SECTION II
ADDENDUM
PACKAGE
SOLICITATION: SP0600-11-R-0705
THE ENCLOSED SOLICITATION COVERS THE FOLLOWING TIME PERIOD(S):
NAVY REQUIREMENT
PERFORMANCE PERIOD
DATE OF AWARD THROUGH MAY 01, 2012
A-1
SECTION II
ADDENDUM PACKAGE
INDEX OF CLAUSES
CLAUSE NUMBER CLAUSE TITLE PAGE
SECTION B
INT-B1 SUPPLIES TO BE FURNISHED (BULK) (DLA ENERGY MAR 2009) A-5
SECTION C
INT-C1 SPECIFICATIONS (DLA ENERGY JAN 1997) A-6
INT-C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY MAR 2011) A-6
SECTION E
52.246-2 INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996) A-7
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008) A-8
INT - E1 CONTRACTOR INSPECTION RESPONSIBILITIES (NOV 2008) A-8
INT - E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS A-8
(DLA ENERGY JAN 2009)
INT-E14.02 INSPECTION AND ACCEPTANCE (BULK/SPR) (DLA ENERGY MAR 1996) A-9
INT-E33.07 MANUFACTURING AND FILLING POINTS (DLA ENERGY MAR 2006) A-11
(SEE OFFER SUMBISSION PACKAGE FOR FULL TEXT)
INT-E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY FEB 2011) A-11
INT-E40.05 MATERIAL INSPECTION AND RECEIVING REPORT (DLA ENERGY MAR 2000) A-12
SECTION F
52.211-16 VARIATION IN QUANTITY (APR 1984) A-12
52.211-9073 DETERMINATION OF QUANTITY (DLA ENERGY APR 2010) A-12
52.216-9055 CONTRACTOR ORDER RECEIPT AGENTS (DLA ENERGY JULY 2009) A-16
52.247-29 F.O.B. ORIGIN (FEB 2006) A-17
52.247-34 F.O.B. DESTINATION (NOV 1991) A-17
INT-F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS A-18
TRANSPORT TRUCKS, TRUCKS AND TRAILERS, TANK WAGONS
PIPELINE, AND LIGHTERS (DLA ENERGY JUN 2002)
INT-F3.02 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME A-19
AND DETENTION RATES (BULK/LUBES)(DLA ENERGY JUN 1996)
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
A-2
INT-F4 DELIVERY AND ORDERING PERIOD (DLA ENERGY JUN 2002) A-19
INT-F14 SHIPMENT AND ROUTING (DLA ENERGY MAR 2003) A-20
SECTION G
52.232-38 SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH A-21
OFFER (MAY 1999)
INT-G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998) A-21
INT-G6 INVOICE DISCREPANCIES (BULK) (DLA ENERGY SEP 2002) A-21
INT-G9.07 ELECTRONIC TRANSFER OF FUNDS PAYMENTS –CORPORATE TRADE A-21
EXCHANGE (DLA ENERGY JUL 2007)
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
INT-G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS –FEDERAL RESERVE WIRE A-21
TRANSFER SYSTEM (DLA ENERGY JAN 2007)
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
INT-G12 SUPPLEMENTAL INVOICING INFORMATION (BULK) (DLA ENERGY SEP 2002) A-21
INT-G150.05 SUBMISSION OF INVOICES FOR PAYMENT – COMMERCIAL ITEMS A-21
(BULK) (DLA ENERGY MAR 2009)
SECTION H
INT-H19.02 REPORTING REQUIREMENTS FOR SHIPMENTS (DLA ENERGY OCT 2007) A-23
SECTION I
52.216-18 ORDERING (OCT 1995) A-24
52.232-17 INTEREST (OCT 2010) A-24
52.243-1 CHANGES – FIXED PRICE (AUG 1987) A-25
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND A-25
RECEIVING REPORTS (MAR 2008)
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) A-26
253.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (APR 2003) A-26
INT-I1.01 DEFINITIONS (BULK) (DLA ENERGY JUN 2009) A-26
INT-I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE - COMMERCIAL ITEMS. A-27
(DLA ENERGY FEB 1996)
