Installation Data Sheet Amendment 0004.xlsx

XLSX spreadsheet 67 KB Posted

Attached to
Strategic Petroleum Reserve Federal contract opportunity
Solicitation number
SP0600-11-R-0440
Issued by
Defense Logistics Agency Energy

About this file

Amendment 0004 Installation Data Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Strategic Petroleum Reserve, newest first.
File Type Posted
Attachment III_ Amendment 0004.pdf PDF
SP0600-11-R-0440_Amendment 0004.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.doc DOC document
SP0600-11-R-0440_Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
SP0600-11-R-0440_Amendment 0002.pdf PDF
Attachment III_ Amendment 0001.xls XLS spreadsheet
SP0600-11-R-0440_Amendment 0001.pdf PDF
Amendment 0001.pdf PDF
Installation Data Sheet Amendment 0001.xls XLS spreadsheet
SP0600-11-R-0440.pdf PDF
Attachment II - Experience with End Users.pdf PDF
Attachment III.xlsx XLSX spreadsheet
Attachment IV.pdf PDF
Attachment I - Retail Customers Credit Rating Information.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Historical Data

Strategic Petroleum Reserve Bryan Mound
Delivery Period: Meter read in Mach 2010 through Meter read in March 2012.
LineMeter ReadTotalOn PeakOff PeakDelivery
ItemAccountUtilityDatekWh UsagekWhkWhKW
4814a1008901000144290012100Centerpoint5/31/11101,536.25--208.00
5/1/1192,610.75--187.00
Svc Address:1900 FPT Bryan Mound Road, Angleton, TX 775153/31/1173,129.25--165.00
Rate Code: 9932/28/1196,624.00--314.00
1/31/1192,993.75--248.00
1/2/1194,700.50--218.00
11/30/1087,717.25--227.00
10/31/10103,259.75--229.00
9/30/10125,664.7565,805.2559,859.50234.00
8/31/10132,017.2566,600.2565,417.00237.00
8/1/10134,777.2565,972.7568,804.50220.00
6/30/1093,554.2547,042.5046,511.75223.00
Total1,228,585.00
Strategic Petroleum Reserve Bryan Mound
Delivery Period: Meter read in Mach 2010 through Meter read in March 2012.
LineMeter ReadTotalOn PeakOff PeakDelivery
ItemAccountUtilityDatekWh UsagekWhkWhKW
4814b1008901000144180015100Centerpoint5/31/11561,060.75--4,383.00
5/1/11381,259.25--8,378.00
Svc Address:1900 FPT Bryan Mound Road, Angleton, TX 775153/31/11669,282.75--5,909.00
Rate Code: 9932/28/111,238,156.00--3,514.00
1/31/111,460,930.25--3,538.00
1/2/111,631,597.50--5,727.00
11/30/101,546,106.75--4,422.00
10/31/101,660,836.25--6,417.00
9/30/101,505,578.25727,095.75778,482.505,980.00
8/31/101,473,640.75704,109.75769,531.003,158.00
8/1/101,795,240.75888,784.25906,456.506,871.00
6/30/101,090,556.75555,104.50535,452.256,238.00
Total15,014,246.00

Projection Data

Bryan Mound Process Load ProfileBryan Mound Hotel Load Profile
ESI ID 1008901000144180015100ESI ID 1008901000144290012100
Service Address: 1900 FPT Bryan Md Rd Angleton, TX 77515Service Address: 1900 FPT Bryan Md Rd Angleton, TX 77515
Based on History Data (FY 2011)Based on History Data (FY 2011)
New Negotiated Contract to start April 2012New Negotiated Contract to start April 2012
DemandTotalDemandTotal
DatekWkWhsDatekWkWhs
12-MarProjection2,406773,85412-MarProjection26984,000
Apr-12Projection2,406773,854Apr-12Projection26984,000
May-12Projection2,406794,854May-12Projection269105,000
Jun-12Projection2,406801,854Jun-12Projection269112,000
Jul-12Projection2,406812,854Jul-12Projection269123,000
Aug-12Projection2,406813,854Aug-12Projection269124,000
Sep-12Projection2,406798,854Sep-12Projection269109,000
Oct-12Projection2,406788,854Oct-12Projection26999,000
Nov-12Projection2,406767,854Nov-12Projection26978,000
Dec-12Projection2,406788,854Dec-12Projection26999,000
Jan-13Projection2,406785,854Jan-13Projection26996,000
Feb-13Projection2,406776,854Feb-13Projection26987,000
Mar-13Projection2,406773,854Mar-13Projection26984,000
Apr-13Projection2,406773,854Apr-13Projection26984,000
May-13Projection2,406794,854May-13Projection269105,000
Jun-13Projection2,406801,854Jun-13Projection269112,000
Jul-13Projection2,406812,854Jul-13Projection269123,000
Aug-13Projection2,406813,854Aug-13Projection269124,000
Sep-13Projection2,406798,854Sep-13Projection269109,000
Oct-13Projection2,406788,854Oct-13Projection26999,000
Nov-13Projection2,406767,854Nov-13Projection26978,000
Dec-13Projection2,406788,854Dec-13Projection26999,000
Jan-14Projection2,406785,854Jan-14Projection26996,000
Feb-14Projection2,406776,854Feb-14Projection26987,000
Mar-14Projection2,406773,854Mar-14Projection26984,000
24 Months18,956,49624 Months2,400,000
25 Months19,730,35025 Months2,484,000

NOTE: 25 months of data projection is given to cover meter reading dates through April 2014

2 YR BM Power Proj Recap

Bryan Mound Power Projection for the period of coverage from March 2012 through March 2014
Constellation Energy Houston Ship Channel Market Price Index
Total Consumption of Power (Breakdown by Hotel and Process Operations)
New DESC Power Contract starting in March 2012
2,289,630 / 4
25 MonthHotelProcessProcessProcessProcessProcess Total
ProjectionkWhskWhskWhskWhskWhskWhsAll kWhs
5 yearFY 11 Avg (4 mos)
avg. by mo.572,408
Month / YearHotel Load kWhsOther or Max STEsOther Oil & Brine TransfersLeach @ 50MBDQuarterly Pump TestingProcess TotalGrand Total
NonekWhskWhskWhskWhsAll kWhs
Mar-1284,0000167,316488,53834,000689,854773,854
Apr-1284,0000167,316488,53834,000689,854773,854
May-12105,0000167,316488,53834,000689,854794,854
Jun-12112,0000167,316488,53834,000689,854801,854
Jul-12123,0000167,316488,53834,000689,854812,854
Aug-12124,0000167,316488,53834,000689,854813,854
Sep-12109,0000167,316488,53834,000689,854798,854
Oct-1299,0000167,316488,53834,000689,854788,854
Nov-1278,0000167,316488,53834,000689,854767,854
Dec-1299,0000167,316488,53834,000689,854788,854
Jan-1396,0000167,316488,53834,000689,854785,854
Feb-1387,0000167,316488,53834,000689,854776,854
Mar-1384,0000167,316488,53834,000689,854773,854
Apr-1384,0000167,316488,53834,000689,854773,854
May-13105,0000167,316488,53834,000689,854794,854
Jun-13112,0000167,316488,53834,000689,854801,854
Jul-13123,0000167,316488,53834,000689,854812,854
Aug-13124,0000167,316488,53834,000689,854813,854
Sep-13109,0000167,316488,53834,000689,854798,854
Oct-1399,0000167,316488,53834,000689,854788,854
Nov-1378,0000167,316488,53834,000689,854767,854
Dec-1399,0000167,316488,53834,000689,854788,854
Jan-1496,0000167,316488,53834,000689,854785,854
Feb-1487,0000167,316488,53834,000689,854776,854
Mar-1484,0000167,316488,53834,000689,854773,854
Projection Totals2,484,00004,182,90012,213,450850,00017,246,35019,730,350
Projected kWhs based on fiscal year 2011 historical actual for Other Oil and Brine Transfers
Projected kWhs based on fiscal year 2011 historical actual for Mini Leach
Oil Brine Transfers and Mini Leach not separately metered. Estimates based on a 29% vs 71% proration of historical process power usage vs barrels moved.
Projected kWhs for quarterly pump testing

Hotel Load

Bryan Mound Power Projection
Hotel Load is based on current monthly actual usage
March 2012 through March 2014
5 year average
by month
Monthly
kWhs
Mar-1284,000
Apr-1284,000
May-12105,000
Jun-12112,000
Jul-12123,000
Aug-12124,000
Sep-12109,000
Oct-1299,000
Nov-1278,000
Dec-1299,000
Jan-1396,000
Feb-1387,000
12 Month Total1,200,000
Monthly
kWhs
Mar-1384,000
Apr-1384,000
May-13105,000
Jun-13112,000
Jul-13123,000
Aug-13124,000
Sep-13109,000
Oct-1399,000
Nov-1378,000
Dec-1399,000
Jan-1496,000
Feb-1487,000
Mar-1484,000
13 Month Total1,284,000

Total 2,484,000 Hotel kilowatt hours

No STEs

BRYAN MOUND POWER PROJECTON
NO OTHER OR MAX STEs IN THE SCHEDULE OF OPERATIONS

FY 2012 TABLETOP EXERCISE

FY 2013 MOD RPX

FY 2014 TABLETOP EXERCISE

Other Oil & Brine Transfers

Bryan Mound Power Projection
Other Oil and Brine Transfers
Process Load is based on current monthly actual usage
March 2012 through March 2014
FY 11 Avg (4 mos) with mini leach and normal oil/brine transfers and no degas operations
572,408
Monthly
kWhs
Mar-12167,316
Apr-12167,316
May-12167,316
Jun-12167,316
Jul-12167,316
Aug-12167,316
Sep-12167,316
Oct-12167,316
Nov-12167,316
Dec-12167,316
Jan-13167,316
Feb-13167,316
12 Month Total2,007,792
Monthly
kWhs
Mar-13167,316
Apr-13167,316
May-13167,316
Jun-13167,316
Jul-13167,316
Aug-13167,316
Sep-13167,316
Oct-13167,316
Nov-13167,316
Dec-13167,316
Jan-14167,316
Feb-14167,316
Mar-14167,316
13 Month Total2,175,108

Total 4,182,900 Other Oil & Brine Transfer kilowatt hours

Mini Leach

Bryan Mound Power Projection
Mini Leach
March 2012 through March 2014
FY 11 Avg (4 mos) with no degas operations
572,408
Monthly
kWhs
Mar-12488,538
Apr-12488,538
May-12488,538
Jun-12488,538
Jul-12488,538
Aug-12488,538
Sep-12488,538
Oct-12488,538
Nov-12488,538
Dec-12488,538
Jan-13488,538
Feb-13488,538
12 Month Total5,862,456
Monthly
kWhs
Mar-13488,538
Apr-13488,538
May-13488,538
Jun-13488,538
Jul-13488,538
Aug-13488,538
Sep-13488,538
Oct-13488,538
Nov-13488,538
Dec-13488,538
Jan-14488,538
Feb-14488,538
Mar-14488,538
13 Month Total6,350,994

Total 12,213,450 Mini Leach kilowatt hours

Quarterly Pump Testing

Bryan Mound Power Projection
Quarterly Pump Testing
Monthly
kWhs
Mar-1234,000
Apr-1234,000
May-1234,000
Jun-1234,000
Jul-1234,000
Aug-1234,000
Sep-1234,000
Oct-1234,000
Nov-1234,000
Dec-1234,000
Jan-1334,000
Feb-1334,000
12 Month Total408,000
Monthly
kWhs
Mar-1334,000
Apr-1334,000
May-1334,000
Jun-1334,000
Jul-1334,000
Aug-1334,000
Sep-1334,000
Oct-1334,000
Nov-1334,000
Dec-1334,000
Jan-1434,000
Feb-1434,000
Mar-1434,000
13 Month Total442,000

Total 850,000 Quarterly Pump Testing kilowatt hours

original per qtr est100,845.00
3 mos per qtr3
monthly estimate33,615.00
rounded to34,000.00

Attachment A

ATTACHMENT A
25 Month Power Contract
Period of Coverage is March 2012 through March 2014
Bryan Mound Hotel Load Profile
ESI ID 1008901000144290012100
Service Address: 1900 FPT Bryan Md Rd Angleton, TX 77515
Based on History Data (FY 2011)
New Negotiated Contract to start March 2012
DemandTotal
DateKVAkWhs
Mar-12Projection26984,000
Apr-12Projection26984,000
May-12Projection269105,000
Jun-12Projection269112,000
Jul-12Projection269123,000
Aug-12Projection269124,000
Sep-12Projection269109,000
Oct-12Projection26999,000
Nov-12Projection26978,000
Dec-12Projection26999,000
Jan-13Projection26996,000
Feb-13Projection26987,000
Mar-13Projection26984,000
Apr-13Projection26984,000
May-13Projection269105,000
Jun-13Projection269112,000
Jul-13Projection269123,000
Aug-13Projection269124,000
Sep-13Projection269109,000
Oct-13Projection26999,000
Nov-13Projection26978,000
Dec-13Projection26999,000
Jan-14Projection26996,000
Feb-14Projection26987,000
Mar-14Projection26984,000
26 Months2,484,000

NOTE: 25 months of data projection is given to cover meter reading dates through March 2014

Attachment B

ATTACHMENT B
25 Month Power Contract
Period of Coverage is March 2012 through March 2014
Bryan Mound Process Load Profile
ESI ID 1008901000144180015100
Service Address: 1900 FPT Bryan Md Rd Angleton, TX 77515
Based on History Data (FY 2011)
New Negotiated Contract to start March 2012
DemandTotal
DateKVAkWhs
Mar-12Projection2,135773,854
Apr-12Projection2,135773,854
May-12Projection2,135794,854
Jun-12Projection2,135801,854
Jul-12Projection2,135812,854
Aug-12Projection2,135813,854
Sep-12Projection2,135798,854
Oct-12Projection2,135788,854
Nov-12Projection2,135767,854
Dec-12Projection2,135788,854
Jan-13Projection2,135785,854
Feb-13Projection2,135776,854
Mar-13Projection2,135773,854
Apr-13Projection2,135773,854
May-13Projection2,135794,854
Jun-13Projection2,135801,854
Jul-13Projection2,135812,854
Aug-13Projection2,135813,854
Sep-13Projection2,135798,854
Oct-13Projection2,135788,854
Nov-13Projection2,135767,854
Dec-13Projection2,135788,854
Jan-14Projection2,135785,854
Feb-14Projection2,135776,854
Mar-14Projection2,135773,854
25 Months19,730,350

NOTE: 25 months of data projection is given to cover meter reading dates through April 2014

Attachment C Drawdown Load

ATTACHMENT C
Bryan Mound Drawdown Process Load ProfileHorsepower Conversion to Demand for BM Full Drawdown
ESI ID 1008901000144180015100
Service Address: 1900 FPT Bryan Md Rd Angleton, TX 77515Phase 190% of 232 MMB = 209 MMB
Flow Rate @ 1.5 MMB = 139 Days
RWINT(Intake)31,5004,5000.833,735
Bryan Mound Load Profile for Full DrawdownRWINJ(Injection)73,50024,5000.8320,335
Site Storage is 232 MMBCOTP @ 25%(transfer)21,0002,0000.83415
90% Drawdown of 209 MMB Flow Rate is 1.5 MMB for 139 DaysTotal KVA Demand24,070
10% Drawdown of 23 MMB Flow Rate is 0.750 MMB for 31 DaysRamp Up - In approximately 2 HoursRamp Down - In approximately 2 Hours
Step 1Pumps on line ( 1 RWINT + 2 RWINJ)Step 1Pumps on line ( 3 RWINT + 7 RWINJ)
Step 3Pumps on line ( 3 RWINT + 7 RWINJ)Step 3Pumps on line ( 1 RWINT + 2 RWINJ)
Note: These figures are presented for contingent planning purposes only.
Currently no drawdown is scheduled, however the contractor must bePhase 230 Day Cavern Rebound ( No Drawdown)
prepared to supply all power with thirteen (13) days notice by the SPR
Process Operations
Motors & PumpsTotalPhase 310% of 232 MMB = 23 MMB
DemandEstimatedFlow Rate @ 0.750 MMB = 31 Days
KVAkWh
Phase 130 Days24,00014,400,000Pump Description# of PumpsHPHP@ 83%Demand
30 Days24,00014,400,000
30 Days24,00014,400,000RWINT(Intake)21,5003,0000.832,490
30 Days24,00014,400,000RWINJ(Injection)43,50014,0000.8311,620
19 Days24,0009,120,000COTP @ 25%(transfer)21,0002,0000.83415
139 Days66,720,000Total KVA Demand14,110
Phase 230 Days00
CavernRamp Up - In approximately 2 HoursRamp Down - In approximately 2 Hours
ReboundStep 1Pumps on line ( 1 RWINT + 2 RWINJ)Step 1Pumps on line ( 2 RWINT + 4 RWINJ)
Step 2Pumps on line ( 2 RWINT + 4 RWINJ)Step 2Pumps on line ( 1 RWINT + 2 RWINJ)
Phase 331 Days14,0008,400,090

TOTAL 200 Days 75,120,090

Curole 5 yr mo avg hotel 5 Years of Hotel Actual kWh plus FY 2011 through June

Profile
FY 2006FY 2007FY 2008FY 2009FY 2010FY 2011Average
Oct97891069810310399
Nov103719239748878
Dec115101801011009599
Jan70115102951039396
Feb768680721119787
Mar95828084917384
Apr88618982929384
May10910310899107102105
Jun12311810811494112112
Jul115113120130135123
Aug125125122117132124
Sep11412180106126109
1,2301,1851,1671,1371,2688561,200

File details come from the government source that posted it. Updated .