This amendment modifies solicitation SP0604-24-R-0400 for an energy savings performance contract at Hill Air Force Base in Utah. The Defense Logistics Agency Energy issued the solicitation and is seeking energy conservation measures to be implemented at buildings that were part of a previous 2018 energy savings performance contract. Responses to questions clarify that offerors are not required to provide individual cost estimates, total project costs, or simple paybacks for the task order schedule. Additionally, the amendment confirms that buildings highlighted in blue on an attachment are included in the current scope of work and were part of the 2018 energy savings project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Previous Edition Unusable STANDARD FORM 30 (REV. 11-2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
K
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
See Block 16B
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE SP0604 7. ADMINISTERED BY (If other than Item 6) CODE SP0604
DEFENSE LOGISTICS AGENCY ENERGY
DLA Energy–FEA
8725 JOHN J. KINGMAN ROAD, STP 3950
FORT BELVOIR, VA 22060-6222
BUYER/SYMBOL: Steven M Slater/DLA Energy-FEABB
PHONE: (571)585-7035
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
DUNS# Cage Code:
(X) 9A. AMENDMENT OF SOLICITATION NUMBER
Notice of Opportunity/SP0604-24-R-0400
9B. DATED (SEE ITEM 11)
27 OCT 2023
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
Choose an item
10B. DATED (SEE ITEM 13)
Click or tap to enter a date. CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
☒The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ☐ is extended. ☒ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) See Section G
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A. ☐
☐ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
☐ C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
☐ D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ☐ is not ☒ is required to sign this document and return 1 copies to the issuing office
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
HILL AFB OO-ALC SOLICITATION SP0604-24-R-0400
The intention of this amendment is to address RFI questions about solicitation SP0604-24-R-0400.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
KEITH A. CARVALHO
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
See Block 16B
SP0604-24-R-0400
Amendment 0001
FIRST: The following RFI questions has been received from industry for solicitation SP0604-24-R- 0400 and is addressed by the Government:
1. RFI QUESTION: “Can DLA please confirm that, per Factor 1, letter b, DLA is not requiring a cost per ECM, a total project implementation cost, or a simple payback for the TO Schedule 4?”
1. RFI RESPONSE: Yes, that is correct and as noted in the NOO "LESS the ECM's associated implementation costs."
2. RFI QUESTION: “Please clarify in attachment 2 that the highlighted buildings in ‘blue’ are included in this NOO and were part of the 2018 ESPC project or a previous ESPC project?”
2. RFI RESPONSE: Yes, attachment 2 highlighted buildings are included in NOO SP0604-24-R- 0400, and were included in an awarded 2018 ESPC Task Order SP0604-18-F-8001.
SECOND: All other terms and conditions remain as previously stated.
END OF AMENDMENT