ contract, with the exception of two (2) technical categories: TC.15 – Energy Cost Reduction through Rate Adjustments, and TC.20 – Future ECMs. Devens RFTA, along with any other ESCO-identified opportunity authorized under the DOE Fourth-Generation ESPC IDIQ, is specifically interested in evaluating ECMs and WCMs focused on the following objectives:
renewable energy generation to include geothermal with the potential of energy storage and microgrid; electrification; water conservation; infrastructure improvements; and the potential for net-zero buildings and deep energy retrofits.
The selected ESCO shall be responsible for the operation, maintenance, repair and replacement of all installed ECMs and WCMs for the life of the contract, pursuant to the DOE Fourth-Generation ESPC IDIQ and any resultant TO, and as required by 42 U.S.C. § 8287. Be advised that the resultant project shall be accomplished in compliance with Department of Army Guidance to Implement Energy Savings Performance Contract along with the current version of UFC 4-010-06 Cybersecurity of Facility Related Control Systems.
Attachment 1 – Devens RFTA Building Data provides the buildings available for inclusion in the project scope and their pertinent data and available energy consumption information. Available for inclusion in the project scope at this time are 313 buildings encompassing 1,074,356 square feet at Devens RFTA. This information is offered only for project scoping potential in response to this NOO. The Government may remove or consider additional buildings at Devens RFTA during the project development phase, and include such added buildings in any resultant project upon the receipt of a good business case analysis that illustrates a benefit to the Government.
The selected ESCO will be required to develop a formal Preliminary Assessment (PA) and Investment Grade Audit (IGA), as applicable, in accordance with the DOE Fourth Generation ESPC IDIQ. The selected ESCO shall be responsible for determining the actual energy consumption during the PA and IGA phases. The selected ESCO shall review each building during the PA and illustrate its Measurement & Verification (M&V) approach.
Pursuant to the DOE Fourth-Generation ESPC IDIQ, Section C.12, Financial, Tax, or
Other Incentives for Energy Efficiency and Renewable Energy and Water Projects, any credits, rebates, and incentives from the Government, utility companies, and private companies shall be pursued by the ESCO to the maximum extent practicable. The selected ESCO shall also be responsible for assisting the installation in submitting any and all documentation for applicable incentives and possible funding (e.g., AFFECT Grant, ERCIP funding, etc.) to assist in the financial viability of this project.
4. Submission Requirements:
The DOE Fourth-Generation ESPC IDIQ will be the contracting vehicle used to implement this energy conservation project. DLA Energy, on behalf of Devens RFTA, invites the 20 current DOE Fourth-Generation ESPC IDIQ contract holders/ESCOs to submit a written response to this NOO for consideration. This NOO constitutes your opportunity to be considered for this potential project. A site visit will not be offered as part of the down-selection process.
a. Response Preparation Instructions:
(1) Document Submission:
Responses must be completed and submitted to the following email mailbox:
DLAEnergy-ESPC@dla.mil. The maximum size limit for any email is 10MB. It is the submitting ESCO’s responsibility to ensure and confirm its response is delivered in its entirety, in accordance with the submission requirements, by the required date and time specified herein. Facsimile and/or hard-copy responses to this NOO are not acceptable.
Late responses will only be considered as authorized by the Federal Acquisition Regulation.
Any formal communications, such as requests for clarifications and/or information concerning this NOO, must be submitted to the above email address no later than 26 July, 2024, 3:00 p.m. Ft. Belvoir, VA time.
To assure timely and equitable evaluation of responses, ESCOs must follow the instructions contained herein. ESCOs are required to meet the requirements of the DOE Fourth-Generation ESPC IDIQ, the NOO, and all attachments thereto to include any terms and conditions, representations and certifications, and technical requirements.
Failure to meet a requirement may result in a response being ineligible for selection.
(2) Page Limitations and Number of Copies:
Page limitations for each eligible ESCO’s response are stated in paragraph (6) below. If page limitations are exceeded, the excess pages will not be considered as part of the evaluation of the submitted response. Each page shall be counted except the following:
cover page, blank pages, tables of contents, tabs and glossaries, and those parts of the response noted herein as exempt from the page limitations.
(3) Page Size and Format:
A page is defined as the electronic equivalent of a single side of a sheet of paper containing information. Page size shall be 8.5 x 11 inches. The draft TO-4 schedule may be submitted as an 11x17 document and will not count toward the page limit requirements. Pages shall be single-spaced. Except for the reproduced sections of the NOO and its attachments, if needed, the text size shall be no less than 12 point. For tables, charts, graphs and figures, the text shall be no smaller than 10 point. Use at least 1 inch margins on the top and bottom and ¾ inch side margins. Pages shall be numbered sequentially.
The response shall be submitted in a format readable by Microsoft (MS) Word 2007®, MS Excel 2007®, MS-Power Point 2007®, Micro-Soft Office XP®, or Adobe Acrobat, as applicable, and conform to the requirements listed above. Legible tables, charts, mailto:DLAEnergy-ESPC@dla.mil graphs and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc.
(4) Indexing:
To the greatest extent possible, indexing shall be used to readily identify information contained in the response. The response shall contain a detailed table of contents to delineate the paragraphs, subparagraphs, etc. Tab indexing shall be used to identify sections. Indexing and tabbing pages shall not count against the page limitations. Any information included on these tab or index pages outside of the realm of a tab or index intent shall not be considered. All .pdf documents shall include electronic bookmarks marrying section or tabs accordingly.
(5) Glossary of Abbreviations and Acronyms:
The response shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. Glossaries do not count against the page limitations.