INT-I28.01 FEDERAL, STATE, AND LOCAL TAXES (DLA ENERGY JAN 2008) (DEVIATION) A-27
INT-I28.02-1 FEDERAL AND STATE TAXES/FEES (DLA ENERGY JUL 2006) A-28
INT-I28.03-1 TAX EXEMPTION CERTIFICATES (DLA ENERGY AUG 2003) A-28
INT-I28.24 U.S. IMPORT TAX ON PETROLEUM (BULK) (DLA ENERGY DEC 1980) A-29
INT-I86.12 DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT (BULK). A-29
(DLA ENERGY MAY 2010)
A-3
INT-I186 PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION A-29
(DLA ENERGY FEB 2009)
INT-I190.04 MATERIAL SAFETY DATA SHEETS –COMMERCIAL ITEMS (BULK) A-30
(DLA ENERGY JUN 2010)
INT-I211.02 ORDERING (CONT’D) (DLA ENERGY JAN 1991) A-30
SECTION J
OSP ATTACHMENTS
STANDARDIZED FORMAT FOR USE IN THE PREPARATION OF ATTACHMENT 1 TO OSP
PRODUCT TEST REPORTS
DLA ENERGY FORM 19.3– SMALL BUSINESS SUBCONTRACTING PLAN ATTACHMENT 2 TO OSP
ADDENDUM ATTACHMENTS
NAVY SPECIFICATIONS FOR HRJ5 AND HRD76 ATTACHMENT 1
CONTRACTOR INSPECTION RESPONSIBILITIES FOR HYDRO-TREATED ATTACHMENT 2
RENEWABLE JP5 (HRJ5) AND MARINE DIESEL F76 (HR76) FUEL (DLA ENERGY JUNE 2011)
SECTION K
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008) A-30
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING A-31
RESPONSIBILITY MATTERS
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL A-31
ITEMS (DLA ENERGY MAR 2011)f
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A-31
A TERRIORIST COUNTRY (JAN 2009)
252.212-7000 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL A-32
ITEMS (JUN 2005)
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992) A-32
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
INT-K1.01-7 OFFEROR RPSENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS A-32
(CONT’D) (DLA ENERGY FEB 2009)
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)CAN’T FIND
INT-K5 USE OF ELECTRONIC DATA INTERCHANGE (DLA ENERGY MAR 2009) A-32
INT-K15.01 RELEASE OF UNIT PRICES (BULK) (DLA ENERGY NOV 2002) A-32
INT-K28 REFINERY INFORMATION (BULK) (DLA ENERGY JUN 1986) A-32
INT-K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) A-32
(SEE OFFER SUBMISSION PACKAGE FOR FULL TEXT)
INT-K45.01 FACSIMILE OR ELECTRONIC INVOICING (DLA ENERGY JAN 1998) A-32
A-4
INT-K86 FOREIGN TAXES (DLA ENERGY JUN 1987) A-32
SECTION L
52.215-5 FACSIMILE PROPOSALS (OCT 1997) A-33
52.216-1 TYPE OF CONTRACT (APR 1984) A-33
52.247-45 F.O.B. ORIGIN AND/OR F.O.B. DESTINATION EVALUATION (APR 1984) A-33
52.233-9000 AGENCY PROTESTS (SEP 1999) – DLAD A-33
INT-L2.07 EVIDENCE OF RESPONSIBILITY (DLA ENERGY JAN 1998) A-33
INT-L2.09 EVIDENCE OF RESPONSIBILITY (OPERATING CRITERIA) (DLA ENERGY MAR 2000) A-33
INT-L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010) A-34
SECTION M
INT-M4.01 RIGHT TO APPLY F.O.B. ORIGIN OFFER (DLA ENERGY JAN 1976) A-34
INT-M10 EVALUATION - ALL OR NONE ( DLA ENERGYMAR 2000) A-34
INT-M27 EVALUATION OF OFFERS (DOMESTIC BULK) (DLA ENERGY MAR 1996) A-34
INT-M41 EVALUATION OF OFFERS - TRANSPORTATION RATES AND RELATED COSTS A-35
(DOMESTIC PC&S AND LUBES) (DLA ENERGY SEP 2000)
INT-M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997) A-35
A-5
SECTION B
INT-B1 SUPPLIES TO BE FURNISHED (BULK) (DLA ENERGY MAR 2009)
(a) The minimum and maximum quantities are defined in the DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT clause.
