13-R-0506_RFP_Ft_Polk_FINAL.pdf
PDF 1 MB Posted
- Solicitation number
- SP0600-13-R-0506
- Issued by
-
Defense Logistics Agency Energy
About this file
Request for Proposal COCO Fuel Delivery Services Fort Polk LA
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP0600-13-R-0506 Fort Polk Optimization Fort Polk, LA
A. A pre-proposal conference in conjunction with the site visit will be held on Wednesday, March 27, 2013 commencing at 0830 hours at DPW-Real Property Office, Bldg. 2613, 6055 Georgia Ave., Fort Polk, LA 71459 (337) 531-1436. All conference attendees are requested to notify the Contract Specialist, Alan Smith, at w.h.alan.smith@dla.mil of your intention to attend by NOON on March 21, 2013. A valid picture ID will be required to gain access to the base.
B. The NAICS Code is 493190 and the threshold is $25.5 million (see 52.219-1). The point of contact for
Small Business Affairs is Mr. Greg Thevenin, telephone (703) 767-9465.
C. Your offer must be received in DLA Energy-FESAB by 3:00 p.m. local Ft Belvoir, VA time on April 16, 2013.
Facsimile proposals are not authorized. Do not return the entire solicitation package. Simply complete and return an original and one copy of the Offeror Submission Package data and the original and one (1) copy of the Price Proposal and the original and three (3) copies of the Technical Proposal . Your prices must be inserted in Clause B-0001 B34.01 in the Offeror Submission Package. Proposed prices that are unrealistically low may be considered an indication of a lack of understanding of the solicitation requirements.
D. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the offeror’s lack of cost consciousness. Elaborate artwork, expensive paper and bindings, and expensive visual and other presentations are neither necessary nor wanted.
E. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.
F. The Government intends to evaluate proposals and award one contract after written or oral discussions with all responsible offerors that submit proposals within the competitive range. This procurement will use Source Selection Procedures with trade-offs. See Clause 52.212-2 COCO evaluation factors.
G. Any contract awarded to a contractor who, at the time of award, was suspended, debarred, or ineligible for receipt of a Government contract is voidable at the option of the Government.
H. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.
mailto:w.h.alan.smith@dla.mil
CLAUSE INDEX
Page
SECTION B – SUPPLIES/SERVICES AND PRICES/COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991) 7
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
(SEE ATTACHMENT I)
SECTION D- PACKAGING AND MARKETING
52.247-9012 REQUIREMENTS FOR TREATMENT OF WOOD PACKAGING MATERIAL. (WPM) (DLAD FEB 2007) 7
SECTION E – INSPECTION AND ACCEPTANCE
52.246-4 INSPECTION OF SERVICES—FIXED-PRICE (AUG 1996) 8
E-0001 E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000) 8
E-0002 E22.01QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992) 9
E-0003 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY OCT 2002) 9
E-0004 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011) 10
E-0005 E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970) 11
SECTION F –DELIVERIES OR PERFORMANCE INSPECTION AND ACCEPTANCE
52.242-15 STOP – WORK ORDER (AUG 1989) 11
52.211-9072 GENERAL RECEIVING AND STORING CONDITIONS (DLAD NOV 2011) 11
F-0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997) 13
F-0002 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV 1997) 15
F-0003 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE) (DLA ENERGY DEC 1991) 16
SECTION G – CONTRACT ADMINISTRATION DATA
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—CENTRAL CONTRACTOR REGISTRATION (OCT 2003) 16
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991) 17
G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998) 17
G-0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY DEC 1999) 17
G-0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009) 17
G-0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997) 17
G-0005 G148.05 SUBMISSION OF INVOICES FOR PAYMENT (SERVICES) (DLA ENERGY MAR 2012) 18
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H-0001 H3.01 EPA TESTING OF UNDERGROUND TANKS (DLA ENERGY JAN 1992) 19
H-0002 H11 GUARD SERVICE (DLA ENERGY MAR 1982) 19
H-0003 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY NOV 1989) 19 H-0004 H51.03 INSURANCE REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS (DLA ENERGY MAY 2009) 19
SECTION I – CONTRACT CLAUSES
52.202-1 DEFINITIONS (JAN 2012) 20
52.203-3 GRATUITIES (APR 1984) 20
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010) 20
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010) 22
52.204-99 SYSTEM FOR AWARD MANAGEMENT REGISTRATION (AUG 2012)(DEVIATION) 24
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL ITEMS (NOV 2012) 25
