Solicitation_Ali_Al_Salem_AVGAS_Drums.pdf

PDF 651 KB Posted

Attached to
Aviation Gasoline for Ali Al Salem, Kuwait
Solicitation number
SP0600-15-R-0213
Issued by

About this file

Combined Synopsis/Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP0600-15-R-0213

COMBINED SYNOPSIS/SOLICITATION ISSUED

MARCH 30, 2015

Part: U.S. Government Procurements Subpart:

Supplies, Equipment, and Materials

Class Code: 91 – Fuels, Lubricants, Oils and Waxes

Address of Contracting Office: Defense Logistics Agency, 8725 John J. Kingman Road, Suite 4950, Ft. Belvoir, Virginia 22060-6222, United States of America

Subject: Delivery of AVGAS Product in Drums (NSN 9130-01-531-4426) to Ali Al Salem, Kuwait

Solicitation Number: SP0600-15-R-0213

Responses Due: April 8, 2015 at 3:00 PM local time (Ft. Belvoir, VA) Points of

Contact: Kim Bass, Kimberly.Bass@dla.mil, 703-767-8476

Contracting Officer Point of Contact: Pamela Barber, Pamela.Barber@dla.mil, 703-767-8481

Web Address: http://www.energy.dla.mil

Description of Requirement: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 13.5, as supplemented by additional information included in this notice. This acquisition is unrestricted. This announcement constitutes the only solicitation and additional information will not be provided. Proposals are requested under Request for Proposals (RFP) SP0600-15-R-

0213, for the following:

Aviation Gasoline (100LL) – NSN: 9130-01-531-4426 for delivery in drums to Ali Al Salem in Kuwait. The three-year estimated quantity is 210,000 USG.

The performance period for this requirement is three years. Award date is April 15, 2015 with a period of performance through April 30, 2018. Delivery is FOB Destination.

Offerors shall furnish copies of supplier and transportation commitments/agreements with their offer or be prepared to provide within five working days when requested. Refer to Attachment 2 to the solicitation for commitment letter mailto:Kimberly.Bass@dla.mil mailto:Pamela.Barber@dla.mil http://www.energy.dla.mil/ instructions. DLA Energy may conduct pre-award surveys to determine responsibility regarding the offeror’s transportation, technical, production, financial and quality assurance capabilities.

Offerors shall complete and submit Attachment 1 Fuel Source Data Sheet.

Additional requirements may be added by future amendments to this solicitation.

The Government contemplates award(s) of a Requirements Type, Fixed Price with Economic Price Adjustment resulting from this solicitation. After award, the contract price for this CLIN will escalate/de-escalate monthly in accordance with solicitation provision B-0002- B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA

ENERGY JAN 2012).

Proposals must be received no later than 3:00 PM local time (Ft. Belvoir, VA) on April 8, 2015. Offers may be submitted via email to Kimberly.Bass@dla.mil. Please note the solicitation number SP0600-15-R-0213 in the subject line of the email. Please note that the offeror assumes all risk for any delay in the transmission of their proposals. Any offers received after the above deadline will not be considered. All offerors are encouraged to review FAR 52.212-1

INSTRUCTIONS TO OFFERORS and solicitation provision L-0001 L2.11-4 EMAIL PROPOSALS. All offerors are further encouraged to submit their proposals early.

mailto:Kimberly.Bass@dla.mil

TABLE OF CONTENTS

SECTION B – SUPPLIES/SERVICES AND PRICES/COSTS

B-0001 B1.05 SUPPLIES TO BE FURNISHED (OVERSEAS PC&S) (ALASKA/HAWAII) (DLA ENERGY

JAN 2012)

B-0002 B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012)

SECTION C – DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT

C-0001 C1 SPECIFICATIONS (DLA ENERGY JAN 2012)

C-0002 C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY MAY 2014)

C-0003 C16.15 GASOLINE, AVIATION (GRADES 80/100LL) (DLA ENERGY SEP 2011)