(b) The supplies to be furnished during the contract period and all associated data are as follows:
HYDROTREATED RENEWABLE JP-5 (HRJ5)
REQUIREMENT – DATE OF AWARD THROUGH MAY 01, 2012
NOTES:
1. FOB Origin/FOB Destination into Tank Truck (TT).
2. FOB Origin TT offers will be evaluated directly to the end-user locations.
ITEM LOCATION TOTAL QTY (USG) FOB PRICE/USG
0001 FISC PUGET SOUND, WA 100,000 _______ $_________
MODE FSII SDA CI AO_______
TRUCK NONE NONE REQUIRED REQUIRED
HYDROTREATED RENEWABLE F-76 (HRD76)
REQUIREMENT – DATE OF AWARD THROUGH MAY 01, 2012
NOTES:
1. FOB Origin/FOB Destination into Tank Truck (TT).
2. FOB Origin TT offers will be evaluated directly to the end-user locations.
ITEM LOCATION TOTAL QTY (USG) FOB PRICE/USG
0002 FISC PUGET SOUND, WA 350,000 _______ $_________
MODE FSII SDA CI AO_______
TRUCK NONE NONE REQUIRED REQUIRED
NAVY HRJ5 AND HRD76 REQUIREMENTS:
1. The ordering period is DATE OF AWARD through May 01, 2012
2. Any resultant contract will be Firm Fixed Price.
3. Materials: Both HRJ5 and HRD76, fuel shall consist predominantly of n-paraffins, iso-paraffins and cylcoparaffins and shall be produced solely from triglycerides and free fatty acids derived from either plant or algal oils.
4. Chemical and physical requirements: The chemical and physical requirements of the finished HRJ5 and HRD76 shall conform to those listed in the Navy specifications (see Attachment 1 of the Addendum Package).
5. Feedstock: Fuel feedstocks derived from tallow for HRJ5 and HRD76 fuel are not acceptable. The Government contemplates restriction of feedstock sources to those produced within the USA or Canada. The HRJ5 and HRD76 fuel must be produced within the USA.
6. Production: The offeror shall provide a general description of how the offeror will ensure a reliable supply of specification compliant product to meet the Government’s requirements as stated in the solicitation.
A-6
1. Describe the entire process used to manufacture the refined fuel; from feedstock production through production of the finished fuel product.
2. Describe the type of all feedstocks used to produce the feedstock oils. Identify the locations and process used to produce the feedstock oil. If the oil is a blend, identify the type and percentage of each oil in the blend and the source of the oils.
3. If the offeror is not the manufacturer for every step in the production cycle, the offeror shall provide supply and / or manufacturing commitments for production processes not performed by the offeror.
4. The offeror shall provide information regarding its production capability per day, and ability to meet the delivery schedule. If the offeror is not the manufacturer for any step in the production cycle, the offeror shall provide documentation regarding the production capability of its subcontractors for those steps (i.e. oil production, oil extraction, oil refinement).
5. The offeror shall provide substantiation of the technical maturity of the producer’s fuel, and its ability to meet specification requirements. This shall include, but is not limited to, laboratory test results showing compliance with the specification requirements of the fuel and identification of the laboratory that performed the evaluation.
6. The offeror shall supply a Material Safety Data Sheet (MSDS) for the finished fuel product offered.
7. The offeror shall supply a quality control plan, See Attachment 2 of the Addendum Package.
SECTION C
INT-C1 SPECIFICATIONS (DESC JAN 1997)
Product to be supplied shall fully meet the requirements of the applicable specification(s) as indicated in the Supply Schedule, except as modified elsewhere in this contract. Unless otherwise indicated by the Contractor, prior to award and in accordance with the EVALUATION OF OFFERS clause, the product offered will be assumed to fully meet the applicable specification(s).
INT-C1.02 ASSIST DATABASE OF SPECIFICATIONS (DLA ENERGY MAR 2011)
Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System (ASSIST) database at https://assist.daps.dla.mil/ or http://dodssp.daps.dla.mil/ under ASSIST-Quick Search. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for DoD use. Those who register for an ASSIST account may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database from the DoD Single Stock Point website (http://dodssp.daps.dla.mil/) under the [ASSIST Update] menu.
https://assist.daps.dla.mil/� http://dodssp.daps.dla.mil/� http://dodssp.daps.dla.mil/�
A-7
SECTION E
52.246-2 INSPECTION OF SUPPLIES – FIXED PRICE (AUG 1996)
(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)
(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either
(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or
(2) terminate the contract for default.
Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)
(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --
(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract;
and
(ii) When the supplies will be ready for Government inspection.
A-8
52.246-2 (CONT’D)
(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor
(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or
(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
INT - E1 CONTRACTOR INSPECTION RESPONSIBILITIES (NOV 2008)
For use in domestic and overseas streamlined solicitations/contracts for all bulk aviation fuels, lubes, and additives, and bulk non-aviation fuels delivered by pipeline or waterborne transport, or as designated on the purchase request. When used in domestic and overseas PC&S solicitations/contracts, the clause applies to all aviation fuel deliveries and other fuels delivered by pipeline or waterborne transport.
INT-E14.02 INSPECTION AND ACCEPTANCE (BULK/SPR) (DLA ENERGY MAR 1996)
On f.o.b. origin deliveries, acceptance of the supplies furnished hereunder will take place at origin, notwithstanding that inspection by the Government may take place elsewhere prior to acceptance. On f.o.b. destination deliveries, acceptance of the supplies furnished hereunder will take place at destination, notwithstanding that inspection by the Government may take place elsewhere prior to acceptance.
Acceptance occurs when the authorized Government Representative signs the Material Inspection and Receiving Report (DD Form 250 series).
The office responsible for inspection, on behalf of the Government, shall be as follows:
SOURCE OF PRODUCT
ITEM(S) AND/OR SHIPPING POINT INSPECTOR(S)
TO BE DETERMINED BY DLA ENERGY PRIOR TO CONTRACT AWARD
A-9
INT - E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS
(DLA ENERGY JAN 2009)
The following lists shall be used to identify the Government inspection office assigned inspection responsibility for DLA Energy contracts in a particular geographic area. These contracts include, but are not limited to, those for bulk petroleum products and additives, into-plane refueling, petroleum storage and laboratory services, coal, aerospace energy (including compressed gases), and posts, camps, and stations. The area of inspection responsibility and corresponding office code are assigned in paragraphs (a) and (b). The address and phone number of each inspection office by office code is provided in paragraph (c). Unless a particular inspection office is identified in another part of the contract, the assignments in this clause shall apply.
(a) AREAS OF RESPONSIBILITY AND OFFICE CODES WITHIN THE CONTINENTAL UNITED STATES (CONUS):
Alabama 110 Maine 110 Oklahoma 110 Arizona 120 Maryland 110 Oregon 120 Arkansas 110 Massachusetts 110 Pennsylvania 110 California 120 Michigan 110 Rhode Island 110 Colorado 120 Minnesota 110 South Carolina 110 Connecticut 110 Mississippi 110 South Dakota 110 Delaware 110 Missouri 110 Tennessee 110 District of Columbia 110 Montana 120 Texas 110 Florida 110 Nebraska 110 Utah 120 Georgia 110 Nevada 120 Vermont 110 Idaho 120 New Hampshire 110 Virginia 110 Illinois 110 New Jersey 110 Washington 120 Indiana 110 New Mexico 120 West Virginia 110 Iowa 110 New York 110 Wisconsin 110 Kansas 110 North Carolina 110 Wyoming 120 Kentucky 110 North Dakota 110 Louisiana 110 Ohio 110
EXCEPTIONS:
(1) The El Paso, Texas, area is assigned to Code 120 (DLA Energy Americas – West).
(2) The Newcastle, Wyoming, area is assigned to Code 110 (DLA Energy Americas – East).
(b) AREAS OF RESPONSIBILITY AND OFFICE CODES OUTSIDE THE CONTINENTAL UNITED STATES (OCONUS)
(INCLUDING ALASKA AND HAWAII):
Afghanistan 400 Cyprus 200 Malaysia 300 Singapore 300 Africa 2001 Egypt 4001 Maldives 300 South America 110 Alaska 300 Europe (Continental) 200 Malta 200 South Korea 300 Antarctica 300 Georgia 200 Mauritius 200 Sri Lanka 300 Armenia 200 Greenland 200 Mexico 110 Syria 400 Ascension Island 110 Hawaiian Islands 300 Midway Island 300 Taiwan 300 Australia 300 Hong Kong 300 Mongolia 300 Tajikistan 400 Azerbaijan 200 Iceland 200 Myanmar 300 Thailand 300 Azores 200 India 300 Nepal 300 Turkey 200 Bahrain 400 Indonesia 300 New Zealand 300 Turkmenistan 400 Bangladesh 300 Ireland 200 North Korea 300 United Arab Bermuda 110 Iran 400 Oman 400 Emirates 400 Bhutan 300 Iraq 400 Pacific Islands United Kingdom 200 Brunei 300 Israel 200 (Central & South) 300 Uzbekistan 400 Cambodia 300 Japan 300 Pakistan 400 Vietnam 300 Canada 110/1202 Jordan 400 Papua New Guinea 300 Wake Island 300 Canary Island 200 Kazakhstan 400 Philippines 300 Yemen 400 Caribbean Islands 110 Kuwait 400 Qatar 400 Central America 110 Kyrgyzstan 400 Russia 200 Chagos Archipelago 300 Laos 300 Ryukus Islands, Japan 300
A-10
INT - E22 (CONT’D)
China 300 Lebanon 400 Saudi Arabia 400 Comoros 200 Madagascar 200 Seychelles Is. 420
[1] Except for Egypt, which is assigned to DLA Energy Middle East (Code 400), all other countries in Africa fall under DLA Energy Europe (Code 200).
[2] The provinces of Manitoba, Ontario, Quebec, Newfoundland and Labrador, New Brunswick, Nova Scotia, and Prince Edward Island are assigned to DLA Energy Americas East (Code 110). The rest of Canada falls under DLA Energy Americas West (Code 120).
(c) INSPECTION OFFICES AND CODES.
110. DLA Energy Americas East 3 ATTN: Quality Manager Federal Building, Room 1005 2320 LaBranch Street Houston, TX 77004-1091 Phone: (713) 718-3883, ext. 162/161/160
FAX: (713) 718-3891
120. DLA Energy Americas West 3 ATTN: Quality Manager 3171 N Gaffey Street San Pedro, CA 90731-1099 Phone: (310) 241-2806/2807
FAX: (310) 241-2836
200. DLA Energy Europe 3 Mailing Address:
DLA Energy Petroleum Lab ATTN: Quality Manager
CMR 422
APO AE 09067-0422
[Location: Kaiserslautern, Germany] Phone: 49-631-3406-2285/2286 4
FAX: 49-631-3406-2289 4
Shipping Address:
DLA Energy Petroleum Lab ATTN: Quality Manager Rhine Ordinance Barracks , Bldg 320 Am Opelkreisel 67663 Kaiserslautern, Germany
300. DLA Energy Pacific 3 ATTN: Quality Manager 1025 Quincy Avenue, Building 479, Suite 2000 Pearl Harbor, HI 96860-4512 Phone: (808) 473-4307/4287
FAX: (808) 473-4232
400. DLA Energy Middle East 3 ATTN: Quality Manager PSC 451, Box DLA Energy-ME
FPO AP 09834-2800
[Location: Juffair, Bahrain] Phone: 973-17-85-4658/4665 4
FAX 973-17-85-4670 4
A-11
INT - E22 (CONT’D)
[3] Designated location of the DLA Energy Regional Quality Manager/Pre-Award Survey Monitor.
[4] Dial 011 before these numbers when calling from the U.S. When calling these numbers from outside the U.S., use the appropriate international long distance prefix for the country where the call originates.
INT-E33.07 MANFUCTURING AND FILLING POINTS (DLA ENERGY MAR 2006)
INT-E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY FEB 2011)
(a) DEFINITION: As used in this clause:
Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.
Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).
Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.
(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.
(c) The following procedures shall be used to request a deviation or waiver.
(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE clause of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor’s authorized negotiator; contract number; contract line item number and product nomenclature, clause number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.
(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer. Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.
(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.
(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.
(5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver. If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.
(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES – FIXED-PRICE, INSPECTION OF SERVICES
– FIXED PRICE, or CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to—
A-12
INT-E35 (CONT’D)
(1) Consideration commensurate with the extent of nonconforming supplies; and
(2) Cost of Government reinspection or retest, if necessary.
The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.
(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.
(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.
INT-E40.05 MATERIAL INSPECTION AND RECEIVING REPORT (DLA ENERGY MAR 2000)
(a) One copy of the documents and reports listed below shall be mailed to--
ATTN DESC-BP (LR) ROOM 2954
DEFENSE ENERGY SUPPORT CENTER
8725 JOHN J KINGMAN ROAD SUITE 4950
FORT BELVOIR VA 22060-6222
(b) Laboratory reports shall be in the Standard Report Format given in Attachment 2 for the Standardized Format for Use in Preparation of Product Test Reports. Include, where applicable, information on any intermediate shipping or holding tanks with batch number designations used to define the product movement. Use the guidelines below to determine when to submit the laboratory reports.
(1) MARINE SHIPMENTS. Submit a completed DD Form 250-1, test reports, and vessel ullage reports for all products shipped. If more than one shipping tank was used for the lift, include a complete analysis of each shipment tank and clearly indicate the quantity of product drawn from each tank.
(2) PIPELINE SHIPMENTS. Submit a completed DD Form 250, copy of order (DD Form 1155), and complete laboratory results for total quantity of product shipped from each shipping tank used to fill the order. Insure test methods or test codes as defined in the Attachment are specified on the test report.
(3) TRUCK AND RAIL CAR SHIPMENTS. When loading from source tank has finished, submit one copy of the complete laboratory analysis for the source tank and attach all DD Forms 250 for product received from that source tank. Insure test methods or test codes as defined in the Attachment are specified on the test report.
(c) If only one shipment is made from a shipping tank, then the quantity of the Standard Report Format should represent the quantity shipped and not the tank capacity or the quantity in the tank at the time of sampling. If more than one shipment was made from the same shipping tank, the quantity can either be left blank or annotated with the quantity shipped during that individual shipment.
(d) In all cases, the DD Form 250 or DD Form 250-1 should contain information that will connect the shipment being documented with the product source tank used. This information includes batch number, tank approval date, and tank number. Insure that the "city" indicated on the Standard Test Report Form matches the city from which the shipment was made that is indicated in the "Shipped From" block on the DD Form 250 series document.
SECTION F
52.211-16 VARIATION IN QUANTITY (APR 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.
(b) The permissible variation shall be limited to:
Percent increase
This increase or decrease shall apply to Percent decrease
ALL ITEMS.
52.211-9073 DETERMINATION OF QUANTITY (DLA ENERGY APR 2010)
(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined as follows:
(1) F.O.B. ORIGIN. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(i) DELIVERIES INTO TANKER OR BARGE. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of—
(A) Calibrated meter; or
A-13
52.211-9073 (CONT’D)
(B) Shipping/shore tank measurement.
(ii) DELIVERIES INTO PIPELINE. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b.
origin basis into a pipeline, the quantity shall be determined (at the Contractor's option) on the basis of—
(A) Calibrated meter; or
(B) Shipping tank measurements.
(iii) DELIVERIES INTO RAIL TANK CAR. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of—
(A) Calibrated loading rack meter; or,
(B) using calibrated scales; or
(C) Certified capacity table for the rail tank car.
(iv) DELIVERIES INTO TANK TRUCK, TRUCK AND TRAILER, OR TANK WAGON. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tank truck, truck and trailer or tank wagon, the quantity shall be determined (at the Contractor's option) on the basis of—
(A) Calibrated loading rack meter; or
(B) Weight, using calibrated scales; or
(C) Certified capacity table for the conveyance or container.
(v) DELIVERIES INTO INTERMODAL CONTAINER. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into an intermodal container, the quantity shall be determined (at the Contractor's option) on the basis of—
(A) Calibrated loading rack meter, loading either through top or bottom tank outlets (top loading requires loading gantry or "fall arrest" system), or
(B) Certified capacity table for the container, or
(C) Weight, using calibrated scales.
(2) F.O.B. DESTINATION.
(i) DELIVERIES BY TANKER OR BARGE.
(A) On items requiring delivery on an f.o.b. destination basis by tanker or barge, the invoice quantity shall be determined (at the Government's option) on the basis of—
(a) Calibrated meters on the receiving tank system; or
(b) Receiving tank measurements.
(B) All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(ii) DELIVERIES BY PIPELINE.
(A) On items requiring delivery by pipeline on an f.o.b. pipeline junction or f.o.b. destination basis, the invoice quantity shall be determined (at the Government's option) on the basis of—
(a) Calibrated meters on the pipeline junction or the receiving tank system; or
(b) Receiving tank measurements.
(B) F.O.B. pipeline junction is defined as the junction between a Contractor-owned or controlled pipeline and a Government-owned or controlled pipeline.
(C) All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
A-14
(iii) DELIVERIES BY RAIL TANK CAR.
(A) On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government's option) on the basis of—
(a) Calibrated meter on the receiving tank system; or
(b) Weight, using calibrated scales at the receiving location; or
(c) Certified capacity table for the rail tank car; or
(d) Receiving tank measurements.
(B) All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(iv) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON/INTERMODAL CONTAINER.
(A) On items requiring delivery on a f.o.b. destination basis by tank truck, truck and trailer, tank wagon or intermodal container, the quantity shall be determined —in the following order of preference:
(a) Calibrated temperature compensating meters on the receiving system (as identified in the schedule).
(b) Calibrated temperature compensating meter on the delivery conveyance (as identified in the schedule).
(c) Weight, using calibrated scales at the receiving location (as identified in the schedule).
(d) Calibrated meters on the receiving system, requiring manual volume correction (as identified in the schedule).
(e) Loading ticket mechanically imprinted with the volume corrected (net) quantity. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter or calibrated scales.
(f) Calibrated meter on the delivery conveyance, requiring manual volume correction.
(g) Loading ticket, not volume corrected (requiring manual volume correction).
(B) Invoice quantities for all residual fuels and lubricating oils and invoice quantities for other products that are in excess of 5,000 gallons (or 18,900 liters) shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). Invoice quantities of nonresidual fuels which are less than 5,000 gallons (or 18,900 liters) do not require correction to net gallons (or liters). For this purpose, residual fuels are any products with a viscosity equal to or greater than a regular (not light) No. 4 Fuel Oil (ASTM D 396).
(b) WATER BOTTOMS.
(1) Every delivery must be free of all water bottoms prior to discharge; and
(2) The Contractor is responsible for their removal and disposal.
(c) MEASUREMENT RESTRICTIONS. All methods of measurement described in this clause are subject to government safety and environmental restrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.
(d) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the U.S., other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor to the aforementioned measurement and calibrations standards. In addition, the following specific standards will be used as applicable:
(1) API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and ISO 91-1). Either the 2004 or 1980 version of the standard may be used. Either the printed tables (an adjunct to the 1980 version) or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine for the 2004 version of the standard will be the referee method.
A-15
(i) For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.
(ii) For lubricating oils, use Tables 5D and 6D, Tables 53D and 54D, or Tables 23D and 24D.
(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VIII, Tables 53B and 54B; or Volume V, Tables 23B and 24B.
(iv) For chemicals/additives use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.
(v) Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels at 60 degrees Fahrenheit.
Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.
(vi) As an option to (b) (1) (v), liters may be converted to gallons using Table F1.09A (see below). If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
(vii) If the original measurement is by weight and quantity is required in U.S. gallons, then—
(A) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
(B) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit.
(2) API MPMS, Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 12 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which as a minimum contains—
(i) Number/name of each meter;
(ii) Calibration frequency;
(iii) Date of the last calibration;
(iv) Due date for next calibration;
(v) Name and signature of the person performing the calibration;
(vi) Traceability to master meter/prover used for calibration; and
(vii) Calibration report number.
Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter records and logs/certificates shall be kept on file and made available upon request. All calibration records (including logs or certificates) shall be retained on file for a period of three years.
(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of a tank shell correction factor is not required unless its use is a customary practice for custody transfer.
TABLE F1.09A CONVERSION FACTOR TABLE
Density @ 15ºC Gallons at 60ºF to Liters at 15ºC; Multiply by Liters at 15C to Gallons at 60F, Multiply by
0.723 – 0.768 3.78286 0.26435
0.769 – 0.779 3.78309 0.26433
A-16
0.780 – 0.798 3.78334 0.26432
0.799 – 0.859 3.78356 0.26430
0.860 – 0.964 3.78381 0.26428
0.965 – 1.074 3.78405 0.26427
(e) SHIPPING DOCUMENTATION. When the contractor’s shipping document (such as a truck’s metered ticket) is used to determine, or verify, the payment quantity under this contract, the following information shall be provided on that shipping document: gross and net quantity (gallons or liters, as required), observed and corrected API gravity/density, and the temperature (Fahrenheit or Celsius) at which the product was measured. This information shall be mechanically imprinted on the shipping document. Although this will apply primarily to the use of meters in various applications, it also applies to any other quantity determination method. The following exceptions apply:
(1) Where government documents are the sole basis for payment, such as DD Form 250/250-1s, the information is not required.
(2) Where conveyances with temperature-compensating meters are used, the shipping document shall only be annotated with the corrected API gravity/density, the net quantity, and a statement that a temperature-compensating meter was used to determine net quantity.
(3) Where conveyances with temperature compensating meters are not used, the shipping document shall be only be annotated with the API gravity (or density), gross quantity, and a statement that volume correction was not required.
(f) RIGHT TO REPRESENTATIVE. For FOB origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For FOB destination deliveries, the Contractor has the right to have a representative present to witness the delivery and measurement of quantity.
CHANGES – MILITARY READINESS (Mar 2001) – DLAD
The commercial changes clause at FAR 52.212-4(c) is applicable to this contract in lieu of the changes clause at FAR 52.243-1. However, in the event of a Contingency Operation or a Humanitarian or Peace Keeping Operation, as defined below, the contracting officer may, by written order, change 1) the method of shipment or packing, and 2) the place of delivery. If any such change causes an increase in the cost of, or the time required for performance, the contracting officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract. The contractor must assert its right to an adjustment within 30 days from the date of receipt of the modification.
“Contingency operation” means a military operation that-
(i) Is designated by the Secretary of Defense as an operation in which members of the armed forces are or may become involved in military actions, operations, or hostilities against an enemy of the United States or against an opposing military force; or
(ii) Results in the call or order to, or retention on, active duty of members of the uniformed services under 10 U.S.C. 688, 12301(a), 12302, 12304, 12305, or 12406, chapter 15 of U.S.C., or any other provision of law during a war or during an national emergency declared by the President or Congress (10 U.S.C. 101(a)(13)).
“Humanitarian or peacekeeping operation” means a military operation in support of the provision of humanitarian or foreign disaster assistance or in support of peacekeeping operation under Chapter VI or VII of the Charter of the United Nations. The term does not include routine training, force rotation, or stationing. (10 U.S.C. 2302 (8) and 41 U.S.C. 259(d)(2)(B)).
52.216-9055 CONTRACTOR ORDER RECEIPT AGENTS (DLA ENERGY JULY 2009)
Orders placed hereunder shall be directed to the prime Contractor at the address indicated in block 17a of the SF1449 unless another address is indicated below. All addresses indicated below shall belong to the prime contractor or agents authorized to receive orders on behalf of the prime contractor. Orders may be placed at different locations for different line items. If all orders are to be placed with one office, state: "all" in the first column below. The Contractor shall be responsible for seeing that orders are forwarded to any regional or area offices from which product is to be shipped in such time as to accomplish delivery within the permissible delivery lead time set forth under the clause. The prime contractor will be held responsible for the delivery and performance of any and all of its designated order receipt agents. For this purpose, date of receipt of the order as specified under the clause shall be the date on which the order is received by the office to which it is addressed.
ITEM NUMBER CONTRACTOR AGENT'S NAME AND ADDRESS
A-17
52.247-29 F.O.B. ORIGIN (FEB 2006)
(a) The term “f.o.b. origin,” as used in this clause, means free of expense to the Government delivered—
(1) On board the indicated type of conveyance of the carrier (or of the Government, if specified) at a designated point in the city, county, and State from which the shipment will be made and from which line-haul transportation service (as distinguished from switching, local drayage, or other terminal service) will begin;
(2) To, and placed on, the carrier’s wharf (at shipside, within reach of the ship’s loading tackle, when the shipping point is within a port area having water transportation service) or the carrier’s freight station;
(3) To a U.S. Postal Service facility; or
(4) If stated in the solicitation, to any Government designated point located within the same city or commercial zone as the f.o.b.
origin point specified in the contract (the Federal Motor Carrier Safety…