Exhibit_G.doc.pdf
PDF 14 KB Posted
- Attached to
- Sale of Fuel Oil Reclaimed at Naval Facilities Engineering Command Pearl Harbor Hawaii NAVFAC-HI
- Solicitation number
- SP0600-14-R-0221
- Issued by
-
Defense Logistics Agency Energy
About this file
Exhibit G - Declaration of Inspection
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_E.pdf | ||
| Exhibit_F.pdf | ||
| Exhibit_A.pdf | ||
| Exhibit_D.pdf | ||
| FOR_Sale_Solicitation_-_NAVFAC_HAWAII_13_FEB_2014.pdf | ||
| Exhibit_C.pdf | ||
| Exhibit_B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DECLARATION OF INSPECTION
BILGE AND OILY WASTE TRANSFER FACILITY - NAVFAC HI.
VESSEL LOCATION
PRODUCT QUANTITY DATE
TRANSFER OPERATION START TIME Defined as when the receiving and transferring persons first meet to begin completing the declaration of inspection. 33 CFR 156.120(a)
TRANSFER OPERATION STOP TIME
Per 33 CFR 156.150, an inspection is required for oil (bilge/ oily waste water) transfers on the navigable water or contiguous zone of the United States, to from or within a vessel with a capacity of 250 barrels (10,500 gal) or more.
The 250 barrel capacity refers to ALL oil onboard, including fuel and lube oil, regardless of the compartment or volume to be transferred.
The operator (PWC) shall initial in the space adjacent to item to indicate that the requirement has been met.
Initials
1. Transfer hoses are long enough to allow vessel to move to mooring limits to prevent placing strain on the hose or transfer piping system. 33 CFR156.1220(b)
2. Each hose is supported to prevent kinking or other damage to the hose and strain on its coupling. 33 CFR
156.120(c)
3. Each part of the transfer system is aligned to allow the flow of oil (bilge/oily waste water). 33 CFR 156.120(d)
4. Each part of the transfer system not necessary for the transfer operation is securely blanked or shut off.
33 CFR 156.120(e)
5. The end of each hose that is not connected for the transfer of oil (bilge/oily waste water) is valved shut or blanked off using blank flanges or quick connect/disconnect cap. 33 CFR 156.120(f) and 154.520
6. The transfer system is attached to a fixed connection on the vessel and the facility except that when a vessel is receiving fuel, an automatic back pressure shutoff nozzle may be used. 33 CFR 156.120(g)
7. Each transfer hose has no unrepaired loose covers, kinks, bulges, soft spots, or any other defect which would permit the discharge of oil through the hose material and no gouges, cuts, or slashes that penetrate the first layer of hose reinforcement ("reinforcement" is the strength members of the hose, consisting of fabric, cord and/or metal). 33 CFR 156.120(i)
8. Each nonmetallic hose must be useable for oil service. 33 CFR 156.120(j) and 154.500(c)
9. Each hose assembly must either have full threaded connections or quick-connect couplings (with fasteners tied down). 33 CFR 156.120(j). 154.500(d), 156.120(k), and 156.130
10. Each hose must be marked with "BILGE/OILY WASTE CODE 342 MAX ALLOWED PRESS 200 PSI".
33 CFR 156.120(j), 154.500(e) and (f)
11. The hose burst pressure and pressure used for testing must not be marked on hose. 33 CFR
156.120(j) and 154.500(g)
12. Discharge containment equipment listed in Table 14-1 of the Bilge and Oily Waste Transfer Facility
Operations Manual (Section 11, Tab F of PWC Pearl Facility Incident Commander Plan for Oil and
Hazardous Substances Spills) is readily accessible or deployed. 33 CFR 156.120(m) and 154.545
13. Each hose handling area must be within a fixed catchment or curbing of a capacity of 84 gal. to contain oil discharged (risers) or portable means of not less than 5 gal capacity if a mobile facility (ship to truck).
Discharge containment must be in place and periodically drained. 33 CFR 156.120(n) and 154.530
14. All connections in the transfer system are leak free except that a component in the transfer system, such as the packing glands of a pump, may leak at a rate that does not exceed the capacity of the discharge containment provided during the transfer operation. 33 CFR 156.120(p)
15. Each facility must have a means that enables continuous two-way voice communication between the person in charge of the vessel transfer operation and the person in charge of the facility transfer operation.
33 CFR 156.120(q) and 154.560
BILGE. WATER
Initials
16. There is a person in charge on the transferring vessel and a different person in charge at the receiving facility. 33 CFR 156.120(s) and 156.115
17. Each person in charge required by item 16 above is: (a) at the site of the transfer operation, (b) immediately available to the transfer personnel, (c) has in his possession a copy of the facility operations manual or vessel transfer procedures, and (d) conducts the transfer operation in accordance with the operations manual or vessel transfer procedures. 33 CFR 156.120(t)
18. The personnel required, under the facility operations manual and vessel transfer procedures, to conduct the transfer operation: (a) are on duty and (b) conduct the transfer operation in accordance with the facility operations manual and vessel transfer procedures. 33 CFR 156.120(u)
19. At least one person as at the site of the transfer operation who fluently speaks the language or languages spoken by both persons in charge. 33 CFR 156.120(v)
20. Both persons in charge (facility and vessel) of the transfer operation have held a conference to ensure that each person in charge understands the following details of the transfer operation:
(a) The identity of the product to be transferred. 33 CFR 156.120(w)(1)
(b) The sequence of transfer operation. 33 CFR 156.120(w)(4)
(c) The transfer rate. 33 CFR 156.120(w)(3)
(d) The name or title and location of each person participating in the transfer operation. 33 CFR 156.120(w)(4)
(e) Details of the transferring and receiving systems. 33 CFR 156.120(w)(5)
(f) Critical stages of the transfer operation. 33 CFR 156.120(w)(6)
(g) Federal, state and local rules that apply to the transfer of oil. 33 CFR 156.120(w)(7)
(h) Emergency procedures. 33 CFR 156.120(w)(8)
(i) Discharge containment procedures. 33 CFR 156.120(w)(9)
(j) Discharge reporting procedures. 33 CFR 156.120(w)(10)
(k) Watch or shift arrangement. 33 CFR 156.120(w)(11)
(l) Transfer shutdown procedures. 33 CFR 156.120(w)(12)
21. Both persons in charge (facility and vessel) of the transfer operation agree to begin the operation. 33 CFR
156.120(x)
22. For operations between sunset and sunrise, there must be fixed lighting that adequately illuminates:
(a) Each transfer connection point and work area at the facility. 33 CFR 156.120(y), 154.570(a)(1), and (3)
(b) Each transfer connection point in use and work area on any barge moored at the facility from which oil is being transferred. 33 CFR 156.120(y), 154.570(a)(2), and (4)
(c) Lighting must be located or shielded so as not to mislead or otherwise interfere with navigation on the adjacent waterways. 33 CFR 156.120(y), 154.570(d)
I CERTIFY THAT ALL TESTS AND INSPECTIONS HAVE BEEN COMPLETED AND I AM READY TO BEGIN
TRANSFERRING BILGE AND OILY WASTE
BILGE & OILY WASTE TRANSFER FACILITY - NAVFAC HI
Person in Charge Person in Charge signature signature
Title Title
Time/date Time/date adr/forms/deconfins.xls (01/27/00)
BILGE. WATER OPER.
VESSEL
| FRONT |
| BACK |
File details come from the government source that posted it. Updated .