(6) Response Requirements
The ESCOs are responsible for verifying the completeness and accuracy of all information furnished to them by the Government. Failure to include all information requested may adversely affect the evaluation and may result in a response being ineligible for consideration. Responses to this NOO must be received no later than 12 August, 3:00 p.m. Ft. Belvoir, VA time. All interested and eligible ESCOs shall submit the following in order to be considered:
Factor 1 – ESCO Approach: (Fifteen (15) single-sided pages maximum)
The ESCO’s response to this factor shall include sufficient information to identify and describe the ESCO’s project management capabilities, general approach and proposed strategy for this project, addressing the identified ECMs/WCMs in paragraph 3 of the NOO.
To qualify as an ECM under this NOO and any resultant TO award, any ECM/WCM or component in an ESCO's response must improve energy and/or water efficiency consistent with 10 CFR § 436.31 and otherwise meet the definition of ECM as defined in the DOE Fourth-Generation ESPC IDIQ. The Government is not seeking a response similar to a PA.
The Government is only looking for a reasonably illustrated approach as to how the ESCO would pursue energy conservation efforts to meet Devens RFTA’s needs. The response shall present the following:
a) ESCOs shall present the ESCO’s management capabilities and personnel qualifications related to Devens RFTA’s facility characteristics and the project objectives to a) manage the design, construction, and continued performance of ECMs/WCMs in efficient and cost-effective manner; b) management style and capacity for resources as demonstrated through the organization and critical project personnel.
b) ESCOs shall present the ESCO’s approach to its investigation and development of its recommended ECMs/WCMs for Devens RFTA culminating in the scope of work for this project. The ESCO shall provide its rationale for each ECM/WCM recommended and the determining factors that led to the recommendation. The response must provide clear and convincing evidence as to why and how the selected ECM/WCM(s) will meet the needs of Devens RFTA. The ESCO shall draw upon and reference information provided in Attachment 1- Devens RFTA Building Data for the development of its response, as well any applicable industry standards and all other information reasonably available. In addition, the ESCO shall submit a draft Task Order Schedule 4, Performance Period First Year Estimated Cost Savings, by ECM/WCM illustrating the ESCO’s recommended ECMs/WCMs savings, less the ECMs/WCMs’ associated implementation costs. Any included industry standards may be submitted in 11x17 size and format to improve readability, which does not count against the page limit for Factor 1. Any ESCO’s assumptions utilized in the development or selection of ECMs/WCMs shall be clearly presented and highlighted in its response.
3) ESCOs shall include a discussion of resources it intends to utilize during the project, as well as the use of small businesses and subcontracting or teaming arrangements to be established if selected.
Factor 2 – Past Performance: (One (1) single-sided page maximum)
The ESCO’s response to this factor shall include three (3) references illustrating the ESCO’s past performance as the prime contractor or prime subcontractor on any ESPC or Utility Energy Service Contracting (UESC) project. The ESCO shall provide a brief project description, the agency/owner point of contact (name, title, phone number, and email address), location of each project, contract number, date of task order or contract award, and actual or anticipated project construction completion date. The Government will use its discretion to determine the sources of past information used in the Past Performance evaluation. The information may be obtained from the Government’s knowledge of contractor performance, other government agencies or commercial entities, or past performance databases. It is not a requirement that the ESCO have past performance history in the execution of its recommended ECMs for this project. The DOE Fourth Generation ESPC IDIQ has already determined each ESCO responsible for the sound implementation of each of the technical categories.
Factor 3 – Price: (Five (5) single-sided pages maximum)
The ESCO shall provide a narrative discussing and defining any cost benefit or other financial advantage its company can provide that would minimize the project cost to the
Government. The discussion of each benefit or advantage must identify, at a minimum, a percentage discount to the implementation costs that are recommended. Be advised that the ESCO will not be held to this exact percentage if selected, however, will be held to the fulfillment of the concept. It is expected and accepted that during the development of the project scope and finalization of all attributes of the project during the Investment Grade Audit that further definitization will occur.
The Government is not looking for a cost breakdown of the project visualized in response to Factor 1. The Government seeks to understand the ESCO’s practices and ardent pursuant of any financial benefits that will assist in bringing the implementation cost of the final project down while at the same time not eroding or compromising the success of the project.
3. Evaluation Methodology
a. Basis for Selection:
Task Order down-selection procedures, as set forth in the DOE Fourth-Generation ESPC IDIQ, paragraph H.3, will be used to make an integrated assessment for a best fit decision for ESPC services at a firm-fixed price. Responses will be evaluated using the following three factors:
1) ESCO Approach;
2) Past Performance; and
3) Price.
Factor 1, ESCO Approach, is of more importance to Factor 2, Past Performance. Factor 1 and Factor 2 when combined are more important than Factor 3, Price.
The resultant TO may be awarded to the responsible ESCO that provides the best fit in achieving energy and water assurance, reduction of energy and/or water use intensity, and increased use of renewable energy and energy production for Devens RFTA. Best fit means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in satisfying the requirement and represents the best value to the Government in consideration of the ESCO’s approach, ESCO’s experience, past performance, and price. The Government will provide notifications in accordance with the DOE Fourth-Generation ESPC IDIQ, paragraph H.3.7 Notification of Contractors Not Selected.
b. Number of Contracts to be Awarded:
The Government intends to award one (1) resultant TO for this requirement. However, the Government reserves the right not to award a TO at all.
Attachments:
1. Devens RFTA Building Data
File details come from the government source that posted it. Updated .