SECTION D – PACKAGING AND MARKING

DLAD 52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM)

(FEB 2007)

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-2 INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996)

DFARS 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

DLAD 52.246-9029 INSPECTION AND ACCEPTANCE POINTS (APR 2010)

DLAD 52.246-9081 CERTIFICATE OF CONFORMANCE (DLA Energy) (NOV 2011)

E-0001 E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY SEP 2013)

E-0002 E4 INSPECTION (DLA ENERGY DEC 2011)

E-0003 E21.01 POINT OF INSPECTION (DLA ENERGY APR 2010)

E-0004 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY JUL

2013)

E-0005 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

E-0006 E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA WORKFLOW

(WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY AVIATION FUEL)

(DLA ENERGY JUL 2014)

SECTION F – DELIVERIES AND PERFORMANCE

FAR 52.211-16 VARIATION IN QUANTITY (APR 1984)

FAR 52.247-34 F.O.B. DESTINATION (NOV 1991)

F-0001 F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND

TANK WAGONS (DLA ENERGY JAN 2012)

F-0002 F1.09-8 DETERMINATION OF INVOICE QUANTITY (PC&S) (MIDDLE EAST) (DLA ENERGY

SEP 2005)

F-0003 F3 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION

RATES (PC&S) (DLA ENERGY AUG 2005)

F-0004 F3.03 NOTIFICATION OF CHANGE IN TRANSPORTATION COMPANY (PC&S) (DLA ENERGY

APR 2005)

F-0005 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY) (APR 2014)

F-0006 F4 DELIVERY AND ORDERING PERIODS (DLA ENERGY JUN 2002)

F-0007 F30.01 ORDERING AND PAYING OFFICERS (OVERSEAS PC&S) (DLA ENERGY APR 1998) 31

F-0008 F51 SHIPMENT AND ROUTING (OVERSEAS) (DLA ENERGY NOV 2005)

SECTION G - CONTRACT ADMINISTRATION DATA

FAR 52.204-6 DATA UNIVERSAL NUMBERING SYSTEM NUMBER (Jul 2013)

FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD

MANAGEMENT (JUL 2013)

FAR 52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER –OTHER THAN SYSTEM FOR

AWARD MANAGEMENT (JUL 2013)

FAR 52.232-35 DESIGNATION OF OFFICE FOR GOVERNMENT RECEIPT OF ELECTRIC FUNDS

TRANSFER INFORMATION (JUL 2013)

DFARS 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING

REPORTS (JUN 2012)

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC 1999)40

G-0003 G9.07 ELECTRONIC TRANSFER OF FUNDS PAYMENTS - CORPORATE TRADE EXCHANGE

(DLA ENERGY JUL 2007)

G-0004 G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE

TRANSFER SYSTEM (DLA ENERGY JAN 2012)

SECTION I – CONTRACT CLAUSES

FAR 52.202-1 DEFINITIONS (NOV 2013)

FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS

(DOMESTIC/OVERSEAS/IRAQ PC&S) (PORTS INTERNET APPLICATION) (TAILORED) (DLA ENERGY)

(JUL 2013)

FAR 52.212-5 -- CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS -- COMMERCIAL ITEMS (JAN 2014)

FAR 52.216-18 – ORDERING (OCT 1995)

FAR 52.216-21 – REQUIREMENTS (OCT 1995)

FAR 52.229-6 -- TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)

FAR 52.232-17 – INTEREST (OCT 2010)

DFARS 252.225-7043 ANTITERRORISM/FORCE PROTECTION FOR DEFENSE CONTRACTORS

OUTSIDE THE UNITED STATES (MAR 2006)

DFARS 252.225-7993 PROHIBITION ON CONTRACTING WITH THE ENEMY IN THE UNITED STATES

CENTRAL COMMAND THEATER OF OPERATIONS (DEVIATION 2012-O0005)(JAN 2012)