52-215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997) 29
52-217-9 OPTION TO EXTEND THE TERMS OF THE CONTRACT (MAR 2000) 30
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2011) 30
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2011) 30
52.219-16 LIQUIDATED DAMAGES—SUBCONTRACTING PLAN (JAN 1999) 36
52.219-25 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM—DISADVANTAGED
STATUS AND REPORTING (DEC 2010) 36
52.222-26 EQUAL OPPORTUNITY (MAR 2007) 36
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989) 37
52.222-54 EMPLOYMENT ELIGILIABILITY VERIFICATION (JUL 2012) 37
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011) 39
52.223-6 DRUG-FREE WORKPLACE (MAY 2001) 39
52.223-10 WASTE REDUCTION PROGRAM (MAY 2011) 40
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) 40
52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) 40
52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997) 40
52.232-17 INTEREST (OCT 2010) 41
52.233-1 DISPUTES (JUL 2002) 41
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984) 42
52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984) 42
52.237-3 CONTINUITY OF SERVICES (JAN 1991) 42
52.245-2 GOVERNMENT PROPERTY INSTALLATION SERVICES (APR 2012) 42
52.246-25 LIMITATION OF LIABILITY—SERVICES (FEB 1997) 43
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) 43
252.215-7000 PRICING ADJUSTMENTS (DEC 1991) 43
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) (AUG 2012) 43
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004) 44
252-232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS. (JUN 2012) 45
252-232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS. (JUN 2012) 46
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) 47
52.204-9000 CONTRACTOR PERSONNEL SECURITY (DLAD MAY 2009) 47
52.232-9010 ACCELERATED PAYMENTS TO SMALL BUSINESS. (DLAD JUN 2012) 48
I-0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009) 49
I-0002 I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT -- PAYROLL TAX ADJUSTMENT
(DLA ENERGY JUL 1988) 50
I-0003 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY APR 2009) 51
I-0004 I116.01 LIABILITY FOR FUEL SPILLS (DLA ENERGY OCT 1998) 51
I-0005 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY JAN 2012) 51
I-0006 I147 DEMURRAGE (DLA ENERGY NOV 1989) 55
I-0007 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY MAY 1987) 55
SECTION J ATTACHMENTS 56
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) 56
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (SEP 2007) 56
52.204-5 WOMEN-OWNED BUSINESS OTHER THAN SMALL BUSINESS (MAY 1999) 57
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008) 57
52-209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010) 57
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (FEB 2012) 58
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (DEC 2012) 59
ALTERNATE I (APR 2002)
ALTERNATE II (OCT 2000)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (APR 2012) 65
ALTERNATE I (APR 2002)
52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OPERATIONS IN SUDAN—CERTIFICATION (AUG 2009) 66
252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005) 67
252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST COUNTRY (JAN 2009) 67
252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992) 67
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010) 68
52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEP 2007) 69
K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009) 69
K-0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) 69
K-0003 K150 WIDE AREA WORKFLOW (DLA ENERGY OCT 2008) 69
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (FEB 2012) 69
52.233-2 SERVICE OF PROTEST (SEP 2006) 71
52-215-9023 REVERSE AUCTION (JUL 2012) 71
52.233-9000 AGENCY PROTESTS (NOV 2011) 72
52.233-9001 DISPUTES: AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (ADR) (NOV 2011) 72
52.216-1 TYPE OF CONTRACT (APR 1984) 72
L-0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991) 72
L-0002 L2.31 PROPOSAL FORMAT AND CONTENT (JUN 2009) 73
L-0003 L7 SOCIOECONOMIC PROPOSAL (DLA ENERGY DEC 2001) 74
L-0004 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009) 74
SECTION M – EVALUATION FACTORS FOR AWARD
52.212-2 EVALUATION—COMMERCIAL ITEMS (JAN 1999) 75
M-0001 M7 SOCIOECONOMIC EVALUATION (DLA ENERGY APR 2003) 75
M-0002 M43.01 EVALUATION OF OPTIONS (DLA ENERGY MAR 2009) 76
M-0003 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) 76
SECTION B – SUPPLIES/SERVICES AND PRICES/COSTS
B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
(a) The services to be furnished during the period specified herein and the unit prices are as follows. The contract shall be for a period of five (5) years, with three 5-year renewal options. Offerors must submit a price for the total requirement. Award will be subject to execution of the Department of Army lease for Government Furnished Property.
