Attachment_3_-_Price_Proposal_Worksheets.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Central East Environmental assessment, remediation, and emergency response services
Solicitation number
SP060014R0503
Issued by

About this file

Attachment 3 - Price Proposal Worksheets

View the file

Other files

File Type Posted
14-R-0503_Amd_0007.pdf PDF
14-R-0503_Amd_0006.pdf PDF
14-R-0503_Amd_0005.pdf PDF
14-R-0503_Amd_0004.pdf PDF
14-R-0503_Amd_0003.pdf PDF
14-R-0503_Amd_0003.pdf PDF
14-R-0503_Amd_0003.pdf PDF
14-R-0503_Amd_0002.pdf PDF
14-R-0503_Amd_0001.pdf PDF
Attachment_5_-_DLA_Energy_19.3_Small_Business_Subcontracting_Plan.pdf PDF
Solicitation_CE_Envr.pdf PDF
Attachment_2_-_52.212-3.pdf PDF
Attachment_4_-_Wage_Determination.pdf PDF
Attachment_7_-_Sample_Scenario.pdf PDF
Attachment_1_-_PWS _Alex.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Charleston

NOTE: Total estimate for each CLIN is for the full five-year term of the contract. Period of performance. June 1, 2014 through May 31, 2019

CLINServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
0001Lump Sum price for work plan12$ - 0
0002Unit Price per hour in excess of those included in work plan480$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
0003Price per unit (10 points/unit) - 4 feet depth1$ - 0
0004Price per unit (10 points/unit) - 14 feet depth1$ - 0
0005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
0006Price per unit (10,000 linear feet) to include in report of findings1$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
0007Price per boring up to 10 feet20$ - 0
0008Cost per foot from 11 to 20 feet20$ - 0
0009Cost per foot 21 to 60 feet20$ - 0
0010Cost per foot 61 to 150 feet1$ - 0
0011Mobilization cost for soil boring6$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
0012Price per 2" Monitoring Well up to 10 feet10$ - 0
0013Cost per foot of 2" monitoring well from 11 to 20 feet10$ - 0
0014Cost per foot of 2" monitoring well from 21 to 60 feet10$ - 0
0015Cost per foot of 2" monitoring well from 61 to 150 feet1$ - 0
0016Price per 4" monitoring well up to 10 feet1$ - 0
0017Cost per foot of 4" monitoring well from 11 to 20 feet1$ - 0
0018Cost per foot of 4" monitoring well from 21 to 60 feet1$ - 0
0019Cost per foot of 4" monitoring well from 61 to150 feet1$ - 0
0020Cost per foot to Close/Decommission 2” dia. well300$ - 0
0021Cost per foot to Close/Decommission 4” dia. well1$ - 0
0022Mobilization cost for monitoring well installation6$ - 0
Conduct well development IAW Task 6 of the PWS
0023Price for well development20$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
0024Cost per unit of DPT (5 bores per unit)10$ - 0
0025Mobilization for DPT Testing2$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
0026Price of (10 soil borings/unit)30$ - 0
Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
00276010 (Individual metal)1$ - 0
00286020 (Individual metal)1$ - 0
00297470 (Mercury)1$ - 0
00308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)1$ - 0
00318015 (TPH as Gasoline [C6-12])1$ - 0
00328021 (Aromatic Volatile Organic Compounds)500$ - 0
00338041 (Phenols)1$ - 0
00348081 (Organochlorine Pesticides)1$ - 0
00358121 (Chlorinated Hydrocarbons)1$ - 0
00368151 (Chlorinated Herbicides)1$ - 0
00378260 (Full List Volatile Organic Compounds)500$ - 0
00388260 (BTEX/MTBE/Naphthalene)1$ - 0
00398270 (Full list Semi-Volatile Organic Compounds)500$ - 0
00408270-SIM (Polyaromatic Hydrocarbons)1$ - 0
00418310 (Polyaromatic Hydrocarbons)1$ - 0
00428440 (Total Petroleum Hydrocarbons)500$ - 0
0043601 (Prugeable Halocarbons)1$ - 0
0044602 (Purgeable Aromatics)1$ - 0
0045604 (Phenols)1$ - 0
0046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
0047610 (Polynuclear Aromatic Hydrocarbons)1$ - 0
0048612 (Chlorinated Hydrocarbons)1$ - 0
0049624 (Purgeables)1$ - 0
0050625 (Semivolatile Organic Compounds)1$ - 0
0051TCLP Metals1$ - 0
00529045 (pH)1$ - 0
00531010 (Ignitability)1$ - 0
0054CCR Title 22 Metals (6010/7470)1$ - 0
00559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
00569023 (Total Organic Halides)1$ - 0
00579030 or SM 4500-S (Sulfide)1$ - 0
0058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
0059SM 2320 (Alkalinity)1$ - 0
00605520B (Oil & Grease)1$ - 0
00612130 (Turbidity)1$ - 0
00622540 (Total Suspended Solids & Seatable Solids)1$ - 0
00635540 (Surfactant)1$ - 0
00645210 (BOD)1$ - 0
0065TO-151$ - 0
0066Fixed Gases1$ - 0
0067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
0068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
0069Price per 6" recovery well from 11 to 20 Feet1$ - 0
0070Price per 6" recovery well from 21 to 60 Feet1$ - 0
0071Price per 6" recovery well from 61 to 120 Feet1$ - 0
0072Mobilization cost for 6" recovery well1$ - 0
0073Monthly price for 6" recovery well system O&M1$ - 0
0074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
0075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
0076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
0077Lump sum price for pump test1$ - 0
0
Report preparation, duplication, and distribution IAW Task 13 of the PWS
0078Lump sum price for report preparation, duplication, and distribution20$ - 0
0079Unit price per hour in excess hours for report preparation480$ - 0
Miscellaneous services IAW Task 14 of the PWS
0080Project Manager price per hour1,200$ - 0
0081Engineer I price per hour2,400$ - 0
0082Engineer II price per hour1$ - 0
0083Engineer III price per hour1$ - 0
0084Chemist price per hour400$ - 0
0085Environmental Scientist I price per hour1$ - 0
0086Environmental Scientist II price per hour1$ - 0
0087Environmental Scientist III price per hour1$ - 0
0088Geologist I price per hour160$ - 0
0089Geologist II price per hour1$ - 0
0090Geologist III price per hour1$ - 0
0091Hydrogeologist I price per hour160$ - 0
0092Hydrogeologist II price per hour1$ - 0
0093Hydrogeologist III price per hour1$ - 0
0094Toxicologist I price per hour20$ - 0
0095Toxicologist II price per hour1$ - 0
0096Toxicologist III price per hour1$ - 0
0097Drafter price per hour120$ - 0
0098Traffic Control Engineer price per hour1$ - 0
0099Cost Accountant price per hour150$ - 0
0100Secretary price per hour120$ - 0
0101Buyer40$ - 0
0102Site Labor Foreman price per hour40$ - 0
0103Remediation System Operator price per hour1$ - 0
0104Heavy Equipment Operator price per hour80$ - 0
0105Laborer price per hour500$ - 0
0106Drill Rig Operator price per hour80$ - 0
0107Environmental Technician price per hour800$ - 0
0108Utility Truck price per day80$ - 0
010902/Explosimeter price per day20$ - 0
0110Groundwater Sampling Pump price per day20$ - 0
0111Flame Ionization OCA price per day20$ - 0
0112Air Velocity Meter price per day20$ - 0
0113Field GC price per day20$ - 0
0114Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum50$ - 0
0115Furnish and fill with soil roll off bin, price per bin1$ - 0
0116Shipping of soil and water samples for analytical testing price per 25lb shipping container40$ - 0
0117Disposable Bailers price per unit300$ - 0
0118Tedlar Bags price per dozen50$ - 0
0119Pickup Truck (1/2 ton) price per day104$ - 0
0120Air Compressor (7 cfm) price per day20$ - 0
0121Generator (4000 watt) price per day20$ - 0
0122CAD Equipment Use Charge price per day10$ - 0
0123Photoionization Detector price per day20$ - 0
0124Groundwater Multimeter20$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
0125Percent mark-up for overhead and profit
Background Review IAW Task 16
0126Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ - 0

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest
skill level,II is the intermediate skill level, and III is the highest skill level

Solicitation No. SP0600-14-R-0503 Estimated Price Per CLIN Location: DFSP Charleston,SC

&P

Jacksonville

NOTE: Total estimate for each CLIN is for the full five-year term of the contract. Period of performance. June 1, 2014 through May 31, 2019

CLINServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
0001Lump Sum price for work plan10$ - 0
0002Unit Price per hour in excess of those included in work plan400$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
0003Price per unit (10 points/unit) - 4 feet depth1$ - 0
0004Price per unit (10 points/unit) - 14 feet depth1$ - 0
0005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
0006Price per unit (10,000 linear feet) to include in report of findings1$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
0007Price per boring up to 10 feet1$ - 0
0008Cost per foot from 11 to 20 feet1$ - 0
0009Cost per foot 21 to 60 feet1$ - 0
0010Cost per foot 61 to 150 feet1$ - 0
0011Mobilization cost for soil boring1$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
0012Price per 2" Monitoring Well up to 10 feet20$ - 0
0013Cost per foot of 2" monitoring well from 11 to 20 feet100$ - 0
0014Cost per foot of 2" monitoring well from 21 to 60 feet1$ - 0
0015Cost per foot of 2" monitoring well from 61 to 150 feet1$ - 0
0016Price per 4" monitoring well up to 10 feet1$ - 0
0017Cost per foot of 4" monitoring well from 11 to 20 feet1$ - 0
0018Cost per foot of 4" monitoring well from 21 to 60 feet1$ - 0
0019Cost per foot of 4" monitoring well from 61 to150 feet1$ - 0
0020Cost per foot to Close/Decommission 2” dia. well250$ - 0
0021Cost per foot to Close/Decommission 4” dia. well1$ - 0
0022Mobilization cost for monitoring well installation4$ - 0
Conduct well development IAW Task 6 of the PWS
0023Price for well development4$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
0024Cost per unit of DPT (5 bores per unit)20$ - 0
0025Mobilization for DPT Testing4$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
0026Price of (10 soil borings/unit)4$ - 0
Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
00276010 (Individual metal)1$ - 0
00286020 (Individual metal)1$ - 0
00297470 (Mercury)1$ - 0
00308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)1$ - 0
00318015 (TPH as Gasoline [C6-12])1$ - 0
00328021 (Aromatic Volatile Organic Compounds)1$ - 0
00338041 (Phenols)1$ - 0
00348081 (Organochlorine Pesticides)1$ - 0
00358121 (Chlorinated Hydrocarbons)1$ - 0
00368151 (Chlorinated Herbicides)1$ - 0
00378260 (Full List Volatile Organic Compounds)250$ - 0
00388260 (BTEX/MTBE/Naphthalene)1$ - 0
00398270 (Full list Semi-Volatile Organic Compounds)1$ - 0
00408270-SIM (Polyaromatic Hydrocarbons)1$ - 0
00418310 (Polyaromatic Hydrocarbons)1$ - 0
00428440 (Total Petroleum Hydrocarbons)1$ - 0
0043601 (Prugeable Halocarbons)1$ - 0
0044602 (Purgeable Aromatics)1$ - 0
0045604 (Phenols)1$ - 0
0046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
0047610 (Polynuclear Aromatic Hydrocarbons)1$ - 0
0048612 (Chlorinated Hydrocarbons)1$ - 0
0049624 (Purgeables)1$ - 0
0050625 (Semivolatile Organic Compounds)1$ - 0
0051TCLP Metals1$ - 0
00529045 (pH)1$ - 0
00531010 (Ignitability)1$ - 0
0054CCR Title 22 Metals (6010/7470)1$ - 0
00559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
00569023 (Total Organic Halides)1$ - 0
00579030 or SM 4500-S (Sulfide)1$ - 0
0058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
0059SM 2320 (Alkalinity)1$ - 0
00605520B (Oil & Grease)1$ - 0
00612130 (Turbidity)1$ - 0
00622540 (Total Suspended Solids & Seatable Solids)1$ - 0
00635540 (Surfactant)1$ - 0
00645210 (BOD)1$ - 0
0065TO-151$ - 0
0066Fixed Gases1$ - 0
0067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
0068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
0069Price per 6" recovery well from 11 to 20 Feet1$ - 0
0070Price per 6" recovery well from 21 to 60 Feet1$ - 0
0071Price per 6" recovery well from 61 to 120 Feet1$ - 0
0072Mobilization cost for 6" recovery well1$ - 0
0073Monthly price for 6" recovery well system O&M1$ - 0
0074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
0075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
0076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
0077Lump sum price for pump test1$ - 0
0
Report preparation, duplication, and distribution IAW Task 13 of the PWS
0078Lump sum price for report preparation, duplication, and distribution20$ - 0
0079Unit price per hour in excess hours for report preparation200$ - 0
Miscellaneous services IAW Task 14 of the PWS
0080Project Manager price per hour2,000$ - 0
0081Engineer I price per hour400$ - 0
0082Engineer II price per hour1$ - 0
0083Engineer III price per hour1$ - 0
0084Chemist price per hour250$ - 0
0085Environmental Scientist I price per hour200$ - 0
0086Environmental Scientist II price per hour1$ - 0
0087Environmental Scientist III price per hour1$ - 0
0088Geologist I price per hour200$ - 0
0089Geologist II price per hour1$ - 0
--90Geologist III price per hour1$ - 0
0091Hydrogeologist I price per hour200$ - 0
0092Hydrogeologist II price per hour1$ - 0
0093Hydrogeologist III price per hour1$ - 0
0094Toxicologist I price per hour1$ - 0
0095Toxicologist II price per hour1$ - 0
0096Toxicologist III price per hour1$ - 0
0097Drafter price per hour250$ - 0
0098Traffic Control Engineer price per hour1$ - 0
0099Cost Accountant price per hour500$ - 0
0100Secretary price per hour5$ - 0
0101Buyer5$ - 0
0102Site Labor Foreman price per hour1$ - 0
0103Remediation System Operator price per hour1$ - 0
0104Heavy Equipment Operator price per hour1$ - 0
0105Laborer price per hour1$ - 0
0106Drill Rig Operator price per hour40$ - 0
0107Environmental Technician price per hour400$ - 0
0108Utility Truck price per day20$ - 0
010902/Explosimeter price per day5$ - 0
0110Groundwater Sampling Pump price per day5$ - 0
0111Flame Ionization OCA price per day5$ - 0
0112Air Velocity Meter price per day5$ - 0
0113Field GC price per day5$ - 0
0114Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum125$ - 0
0115Furnish and fill with soil roll off bin, price per bin1$ - 0
0116Shipping of soil and water samples for analytical testing price per 25lb shipping container20$ - 0
0117Disposable Bailers price per unit5$ - 0
0118Tedlar Bags price per dozen5$ - 0
0119Pickup Truck (1/2 ton) price per day50$ - 0
0120Air Compressor (7 cfm) price per day5$ - 0
0121Generator (4000 watt) price per day5$ - 0
0122CAD Equipment Use Charge price per day5$ - 0
0123Photoionization Detector price per day5$ - 0
0124Groundwater Multimeter Price per Day5$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
0125Percent mark-up for overhead and profit
Background Review IAW Task 16
0126Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ - 0

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest
skill level,II is the intermediate skill level, and III is the highest skill level

Solicitation No. SP0600-14-R-0503 Estimated Price Per CLIN Location: DFSP Jacksonville, FL

&P

Norfolk

NOTE: Total estimate for each CLIN is for the full five-year term of the contract. Period of performance. June 1, 2014 through May 31, 2019

CLINServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
0001Lump Sum price for work plan8$ - 0
0002Unit Price per hour in excess of those included in work plan20$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
0003Price per unit (10 points/unit) - 4 feet depth1$ - 0
0004Price per unit (10 points/unit) - 14 feet depth1$ - 0
0005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
0006Price per unit (10,000 linear feet) to include in report of findings1$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
0007Price per boring up to 10 feet10$ - 0
0008Cost per foot from 11 to 20 feet10$ - 0
0009Cost per foot 21 to 60 feet10$ - 0
0010Cost per foot 61 to 150 feet10$ - 0
0011Mobilization cost for soil boring2$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
0012Price per 2" Monitoring Well up to 10 feet10$ - 0
0013Cost per foot of 2" monitoring well from 11 to 20 feet10$ - 0
0014Cost per foot of 2" monitoring well from 21 to 60 feet10$ - 0
0015Cost per foot of 2" monitoring well from 61 to 150 feet1$ - 0
0016Price per 4" monitoring well up to 10 feet1$ - 0
0017Cost per foot of 4" monitoring well from 11 to 20 feet1$ - 0
0018Cost per foot of 4" monitoring well from 21 to 60 feet1$ - 0
0019Cost per foot of 4" monitoring well from 61 to150 feet1$ - 0
0020Cost per foot to Close/Decommission 2” dia. well1$ - 0
0021Cost per foot to Close/Decommission 4” dia. well1$ - 0
0022Mobilization cost for monitoring well installation2$ - 0
Conduct well development IAW Task 6 of the PWS
0023Price for well development10$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
0024Cost per unit of DPT (5 bores per unit)5$ - 0
0025Mobilization for DPT Testing1$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
0026Price of (10 soil borings/unit)15$ - 0
Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
00276010 (Individual metal)1$ - 0
00286020 (Individual metal)1$ - 0
00297470 (Mercury)1$ - 0
00308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)1$ - 0
00318015 (TPH as Gasoline [C6-12])1$ - 0
00328021 (Aromatic Volatile Organic Compounds)1$ - 0
00338041 (Phenols)1$ - 0
00348081 (Organochlorine Pesticides)1$ - 0
00358121 (Chlorinated Hydrocarbons)1$ - 0
00368151 (Chlorinated Herbicides)1$ - 0
00378260 (Full List Volatile Organic Compounds)500$ - 0
00388260 (BTEX/MTBE/Naphthalene)1$ - 0
00398270 (Full list Semi-Volatile Organic Compounds)500$ - 0
00408270-SIM (Polyaromatic Hydrocarbons)1$ - 0
00418310 (Polyaromatic Hydrocarbons)1$ - 0
00428440 (Total Petroleum Hydrocarbons)500$ - 0
0043601 (Prugeable Halocarbons)1$ - 0
0044602 (Purgeable Aromatics)1$ - 0
0045604 (Phenols)1$ - 0
0046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
0047610 (Polynuclear Aromatic Hydrocarbons)1$ - 0
0048612 (Chlorinated Hydrocarbons)1$ - 0
0049624 (Purgeables)1$ - 0
0050625 (Semivolatile Organic Compounds)1$ - 0
0051TCLP Metals1$ - 0
00529045 (pH)1$ - 0
00531010 (Ignitability)1$ - 0
0054CCR Title 22 Metals (6010/7470)1$ - 0
00559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
00569023 (Total Organic Halides)1$ - 0
00579030 or SM 4500-S (Sulfide)1$ - 0
0058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
0059SM 2320 (Alkalinity)1$ - 0
00605520B (Oil & Grease)1$ - 0
00612130 (Turbidity)1$ - 0
00622540 (Total Suspended Solids & Seatable Solids)1$ - 0
00635540 (Surfactant)1$ - 0
00645210 (BOD)1$ - 0
0065TO-151$ - 0
0066Fixed Gases1$ - 0
0067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
0068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
0069Price per 6" recovery well from 11 to 20 Feet1$ - 0
0070Price per 6" recovery well from 21 to 60 Feet1$ - 0
0071Price per 6" recovery well from 61 to 120 Feet1$ - 0
0072Mobilization cost for 6" recovery well1$ - 0
0073Monthly price for 6" recovery well system O&M1$ - 0
0074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
0075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
0076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
0077Lump sum price for pump test1$ - 0
Report preparation, duplication, and distribution IAW Task 13 of the PWS
0078Lump sum price for report preparation, duplication, and distribution1$ - 0
0079Unit price per hour in excess hours for report preparation1$ - 0
Miscellaneous services IAW Task 14 of the PWS
0080Project Manager price per hour800$ - 0
0081Engineer I price per hour300$ - 0
0082Engineer II price per hour1$ - 0
0083Engineer III price per hour1$ - 0
0084Chemist price per hour100$ - 0
0085Environmental Scientist I price per hour1$ - 0
0086Environmental Scientist II price per hour1$ - 0
0087Environmental Scientist III price per hour1$ - 0
0088Geologist I price per hour80$ - 0
0089Geologist II price per hour1$ - 0
0090Geologist III price per hour1$ - 0
0091Hydrogeologist I price per hour20$ - 0
0092Hydrogeologist II price per hour1$ - 0
0093Hydrogeologist III price per hour1$ - 0
0094Toxicologist I price per hour20$ - 0
0095Toxicologist II price per hour1$ - 0
0096Toxicologist III price per hour1$ - 0
0097Drafter price per hour120$ - 0
0098Traffic Control Engineer price per hour1$ - 0
0099Cost Accountant price per hour150$ - 0
0100Secretary price per hour120$ - 0
0101Buyer40$ - 0
0102Site Labor Foreman price per hour40$ - 0
0103Remediation System Operator price per hour1$ - 0
0104Heavy Equipment Operator price per hour40$ - 0
0105Laborer price per hour500$ - 0
0106Drill Rig Operator price per hour40$ - 0
0107Environmental Technician price per hour800$ - 0
0108Utility Truck price per day10$ - 0
010902/Explosimeter price per day5$ - 0
0110Groundwater Sampling Pump price per day20$ - 0
0111Flame Ionization OCA price per day5$ - 0
0112Air Velocity Meter price per day1$ - 0
0113Field GC price per day1$ - 0
0114Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum25$ - 0
0115Furnish and fill with soil roll off bin, price per bin1$ - 0
0116Shipping of soil and water samples for analytical testing price per 25lb shipping container20$ - 0
0117Disposable Bailers price per unit100$ - 0
0118Tedlar Bags price per dozen8$ - 0
0119Pickup Truck (1/2 ton) price per day104$ - 0
0120Air Compressor (7 cfm) price per day1$ - 0
0121Generator (4000 watt) price per day5$ - 0
0122CAD Equipment Use Charge price per day1$ - 0
0123Photoionization Detector price per day5$ - 0
0124Groundwater Multimeter Price Per Day5$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
0125Percent mark-up for overhead and profit
Background Review IAW Task 16
0126Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ - 0

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest
skill level,II is the intermediate skill level, and III is the highest skill level

Solicitation No. SP0600-14-R-0503 Estimated Price Per CLIN Location: DFSP Norfolk, VA

&P

Tampa

NOTE: Total estimate for each CLIN is for the full five-year term of the contract. Period of performance. From Date of Award to May 31, 2019

CLINReference #ServicesEstimatesUnit PriceTotal
Develop a detailed work plan IAW Task 1 of the PWS
00010001Lump Sum price for work plan6$ - 0
00010002Unit Price per hour in excess of those included in work plan80$ - 0
Conduct soil/gas survey IAW Task 2 of the PWSConduct Soil/Gas Survey IAW Task 2 of SOW
00010003Price per unit (10 points/unit) - 4 fee depth1$ - 0
00010004Price per unit (10 points/unit) - 14 feet depth1$ - 0
00010005Soil Gas Survey mobilization cost1$ - 0
Conduct geophysical survey IAW Task 3 of the PWS
00010006Price per unit (10,000 linear feet) to include in report of findings8$ - 0
Locate, install, and sample soil borings IAW Task 4 of the PWS
00010007Price per boring up to 10 feet20$ - 0
00010008Cost per foot from 11 to 20 feet200$ - 0
00010009Cost per foot 21 to 60 feet800$ - 0
00010010Cost per foot 61 to 150 feet200$ - 0
00010011Mobilization cost for soil boring3$ - 0
Locate, install and sample monitoring wells IAW Task 5 of the PWS
00010012Price per 2" Monitoring Well up to 10 feet10$ - 0
00010013Cost per foot of 2" monitoring well from 11 to 20 feet100$ - 0
00010014Cost per foot of 2" monitoring well from 21 to 60 feet200$ - 0
00010015Cost per foot of 2" monitoring well from 61 to 150 feet100$ - 0
00010016Price per 4" monitoring well up to 10 feet15$ - 0
00010017Cost per foot of 4" monitoring well from 11 to 20 feet150$ - 0
00010018Cost per foot of 4" monitoring well from 21 to 60 feet200$ - 0
00010019Cost per foot of 4" monitoring well from 61 to150 feet100$ - 0
00010020Cost per foot to Close/Decommission 2” dia. well150$ - 0
00010021Cost per foot to Close/Decommission 4” dia. well100$ - 0
00010022Mobilization cost for monitoring well installation3$ - 0
Conduct well development IAW Task 6 of the PWS
00010023Price for well development25$ - 0
Conduct Direct Push Testing (DPT) IAW Task 7 of the PWS
00010024Cost per unit of DPT (5 bores per unit)10$ - 0
00010025Mobilization for DPT Testing5$ - 0
Perform soil boring survey IAW Task 8 of the PWS0
00010026Price of (10 soil borings/unit)1$ - 0
0001Conduct analytical testing IAW Task 9 of the PWS; Cost per test for the following procedures:
000100276010 (Individual metal)250$ - 0
000100286020 (Individual metal)20$ - 0
000100297470 (Mercury)1$ - 0
000100308015 (TPH as JP5 [C9-C16] w/silica gel cleanup)250$ - 0
000100318015 (TPH as Gasoline [C6-12])250$ - 0
000100328021 (Aromatic Volatile Organic Compounds)50$ - 0
000100338041 (Phenols)1$ - 0
000100348081 (Organochlorine Pesticides)1$ - 0
000100358121 (Chlorinated Hydrocarbons)10$ - 0
000100368151 (Chlorinated Herbicides)1$ - 0
000100378260 (Full List Volatile Organic Compounds)24$ - 0
000100388260 (BTEX/MTBE/Naphthalene)24$ - 0
000100398270 (Full list Semi-Volatile Organic Compounds)1,000$ - 0
000100408270-SIM (Polyaromatic Hydrocarbons)10$ - 0
000100418310 (Polyaromatic Hydrocarbons)10$ - 0
000100428440 (Total Petroleum Hydrocarbons)10$ - 0
00010043601 (Prugeable Halocarbons)115$ - 0
00010044602 (Purgeable Aromatics)1$ - 0
00010045604 (Phenols)1$ - 0
00010046608 (Oranochlorine Pesticides and PCB’s)1$ - 0
00010047610 (Polynuclear Aromatic Hydrocarbons)10$ - 0
00010048612 (Chlorinated Hydrocarbons)1$ - 0
00010049624 (Purgeables)1$ - 0
00010050625 (Semivolatile Organic Compounds)1$ - 0
00010051TCLP Metals30$ - 0
000100529045 (pH)1$ - 0
000100531010 (Ignitability)10$ - 0
00010054CCR Title 22 Metals (6010/7470)1$ - 0
000100559012 or SM 4500-CN or 335.4 (Cyanide)1$ - 0
000100569023 (Total Organic Halides)1$ - 0
000100579030 or SM 4500-S (Sulfide)1$ - 0
00010058300.0 (Chloride, Sulfate, Nitrate)1$ - 0
00010059SM 2320 (Alkalinity)1$ - 0
000100605520B (Oil & Grease)100$ - 0
000100612130 (Turbidity)1$ - 0
000100622540 (Total Suspended Solids & Seatable Solids)1$ - 0
000100635540 (Surfactant)1$ - 0
000100645210 (BOD)1$ - 0
00010065TO-151$ - 0
00010066Fixed Gases1$ - 0
00010067Encore Sample Container or Equivalent1$ - 0
Install and maintain recovery well IAW Task 10 of the PWSPerforming monitoring well survey IAW Task 10 of the SOW (10 monitoring wells/unit)0
00010068Price per 6" recovery well up to 10 Feet (including water table depression and free product recovery pump)1$ - 0
00010069Price per 6" recovery well from 11 to 20 Feet1$ - 0
00010070Price per 6" recovery well from 21 to 60 Feet1$ - 0
00010071Price per 6" recovery well from 61 to 120 Feet1$ - 0
00010072Mobilization cost for 6" recovery well1$ - 0
00010073Monthly price for 6" recovery well system O&M1$ - 0
00010074Cost of installing water table depression and free product recovery pump system on an existing 4” monitoring well1$ - 0
00010075Mobilization cost for pump installation on existing 4" monitoring well1$ - 0
00010076Monthly price for 4" recovery well system O&M1$ - 0
Conduct pump testing IAW Task 11 of the PWS0
00010077Lump sum price for pump test10
Annual monitoring and reporting IAW Task 12 of the PWS0
00010078Lump sum price for annual monitoring and reporting1
0001Report preparation, duplication, and distribution IAW Task 13 of the PWS
00010079Lump sum price for report preparation, duplication, and distribution20
00010080Unit price per hour in excess hours for report preparation75
Miscellaneous services IAW Task 14 of the PWS
00010081Project Manager price per hour800$ - 0
00010082Engineer I price per hour300$ - 0
00010083Engineer II price per hour60$ - 0
00010084Engineer III price per hour75$ - 0
00010085Chemist price per hour100$ - 0
00010086Environmental Scientist I price per hour50$ - 0
00010087Environmental Scientist II price per hour150$ - 0
00010088Environmental Scientist III price per hour40$ - 0
00010089Geologist I price per hour80$ - 0
00010090Geologist II price per hour1,500$ - 0
00010091Geologist III price per hour20$ - 0
00010092Hydrogeologist I price per hour20$ - 0
00010093Hydrogeologist II price per hour120$ - 0
00010094Hydrogeologist III price per hour20$ - 0
00010095Toxicologist I price per hour20$ - 0
00010096Toxicologist II price per hour20$ - 0
00010097Toxicologist III price per hour10$ - 0
00010098Drafter price per hour120$ - 0
00010099Traffic Control Engineer price per hour10$ - 0
00010100Cost Accountant price per hour150$ - 0
00010101Secretary price per hour120$ - 0
00010102Buyer40$ - 0
00010103Site Labor Foreman price per hour40$ - 0
00010104Remediation System Operator price per hour900$ - 0
00010105Heavy Equipment Operator price per hour10$ - 0
00010106Laborer price per hour500$ - 0
00010107Drill Rig Operator price per hour40$ - 0
00010108Environmental Technician price per hour800$ - 0
00010109Utility Truck price per day10$ - 0
0001011002/Explosimeter price per day10$ - 0
00010111Groundwater Sampling Pump price per day20$ - 0
00010112Flame Ionization OCA price per day20$ - 0
00010113Air Velocity Meter price per day1$ - 0
00010114Field GC price per day1$ - 0
00010115Furnish and fill with soil or water DOT approved 55 gallon drum, price per drum100$ - 0
00010116Furnish and fill with soil roll off bin, price per bin10$ - 0
00010117Shipping of soil and water samples for analytical testing price per 25lb shipping container40$ - 0
00010118Disposable Bailers price per unit150$ - 0
00010119Tedlar Bags price per dozen8$ - 0
00010120Pickup Truck (1/2 ton) price per day104$ - 0
00010121Air Compressor (7 cfm) price per day1$ - 0
00010122Generator (4000 watt) price per day1,000$ - 0
00010123CAD Equipment Use Charge price per day10$ - 0
00010124Photoionization Detector price per day20$ - 0
00010125Groundwater Multimeter20$ - 0
Other direct costs for cost reimbursable services, materials, or supplies IAW Task 15
00010126Percent mark-up for overhead and profit$ - 0
Background Review IAW Task 16
00010127Lump sum price for reviewing existing documentation1$ - 0

Total Overall Evaluated Price $ - 0

NOTE 1: Where labor grade classifications are used (e.g., I, II, III), I is the lowest
skill level,II is the intermediate skill level, and III is the highest skill level

Solicitation No. SP0600-14-R-0503 Price Proposal Worksheet Location: DFSP Tampa, FL

&P

File details come from the government source that posted it. Updated .