DFARS 252.225-7994 ADDITIONAL ACCESS TO CONTRACTOR AND SUBCONTRACTOR RECORDS

IN THE UNITED STATES CENTRAL COMMAND THEATER OF OPERATIONS (DEVIATION [2015-

O0013])(DATED)

DFARS 252.233-7001 CHOICE OF LAW (OVERSEAS) (JUN 1997)

DLAD 52.212-9000 CHANGES – MILITARY READINESS (NOV 2011)

I-0001 I1.01 DEFINITIONS (DLA ENERGY JUN 2009)

I-0002 I1.20-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (DLA ENERGY JAN

2012) 59

I-0003 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS

(DLA ENERGY FEB 1996)

I-0004 I186 PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION (DLA ENERGY

FEB 2009)

I-0005 I190.06 MATERIAL SAFETY DATA SHEETS -- COMMERCIAL ITEMS (DLA ENERGY APR

2006) 60

I-0006 I209.09 EXTENSION PROVISIONS (DLA ENERGY JAN 2012)

I-0007 I385 NOTIFICATION OF CONTRACTING OFFICER IN THE EVENT OF DISCOVERY OF

EVIDENCE OF FRAUD UNDER THE CONTRACT (DLA ENERGY JUL 2008)

SECTION K: REPRESENTATION AND CERTIFICATIONS

FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS (NOV

2014) 61

DFARS 252.225-7020 TRADE AGREEMENTS CERTIFICATE (JAN 2005)

K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)

K-0002 K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION (DLA

ENERGY MAY 2014)

K-0003 K86 FOREIGN TAXES (DLA ENERGY NOV 2014)

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (PC&S) (TAILORED) (DLA

ENERGY) (JUL 2013)

FAR 52.214-34 -- SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

FAR 52.216-1 -- TYPE OF CONTRACT (APR 1984)

FAR 52.232-38 -- SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH OFFER

(JUL 2013)

DLAD 52.233-9000 AGENCY PROTESTS (NOV 2011)

DLAD 52.233-9001 DISPUTES AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (ADR)

(NOV 2011)

L-0001 L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)

L-0002 L54 SITE VISIT (DLA ENERGY OCT 1992)

L-0003 L117 NOTIFICATION OF TRANSPORTATION COMPANY TO BE UTILIZED IN THE

DELIVERY OF PRODUCT (PC&S) (DLA ENERGY JAN 2012)

SECTION M – EVALUATION FACTORS FOR AWARD

FAR 52.212-2 -- EVALUATION -- COMMERCIAL ITEMS (JAN 1999)

M-0001 M3.01 EVALUATION OF OFFERS WHERE UNCOMMON ESCALATORS ARE USED (DLA

ENERGY JAN 1998)

M-0002 M55 CONVERSION FACTORS (DLA ENERGY MAR 2007)

M-0003 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) ... 82

SECTION B – SUPPLIES/SERVICES AND PRICES/COSTS

B-0001 B1.05 SUPPLIES TO BE FURNISHED (OVERSEAS PC&S) (ALASKA/HAWAII) (DLA

ENERGY JAN 2012)

(a) The supplies to be furnished during the period specified in the REQUIREMENTS clause, the delivery points, methods of delivery, and estimated quantities are shown below. The quantities shown are best estimates of required quantities only. Unless otherwise specified, the total quantity ordered and required to be delivered may be greater than or less than such quantities. The Government agrees to order from the Contractor and the Contractor shall, if ordered, deliver during the contract period all items awarded under this contract. The prices paid shall be the unit prices specified in subsequent price change modifications issued in accordance with the ECONOMIC PRICE ADJUSTMENT contract provision.

(b) In an emergency, oral orders may be issued and must be confirmed in writing by a Standard Form 1449 or DD Form 1155 within 24 hours.

(c) Offers shall not be submitted for quantities less than the estimated quantities specified below for each line item. Offers submitted for less than the estimated quantities will not be considered for award, except for items specifically designated as N/A-year requirements.

3 YEAR

SUPPLIES, DELIVERY POINTS, ESTIMATED OFFER

ITEMS AND METHOD OF DELIVERY QUANTITY PRICE

0001 Gasoline, Aviation (100) 210,000 USG $________________

DRUMS

Ali Al Salem AB Kuwait Bldg 624 Jacobson Ave

386 ELRS/LGRF, ALI AL SALEM

DELIVERY DODAAC: SE7F01

ORDERING OFFICE: SE7F01

DELIVERY DATES: Sunday – Thursday

DELIVERY HOURS: 0700-1800

THIS FUEL IS CAPITALIZED

DELIVERY NOTES: B/L and Customs AK302 documents must be submitted to LNO to process for approval upon the vessel’s arrival.

Ordering Contact Name: SMSgt Ryan Morrison: ryan.morrison@asab.afcent.af.mil Delivery Contract Name: TSgt Julian Hoffman: Julian.hoffman@asab.afcent.af.mil

By signing below, offeror agrees to all terms and conditions of this solicitation.

NAME OF SIGNATORY (TYPE OR PRINT):________________________________________________________________

OFFEROR SIGNATURE: __________________________________________ DATE: ______________________________ mailto:ryan.morrison@asab.afcent.af.mil mailto:Julian.hoffman@asab.afcent.af.mil

B-0002 B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012)

(a) WARRANTIES. The Contractor warrants that--

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this contract provision; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this contract.

(b) DEFINITIONS. As used throughout this contract provision, the term--

(1) Award price means the unit price offered by the Contractor and set forth opposite the item in the Schedule.

(2) Reference price means the market price, this is either published in an independent publication or supplied by the Contractor, with which the award price is to fluctuate. The reference price should be a market price for the same or similar product(s) as the item being purchased.

(3) Date of delivery means--

(i) FOR TANKER OR BARGE DELIVERIES.

(A) F.O.B. ORIGIN. The date and time vessel commences loading;

(B) F.O.B. DESTINATION. The date and time vessel commences discharging;

(ii) FOR PIPELINE DELIVERIES. The date and time product commences to move past the specified f.o.b. point;

and

(iii) FOR ALL OTHER TYPES OF DELIVERIES. The date product is received.

(c) ADJUSTMENTS. The prices payable under this contract shall be the award price increased or decreased by the amount, determined according to the following formula, that the reference price shall have increased or decreased, to and including the date of delivery.

(1) The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.

(2) The reference price with which the award price for the listed item is to fluctuate (and which is more fully defined in the Table below) is-- [ ] (i) The low price published in _________________________________________________________.

(name of publication)

[X ] (ii) The average of the prices published in Platts Oilgram______________________.

(name of publication)

[ ] (iii) The established price posted by ______________________________________________________ and (name of company) published in _________________________________________________________ (name of publication)

(3) COMMERCIAL. For price adjustments utilizing commercial publications such as Platts Oilgram, etc., the reference price in effect on the date of delivery shall be that item’s reference price that is in effect for the dates in the Table below. If an effective date is not cited in a publication, then the date of publication shall apply. An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on or after the effective date of such trade price service or commercial journal. In the event of a holiday for which an effective date is not used, the latest effective price(s) prior to the effective date shall be used. NOTE: Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. DLA Energy will correct any other reference prices, as notice of the correction is received. DLA Energy will work with the pricing services to determine the appropriate price, whenever an offeror or contractor can show that the price referenced should be reviewed.

(4) NONCOMMERCIAL (NOTIFICATION). For price adjustments utilizing a reference price indicator other than commercial publications such as Platts Oilgram, the Contractor shall notify the Contracting Officer of any changes in the reference price in writing within 15 calendar days from the date thereof.

(i) INCREASES. Any increase in unit price as a result of an increase in reference price shall apply only to deliveries made on or after the date of receipt by the Contracting Officer of a written notification from the Contractor of such increase.

http://www.platts.com/

However, the prices payable under this contract shall in no event exceed the Contractor’s posted or established selling price in effect on the date of delivery for the product supplied in the form of delivery made at the point of delivery. Also, no notification incorporating an increase in a contract unit price shall be executed pursuant to this contract provision until the increase has been verified by the Contracting Officer.

(ii) DECREASES. If the Contractor fails to notify the Contracting Officer of any decrease in the reference price, within the allotted 15 day period, such decrease shall apply to all deliveries made on or after the effective date of such decrease.

However, if any overpayment is made to the Contractor as a result of the Contractor’s failure to give timely notice to the Contracting Officer of any decrease in the established price, the Contractor shall be charged interest on such overpayment from the date of the overpayment to the date of reimbursement by the Contractor for the overpayment in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERICAL ITEMS clause of this contract.

(5) Where the reference price is the Contractor’s established price (see (c)(2)(iii) above), the Contractor warrants that the product selected is one for which, except for modification required by the specifications of this contract, the Contractor has an established price. Such price is the net price after applying any applicable standard trade discounts offered by the Contractor for its catalog, list, or schedule price. The Contractor further warrants that, as of the current date, any differences between the unit prices of the line items identified in the Schedule and the Contractor's established price for like quantities of the nearest commercial equivalents of such contract items are due to compliance with contract specifications and to compliance with any requirements that this contract may contain for preservation, packaging, and packing beyond standard commercial practice.

(d) MODIFICATIONS. Any resultant price changes shall be provided via notification through contract modifications and/or postings to the DLA Energy web page at http://www.desc.dla.mil under the heading Vendor Resources and then Product Price Adjustments.

(e) FAILURE TO DELIVER. Notwithstanding any other conditions of this contract provision, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Excusable Delays and Termination for Cause paragraphs of the CONTRACT TERMS AND CONDITONS – COMMERCIAL ITEMS clause of the this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(f) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed __375____ percent of the award price, except as provided hereafter:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the conditions of this contract provision will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(g) REVISION OF REFERENCE PRICE INDICATOR. In the event—

(1) Any applicable reference price is discontinued or its method of derivation is altered substantially;

(2) The reference price is an average of published or posted prices, and any one price ceases to be published or posted;

(3) The reference price is published in a trade price service or commercial journal and such publication ceases to publish said reference price or changes its method of quoting prices; or

(4) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions— the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustment described hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.

(h) CONVERSION FACTORS. If this contract provision requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the CONVERSION FACTORS contract provision, apply unless otherwise specified in the Schedule.

http://www.desc.dla.mil/

(i) EXAMINATION OF RECORDS. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this contract provision.

(j) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract provision.

(k) TABLE.

I II III IV V VI VII

Name of If company - Reference Maximum price company/ name of product; Method of price payable under publication If publication - delivery as of this contract (identify heading under applicable 1 Feb 15 (includes any Item No. by number which reference Location where to the (date) tax included (listed from (c)(2) price is published reference price reference (exclude in the award items) above) and name of product is applicable price all taxes p rice .

0001 PLATTS PREM UNL (AVGAS) FOB ARAB CARGO $1.612249 See para (f) GULF JEBEL ALI above

NOTE: PLATTS’ product prices will escalate monthly based on the average of high and low assessments contained in the Platt’s publication of each month in which deliveries are made. Therefore, the effective price for the period of the 1st through the 30th /31st will be the average of the high and low assessments for the previous month’s assessments posted on the 1st of each month. Saturdays and Sundays shall be considered as Platt’s non-publication days. If assessments are not posted by Platts during the period that delivery was made due to a holiday or another occurrence, only the posted assessments for that period will be used in the calculation.