Base Period Years 1 – 5:
CLIN 1001
CLIN 1002
Monthly Use Charge COCO Overtime COCO $ per month
$ 10,000.00 per 5 years Period (cost estimate)
First Option Period Years 6 - 10:
CLIN 2001
CLIN 2002
Monthly Use Charge COCO Overtime COCO $ per month
$ 10,000.00 per 5 years period (cost estimate)
Second Option Period Years 11 - 15:
CLIN 3001
CLIN 3002
Monthly Use Charge COCO Overtime COCO $ per month
$ 10.000.00 per 5 years period
Third Option Period Years 15 - 20:
CLIN 4001
CLIN 4002
Monthly Use Charge COCO Overtime COCO $ per month
$ 10,000.00 per 5 years period
(b) Overtime Rates. The following fully-loaded overtime rates will apply to work order under CLINs 1002, 2002, 3002 and
4002. No additional G&A or profit will be allowed.
OVRT at $ per hour
NOTE: Award will be made with an initial funding of the total base period cost. The option periods will be funded at the time they are exercised, if applicable. All G&A and profit for the overtime line items (1002, 2002, 3002 and 4002) should be included in CLINs 1001, 2001, 3001 and 4001, as appropriate.
SECTION C- DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
(SEE ATTACHMENT I)
SECTION D- PACKAGING AND MARKETING
52.247-9012 Requirements for Treatment of Wood Packaging Material. (WPM) (FEB 2007)
(a) This clause only applies when wood packaging material (WPM) will be used to make shipments under this contract and/or when
WPM is being acquired under this contract.
(b) Definition. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
(c) All wood packaging material (WPM) used to make shipments under Department of Defense (DOD) contracts and/or acquired by DOD must meet requirements of international standards for phytosanitary measures (ISPM) 15, “Guidelines for Regulating Wood Packaging Materials in International Trade.” DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) wood packaging material program and WPM enforcement regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally http://www.alsc.org/ opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved dunnage stamp.
(d) Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
SECTION E – INSPECTION AND ACCEPTANCE
52.246-4 Inspection of Services—Fixed-Price. (AUG 1996)
(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract.
Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
E-0001 E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
(a) Upon award, the Contractor shall prepare, in triplicate and in English, a Quality Control Plan (QCP). Prior to the first receipt of Government-owned product into the facility, two copies of the QCP shall be forwarded to the Contracting Officer and one copy to the assigned Quality Assurance Representative for approval.
(b) The QCP shall include the following quality control procedures employed by the Contractor.
(1) Receiving (both product and additives);
(2) Blending;
(3) Sampling;
(4) Testing;
(5) Storage and handling;
(6) Loading and shipping;
(7) Calibration program for testing and measuring equipment in accordance with ISO 10012-1, "Quality Assurance Requirements for Measuring Equipment, Part I." Equivalent local regulation, as appropriate, may be used as well. Whichever program used must include a section addressing meter proving (used to determine quantity) and must comply with the American Petroleum Institute Manual of Petroleum Measurement Standards, Chapters 4, 5, and 6, or equivalent foreign standard. For any item that requires calibration but is not covered by ASTM, API, or IP publications, the applicable manufacturer's recommended calibration method(s) outlined in the applicable industry publication shall be used if acceptable to the Government;
(8) Quantity measurement;
(9) Records and reports; and
(10) Corrective action procedures (to include, but not be limited to, procedures for notification of Quality Representative, actions to be taken on discovery of off-spec product during receipts/shipments, upgrading procedures for Contractor-caused contamination, leaks, etc.). The QCP shall also include an organizational chart of key personnel and their responsibilities and a schematic diagram of the facility with key inspection/activity points marked for each product handled.
(c) The QCP shall require that each Contractor employee be familiar with its content and shall state that it must be reviewed semiannually and revised as needed. Revision should occur when any change is made to the inspection system, when any corrective action needs to be incorporated due to quality problems, and as otherwise necessary. The Contractor shall sign and date each revision of the QCP.
E-0002 E22.01 QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992)
The Quality Office assigned inspection responsibility under this contract is DLA Americas East
E-0003 E28 CONTRACTOR INSPECTION RESPONSIBILITIES (STORAGE) (DLA ENERGY OCT 2002)
(a) Inspection and tests by the Government of services, facilities, and equipment specified within this contract does not relieve the Contractor from responsibility to meet all requirements of the contract.
(b) The Contractor shall furnish personnel, facilities, and equipment on-site to accomplish the following routine tests and procedures. These on-site resources may be provided by Contractor personnel or by a commercial source action on behalf of the Contractor.
The Quality Representative will not be responsible for performing any of these services for the Contractor.
(1) Sampling of storage tanks, shipments and receipts in accordance with ASTM D 4057, Standard Practice for Manual Sampling of Petroleum and Petroleum Products (API Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1); (2) Retaining of product composite samples from shipments and receipts as follows:
MINIMUM
METHOD OF SHIPMENT MINIMUM QUANTITY RETENTION PERIOD
Pipeline 20 liters 60 days Tanker/Barge Parcel Composite
20 liters
90 days
Each compartment 0.5 liters 90 days Navy Fleet Oilers/Vessels 10 liters 60 days Tank Truck/Car 1 liter 15 days
NOTE: After the minimum retention period, samples shall be tested for Appearance, Color (Visual), API Gravity/Density and Flash Point and, if found to be on-specification, shall be returned to like Government stock on-site. Sample containers may be reused if properly cleaned.
(3) Determining the presence of water in storage tanks, shipments and receipts. Ensure that accurate water cuts are obtained by means of a water indicating paste conforming to MIL-W-83779B. Two suggested sources are Stewart Hall Chemical Testmaster Water Indicating Paste or Sartomer Sar Gel Water Indicating Paste (see Note 2 below);
below);
(see Note 2 below);
(4) Determining Density at 15 degrees Celsius or API gravity of products by ASTM D 1298 or ASTM D 4052 (see Note 2
(5) Determining the temperature of products by the API MPMS, Chapter 7 (see Note 2 below);
(6) Determining the Appearance of applicable products using ASTM D 4176, Procedure 1 (see Note 2 below);
(7) Determining the visual color of products.
(8) Determining the Flash Point of applicable products using test methods cited in the appropriate product specification
(9) Conversion of gross to net gallonage (liters);
INTENTIONALLY LEFT BLANK
(10) Determining the percentage (volume) of fuel system icing inhibitor (FSII) by means of a portable refractometer in accordance with ASTM D 5006. One suggested source is H.B. Industries, Inc., Glenview, IL 60025 (B/2 Anti-Icing Additive test kit) (see Note 2 below); and
(11) Determining the range of fuel electrical conductivity using ASTM D 2624. One suggested source for a conductivity meter is Emcee Electronics, Inc., Sarasota, FL 33581 (Model 1152) (see Note 2 below).
Note 1: All costs for providing the above tests and procedures shall be included in the monthly service charge. The only exception to the Contractor’s obligation to provide these services as part of the monthly service charge is when the tests described above are part of the higher order analysis (defined as the following categories: Composite Samples, Storage Tanks After Receipt, Interface Mixtures, Dormant Stocks and Individual Tests (including particulate contamination) found in the attachment to the solicitations entitled MINIMUM REQUIREMENTS FOR STORAGE SAMPLING AND TESTING. Provisions for providing higher order analyses are covered in the SAMPLING AND TESTING OF PETROLEUM PRODUCTS (STORAGE) clause.
Note 2: Upon request, the Contractor shall permit the Quality Representative unrestricted use of the equipment and ancillary supplies needed to perform this test/procedure on behalf of the Government.
(c) During the contract, the Contractor shall furnish representative samples of the product in each storage tank, shipment or receipt at the request of, and in the manner and to the place designated by, the Quality Representative. Sample size will be 2 gallons for gasoline-type fuels and one gallon or 10 gallons for jet diesel-type fuels. The number of samples to be furnished during any 12-month period shall not exceed eight times the number of tanks specified in the contract. Such samples shall be packed, marked, and shipped by the Contractor, shipping expense prepaid, in containers and shipping boxes furnished by the Contractor. Sample containers shall be epoxy coated on the interior. This requirement is in addition to sampling required elsewhere in this clause and the contract. All reasonable direct shipping costs associated with samples required by this paragraph shall be reimbursed upon request from the Contractor and such costs shall not be included in the monthly service charge. However, all other costs related to this requirement shall be included as part of the monthly service charge.
E-0004 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)
(a) DEFINITION: As used in this contract provision:
Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.
Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).
Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.
(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.
(c) The following procedures shall be used to request a deviation or waiver.
(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor’s authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.
(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer. Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.
(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision of this contract.
(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.
(5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver. If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.
(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES – FIXED-PRICE, INSPECTION OF SERVICES – FIXED PRICE, or CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to—
(1) Consideration commensurate with the extent of nonconforming supplies; and
(2) Cost of Government reinspection or retest, if necessary.
The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.
(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.
(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.
E-0005 E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)
The facilities to be provided hereunder shall be ready for inspection and acceptance by the COR. The Contractor shall notify the Contracting Officer of the date such tanks and facilities are available for inspection and acceptance, and the Contracting Officer, or his designated representative, shall promptly thereafter inspect such tanks and facilities. No payment will be made for services performed or facilities provided prior to the start of the performance period.
SECTION F –DELIVERIES OR PERFORMANCE INSPECTION AND ACCEPTANCE
52.242-15 Stop-Work Order. (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the
Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
52.211-9072 General Receiving and Storing Conditions (NOV 2011)
Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.
When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to affect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the quality assurance representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions.
Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the Inspection And Cleaning Of Bulk Petroleum Storage Tanks clause.
Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.
Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.
The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
The following subparagraphs apply only to barges and tankers.
Scheduled arrival date and basic allowed laytime.
The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours’ notice for barges and the 72 hours’ notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, provided –
If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M.
local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
For barges: One hour for each 2,000 barrels of product to be unloaded.
For tankers: Thirty-six hours of discharge of a full vessel cargo. When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.
Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.
Increases to basic allowed laytime.
If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.
If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.
If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.
If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.
There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.
Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the
U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.
Payment of demurrage. For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
USS, USNS, or time chartered vessels. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the
Military Sealift Command and in effect on the date the loading of the vessel is completed.
Voyage chartered vessels. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
F-0001 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1.
When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of
(NAME and TITLE OF THE AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF CONTRACTOR'S DESIGNATED
REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property
Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.
(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.
(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.
(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by
Contractors unless placards are already affixed.
(g) FOR TANK CARS ONLY.
(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.
(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.
(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.
(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments.
Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.
(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order.
The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.
(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.
(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.
(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.
(m) Custody of product delivered to tanker or barge, and risk f loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.
(n) The Contractor shall be held accountable for demurrage charges arising from delay(s)in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(o) The following subparagraphs only apply to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.
(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours notice for barges and 72 hours notice for tankers will require verbal approval of the Contractor, confirmed in writing..
(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the
Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --
(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, laytime will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.
(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.
(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.
(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor. (2)
INCREASES TO BASIC ALLOWED LAYTIME.
(i) If, after laytime commences, the conditions or facilities of the barge or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .