Attachment 2 Statement of Objectives (SOO)

View the file

Other files

File Type Posted
11R0338_0001.pdf PDF
11R0338_Attch 4_MIL-PRF-27201D.pdf PDF
11R0338_Attch 5_Clauses with FillIns —
11R0338_Attch 1_Schedule.pdf PDF
11R0338_Attch 3_MIL-PRF-25508G.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP SP0600-11-R-0338

Attachment 2

STATEMENT OF OBJECTIVES

16 May 2011

1. GENERAL INFORMATION

1.1. DLA Energy, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and services, requires delivery of bulk Liquid Hydrogen (LH2) and Liquid Oxygen (LOX) to Cape Canaveral Air Force Station (CCAFS) FL and Vandenberg AFB (VAFB) CA. The Contractor shall provide all product, raw materials, supplies, management, tools, equipment, labor, and transportation necessary for the delivery of LH2 and LOX. All deliveries to CCAFS and VAFB shall be f.o.b. destination.

2. PRODUCT REQUIREMENTS

2.1. LH2 provided shall conform to Performance Specification, Propellant, Hydrogen, MIL- PRF-27201D, dated 07 February 2007, Type II with exceptions as noted in para 2.3 The filter outlined in paragraph 3.3 of the performance specification is required.

2.2. LOX provided shall conform to Performance Specification, Propellant, Oxygen, MIL- PRF-25508G, dated 21 November 2006, Type II, Grade A with exceptions as noted in para 2.3.

The filter outlined in paragraph 3.3 of the performance specification is required.

2.3. Contractor shall provide at time of delivery, a Certificate of Analysis (CoA) specifying the product, sample location (tanker, bulk storage, or other) for which analysis was performed, sample date and date container/tanker was filled. This certificate shall provide evidence that delivered product meets all requirements of the specification. This certificate must be reviewed and approved by a customer’s representative prior to container/tanker connection to customer’s facility. If individual tanker product contents delivered are from the same facility bulk storage volume, then a single CoA would be valid for all tankers containing the same certified propellant after initial tankers are certified. A bulk storage sample for a planned quantity of tankers extending over several days would be acceptable if bulk is not replenished. A fresh bulk storage sample would be required if a significant change has been made to the plant storage tank or 30 days has elapsed since the last delivery.

2.3.1. In addition to the reports required elsewhere within this contract, one copy of each CoA applicable to this procurement shall be sent to DLA Energy QA/QT within three days after the analysis of that sample. The analysis report shall be emailed to tech.prop@dla.mil, or faxed to the attention of DLA Energy QA/QT at (210) 925-8048.

2.4. Inspection for quality shall be at origin. Quantity determination and acceptance shall be at destination using truck mounted calibrated flow meter or by calibrated weight scale certificate.

Unit of issue for LH2 shall be LB (pound) and for LOX shall be TN (ton) for all documentation.

Conversions: Quantity determinations by weight shall use a conversion of one gallon of LH2 equals 0.591 pounds and conversion of 210 gallons of LOX equals 1 Ton.

mailto:tech.prop@dla.mil�

3. PRODUCT ORDERING

3.1. Blanket Delivery Orders (DD Form 1155) will be issued by the DLA Energy Contracting Officer (CO). The Government assigned Ordering Officer(s) will place commodity delivery orders with the Contractor within 10 days prior to base quantity need dates.

3.2. DLA Energy Inventory Manager is authorized to issue a DD Form 2908, Propellant Delivery/Services Task Schedule (PDST), which will confirm and designate the specifics of the individual deliveries to be accomplished under the Blanket Delivery Order. The PDSTs issued by the DLA Energy Inventory Manager are considered extensions of the Blanket Delivery Order issued by the DLA Energy CO. The PDST issued by the DLA Energy Inventory Manager will normally be in writing, dated and serially numbered. Telephone or email orders issued for emergency deliveries will be confirmed in writing within one business day.

3.3. Changes or modifications to the commodity delivery date and time or the volume of commodity delivered may be made by the Ordering Officer no later than 6 hours in advance for launch and wet dress rehearsal (WDR) scrub replenishments, due to usage variability.

3.4. Contractor shall provide DLA Energy a list of personnel available on a 24-hour a day basis to take orders from the Ordering Officer, as well as delivery information/status on the order. The list shall include full name, office phone number, cell phone number, fax number and email. DLA Energy shall be notified of changes in contact personnel, phone numbers and email addresses.

4. PRODUCT DELIVERY

4.1. Products shall be supplied in Contractor provided tankers and will be in support of Delta IV launch vehicles which utilize LOX/LH2 as the propellant for the engine systems. Delta IV launch facilities are Launch Complex 37 (CX-37) at CCAFS and Space Launch Complex 6, (SLC-6) at VAFB. The LH2 storage tank gross volume at SLC-6 is 850,000 gallons. The LOX storage tank gross volume at CX-37 is 250,000 gallons. SLC-6 has a 300,000 gallon main storage tank plus a 90,000 gallon auxiliary storage tank on site. All tanker offload areas for CX- 37 and SLC-6 feature 5 offload bays utilizing local control for offload valves, vent line purges, and flare stack (for the LH2 storage areas). The LH2 areas also feature flame detection and fire suppression.

4.2 It is the intent of the Government designated Ordering Officer to accept all quantities ordered into available storage tanks and to off-load as efficiently as possible by scheduling up to 5 tankers for off load at a time. However on very rare occasions, due to launch/WDR scheduling, at no fault to the Contractor, the customer tanker truck may be held on stand-by pending off load for up to 4 hours and/or the Contractor may be required to return full tankers to their facilities.

4.3 Upon notification by the Government assigned Ordering Officer(s), the Contractor shall be required to fill, schedule product inspection, complete all support documentation, and deliver products within a specific timeframe as requested by the Ordering Officer to meet Customers unique schedule and usage demands on a 24 hour/365 day basis. It is essential that tankers arrive on site at the pre-scheduled time since tankers are generally offloaded in groups of tankers. The number of tankers identified for each customer site below will be required to support 6 launch attempts in 9 days. The final acceptance of product shall occur at point of off load into the customer’s storage tank.

4.4 For CCAF CX-37, Contractor shall have the following capabilities for LOX deliveries to support a medium and heavy vehicle launch, WDR scrub, or turnaround efforts, (as required to support 24hr turnaround operations in the event of a launch or WDR scrub). Contractor shall provide 20 each LOX tankers with a minimum delivery capacity of 428 TN every 24hrs (2 sets of 10 tanker deliveries per day).

4.4.1 For VAFB SLC-6, Contractor shall have the following capabilities for LOX and LH2 deliveries to support a medium vehicle launch, WDR scrub, or turnaround efforts, (as required to support 24hr turnaround operations in the event of a launch or WDR scrub).

4.4.2 Contractor shall provide 5 each LH2 tankers with a minimum total capacity of 38, 415 LBS every 24hrs (1 set of 5 tanker deliveries per day).

4.4.3 Contractor shall provide 10 each LOX tankers with a minimum delivery capacity of 214 TN delivered in a 4 hour window each day for 8 consecutive days. ( Deliveries must be delivered in groups of 5 tankers or less).

4.4.4. Contractor shall provide, at time of delivery, a certified weight ticket identifying the product quantity in each tanker.

4.5 Delivery communications: Contractor shall provide a Point of Contact (POC) and one back up person to be available 24 hours/365 days for each delivery location. Each customer launch site will have a designated communication person to communicate directly with the Contractor POC any WDR/Launch schedule changes, cancellation, and any other changes that will affect the delivery of the product from the Contractor. The customer launch site communication person will be responsible for notifying the Contractor of any changes for non- WDR/Launch attempt operations prior to tanker departure from Contractor facility. For WDR/Launch attempt operations, the customer launch sites communications person will be responsible for notifying the Contractor within 12 hours of any WDR/Launch schedule changes.

Contractor shall confirm notification of WDR/Launch schedule changes within 2 hours.

5. TOOLS AND EQUIPMENT

5.1. Contractor will provide those tools and equipment including adapters required to connect cryogenic transfer lines from the Contractor’s vessel to the customer’s offload station.

5.2. Contractor shall have the capability to meet the following

LH2 Offload Tanker GSE Requirements (current attach points) LH2 Fill – VAFB

5 each LH2 fill line fitting – Linde C-01857 2” Male Linde HQK Bayonet at end of Facility VJ flex hose

LH2 Vent Line – VAFB

5 each LH2 vent line fitting – Linde C-01857 2” Male Linde HQK Bayonet at end of Facility non-VJ flex hose

LOX Offload Tanker GSE Requirements (current attach points) 5 each ACME Cryogenics, 3” Female Nut, P/N 540-005-30 with 4.25-4 ACME threads at the end of the facility flex hose which shall connect to the Tanker Liquid Fill/Withdrawal Connection.

5.3. Contractor shall provide tankers with a maximum allowable working pressure (MAWP) of 150 psig and a minimum operating pressure of 40 psig for both LH2 and LOX. All tanker and hose connections shall be clean and maintained to meet industry safety standards.

5.4. Contractor shall provide tankers which meet industry safety and operational requirements. If customer determines that a tanker is not able to meet industry safety or operational requirements, the tanker will be rejected at no cost to the Government.

5.5. Tanker operators shall be prepared for and execute clean-up of spilled oil, coolant, or other leaks or contamination.

5.6. Contractor shall provide personal protective equipment to its employees. This equipment will include, but is not limited to: Full face shields, anti-static coveralls, hard hats, closed toe nonporous foot protection, hearing protection, proper clothing meeting or exceeding safety standards as required in performing cryogenic propellant transfer operations safely.

5.7. Contractor shall provide proper training in the use of personal protective equipment, to all its employees that are requiring its use. At no time, without expressed permission from the customer, shall any Contractor personnel operate any customer equipment.

5.8. Contractor equipment identified as needing repair shall be repaired before returning for subsequent deliveries to customer’s facility. If customer has assessed that trailer is not able to meet safety or operational requirements, the trailer will be rejected at no cost to the customer or to the Government.

5.9. If conditions warrant due to customer’s mission requirements, Contractor may be required to remove and/or secure devices such as cell phones, radios, Global Positioning Systems and other transmitting devices prior to entering launch complex gates. Failure to do so may result in a delivery rejection.

6. TRAINING/SECURITY

6.1. All Contractor personnel required to work on customer controlled sites are required to submit to a safety training orientation. Customer Safety personnel will administer the orientation at a time deemed appropriate by customer, within 48 hours of a Contractor’s personnel arrival on site. Customer will not be charged the time spent in safety training Contractor personnel. This training will exceed no more than 2 hours of given personnel's time. Prior to receiving this training, no Contractor personnel will be allowed on site unescorted.

6.2. Contractor shall provide only properly licensed drivers and certified product operators.

6.3. Contractor and all subcontractors shall comply and be in accordance with all security and badge requirements required on USAF Installations and United Launch Alliance (ULA) CCAFS or VAFB Facilities, see attachment titled “DOC 359, Security Requirements at Cape Canaveral, Florida and Vandenberg, California”. All required badges shall be worn and be visible at all times while onsite.