SECTION C – DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT

C-0001 C1 SPECIFICATIONS (DLA ENERGY JAN 2012)

Product to be supplied shall fully meet the requirements of the applicable specification(s) as indicated in the Supply Schedule, except as modified elsewhere in this contract. Unless otherwise indicated by the Contractor, prior to award and in accordance with the EVALUATION OF OFFERS contract provision, the product offered will be assumed to fully meet the applicable specification(s).

C-0002 C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY MAY 2014)

Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System (ASSIST) database at https://assist.dla.mil under ASSIST-Quick Search or http://quicksearch.dla.mil. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for DoD use. Those who register for an ASSIST account may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database under the [ASSIST Update] menu.

C-0003 C16.15 GASOLINE, AVIATION (GRADES 80/100LL) (DLA ENERGY SEP 2011)

Aviation Gasoline shall conform to the latest revision of ASTM D910 or Defense Standard 91-90.

SECTION D – PACKAGING AND MARKING

DLAD 52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL (WPM)

(FEB 2007)

(a) This clause only applies when wood packaging material (WPM) will be used to make shipments under this contract and/or when WPM is being acquired under this contract.

(b) Definition.

Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

(c) All wood packaging material (WPM) used to make shipments under Department of Defense (DOD) contracts and/or acquired by DOD must meet requirements of international standards for phytosanitary measures (ISPM) 15, “Guidelines for Regulating Wood Packaging Materials in International Trade.” DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) wood packaging material program and WPM enforcement regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved dunnage stamp.

(d) Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-2 INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996)

(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain http://www.alsc.org/) compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)

(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either

(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or

(2) terminate the contract for default.

Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)

(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --

(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and

(ii) When the supplies will be ready for Government inspection.

(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor

(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or

(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

DFARS 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.

(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.

DLAD 52.246-9029 INSPECTION AND ACCEPTANCE POINTS (APR 2010)

(a) Inspection and acceptance are:

Inspection point: [X] Destination [ ] Origin [ ] Elsewhere Acceptance point: [X] Destination [ ] Origin

DLAD 52.246-9081 CERTIFICATE OF CONFORMANCE (DLA Energy) (NOV 2011)

(a) When authorized in writing by the cognizant contract administration office (CAO), the Contractor shall ship with a certificate of conformance any supplies for which the Contract would otherwise require inspection at source. In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the certificate of conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) The Contractor's signed certificate shall be attached to or included on the top copy of the material inspection and receiving report (Department of Defense (DD) Form 250) or other authorized document that is distributed to the payment office (Block 12 of the DD Form 250). A copy shall also be sent with the shipment and to the CAO (Block 10 of the DD Form 250); however, the CAO copy shall only be sent if specifically requested by the Contracting Officer.

(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.

(d) The certificate shall read as follows:

"I certify that on [Date], [Contractor's name] furnished the supplies or services called for by [contract number] via [carrier] on [bill of lading or other shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document."

[Date of Execution]

[Signature]

[Title]

E-0001 E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY SEP 2013)

(a) This contract provision applies to:

(1) All aviation fuel, lubricating oil, and additive shipments.

(2) All Bulk and Posts, Camps, and Stations non-aviation fuel shipments via pipeline or waterborne transport.

(b) QUALITY CONTROL PLAN.

(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan (QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP.

A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services.

The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.

(2) The Contractor shall require subcontractors to provide and maintain inspection systems adhere to all the requirements in this contract provision.

(3) The QCP shall include the identification of key operational positions, a schematic diagram of plant facilities pertinent to the inspection system, indicating all inspection points, and a description of the following operations related to the supplies or services to be furnished under the contract:

(i) RECEIVING, BLENDING AND COMPOUNDING. Procedures used to ensure the quality of additives blended into product supplied under this contract. Procedures to identify and ensure the quality of component base stocks used to produce finished product. Procedures to be used for adding, prior to batching, all required additives at all locations. When procedures for in-line blending of non-aviation products in accordance with the IN-LINE BLENDING OF NON-AVIATION PETROLEUM PRODUCTS contract provision are used, the QCP will provide for establishing blend ratios, and identify the responsible personnel within the Contractor's organization authorized to establish the blend ratios. When line injection of additives is required by the contract, the QCP will provide procedures for proportionately injecting additives throughout the entire loading process to ensure the additive is homogeneously blended into the product, as well as procedures for maintaining records evidencing the homogeneous blending of all line injected additives. In addition to the testing in (iii) below, a laboratory hand blend of jet fuel with all additives required by the contract shall be tested, prior to shipment, to verify compliance with the specification;

(ii) SAMPLING. Procedures for sampling additives, blend tanks, shipping tanks, lines, and conveyances/containers in accordance with API Manual of Petroleum Measurement Standards (MPMS), Chapter 8, Section 1, (ASTM D 4057) Manual Sampling of Petroleum and Petroleum Products, and/or Section 2, (ASTM D 4177) Automatic Sampling of Liquid Petroleum and Petroleum Products. Procedures include sample location, frequency, quantity, and retention. For all tanker, barge, and pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable provided that they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table II of this contract provision. See Table I, Minimum Sampling and Testing Requirements, and Table II, Sample Retention;

(iii) TESTING. Types of test series and individual test methods/procedures to be performed on samples taken from each location identified in (ii) above. See Table I, Minimum Sampling and Testing Requirements, and Table III, Definitions of Test Series;

(iv) CALIBRATION. Program for testing and measuring equipment in accordance with ISO 10012, Measurement Management Systems – Requirements for Measurement Processes and Measuring Equipment, or equivalent local regulation, as appropriate; and, a program for meters used to determine quantity complying with the API MPMS, Chapters 4, 5, and 6, or equivalent foreign standard. For items not covered by API, ASTM, or IP publications, the applicable manufacturer's recommended calibration method(s), outlined in the applicable industry publication, shall be used if acceptable to the Government;

(v) STORAGE AND HANDLING. Procedures for quality/quantity determination. Includes a description of storage and handling equipment, such as tanks, lines, valves, and manifolds; identification of dedicated/common product systems, including description of line segregation and controls to assure capability for proper gauging, sampling, draining of water, filtration, circulation, and drying; and identification of any other process/system used in maintaining product integrity during storage and handling;

(vi) LOADING AND SHIPPING – GENERAL. Procedures for product movement and related quality/quantity checks from shipping tank(s) to custody transfer point (CTP). Description of transfer system from shipping tank to CTP. A dedicated system, including lines, pumps, loading arms, and hoses, is preferred, but an isolated common system incorporating blind flanges, spectacle plates, or double valves between systems is acceptable. An isolated common system using single valves designed to ensure positive isolation, such as twin seal single valves, are also acceptable. Systems with single valve (other than twin seal) isolation require specific procedures be included in the QCP to ensure product integrity prior to the CTP. When single valves (other than twin seal) are present in the system, the Contractor shall provide their quality control procedures, from the first single valve to the CTP, at time of bid to the Contracting Officer for a determination of acceptability. Procedures for conditioning and testing of isolated systems that last carried a product other than that intended for movement under this contract. For in-line blending of non-aviation products, where approved in this contract, requirements must comply with the IN-LINE BLENDING OF NONAVIATION PETROLEUM PRODUCTS contract provision;

(vii) LOADING AND SHIPPING – TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS. For direct deliveries using Contractor-supplied tank cars and tank trucks in dedicated same grade aviation fuel service, refer to the section of API 1595 entitled “Loading of Road/Rail Cars” for loading and shipping procedures. All other tank car, tank truck, and intermodal container loadings shall be in accordance with the following procedures: Confirm all compartments have been prepared in accordance with Table IV, Conversion Chart for Tank Cars, Tank Trucks, and Intermodal Containers, below. Whenever possible, ensure the same preparation procedures used for compartments are applied to hoses, manifolds, etc. Ensure that conveyances carrying lubricating oil are dry and free from loose rust, scale, and dirt. Provide for investigation of discrepancies in either recorded quality or quantity. When required by the contract, seal conveyance and record seal numbers on the shipping document. Strainers and filters shall be located as near the loading or filling point as practicable and shall be used as outlined below for all deliveries except deliveries into tanker, barge, or pipeline.

(A) All aviation fuel shall be passed through strainers of 60 mesh or finer screen;

(B) All lubricating oil products, including preservatives, having a kinematic viscosity of 20.0 centistokes or less at 100 degrees Fahrenheit shall be passed through a 100 mesh or finer screen;

(C) All lubricating oil products, including preservatives, having a kinematic viscosity greater than 20.0 centistokes at 100 degrees Fahrenheit, but less than 22.0 centistokes at 210 degrees Fahrenheit, shall be passed through a 60 mesh or finer screen; and

(D) The Contractor shall furnish and periodically inspect strainers and filters pursuant to this paragraph to determine condition and perform maintenance as necessary, keeping a written record thereof.

(viii) LOADING AND SHIPPING – TANKERS AND BARGES.

(A) For f.o.b. destination Contractor-supplied tankers/barges. Procedures for the preparation of vessel cargo systems, in accordance with Energy Institute (EI) HM 50, Guidelines for the Cleaning of Tanks and Lines for Marine Tank Vessels Carrying Petroleum and Refined Products, that ensure the vessel is suitable to load the intended product(s).Particular attention should be given to vessels that previously carried a Fatty Acid Methyl Ester (FAME) cargo. As a minimum, f.o.b. destination Contractors must ensure that all cargo systems on the vessel intended for loading product under this contract, to include tanks, lines, manifolds, and pumps, are washed, gas freed, and inspected. In the event a solvent de-greaser is utilized in the tank preparation process, a minimum of two rinses must be performed by the vessel prior to loading Aviation Turbine Fuel. Vessels that will be carrying JP8 will be allowed to load without cleaning based upon the following criteria: the last cargo prior to loading JP-8 is Jet A/A1, and the second and third to last cargoes were clean middle distillate or lighter petroleum products (no black oils, lubricating oils, vegetable oils, palm oils, biodiesel with FAME content greater than or equal to 15 % or other similar products). The vessel will drop all lines and strip dry all cargo tanks of the previously carried Jet A/Jet A1 prior to loading JP-8. These procedures, and others deemed necessary by the Contractor, shall be included to ensure that the product meets the specification requirements at the CTP.

(B) For f.o.b. origin Government-supplied tankers/barges. Procedures for maintaining a time log of all significant events/delays including vessel notice of readiness, vessel arrival, mooring, vessel deballasting, inerting and conditioning of cargo tanks, inspections, hose connections and disconnections, starts, stops, vessel release, or any other event that affects laytime of the vessel. Procedures for assuring condition of loading line (full of tested product, all air bled, and pressure packed) and gauging shore tanks, both before and after loading. In the event an automated metering system is to be used as the means of shore quantity determination, manual gauges of all storage tanks designated for shipment shall be taken prior to commencement of loading. Procedures for preload discussion between Contractor, vessel, and QAR to include, but not be limited to, prior two cargoes, cleaning procedures, loading plan, loading rates, sampling requirements, and after loading sampling and gauging. [Prior to loading - gauge, sample, and test in transit cargoes designated for load on top. Gauge and sample (1 gallon) any other product on board, except for JPTS, and retain those samples.] All cargo quantities shall be calculated and volume corrected both before and after loading. Procedures for commencement of loading into one tank (up to 3 feet), then switching to at most two other vessel tanks while first-in sampling and testing is being accomplished (Table I). Procedures for the transportation of samples from the vessel to the testing facility. Monitoring the loading (including line blending and additive injection) from source to vessel, investigating irregularities immediately and stopping loading, if necessary.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .