PRODUCT PRESSURE AND FLOW RATE/TANK DESCRIPTION

ATTACHMENT 1

PRODUCT STORAGE

CAPACITY

# OF

STORAGE

TANKS

ROUTINE DELIVERY

– MINIMUM psig

AT TIME OF OFF-

LOAD

MAWP MINIMUM

PRESSURE TO

SIGNAL

REPLENISHMENT

DESCRIPTION OF STORAGE

TANK

HOSES/CONNECTOR

INFORMATION

Liquid Oxygen, LOX

900 gallons (approx.

4.29 tons)

2 Filled to operating capacity when filled

500 psig 50 “inches of water”

a. Designed as a cryogenic tanks.

b. The tanks are no higher than 11.5 feet above grade.

c. Tanks are compliant with ASME UPV Code Section VIII, Division 1.

d. The tanks are supplying 1,400 SCFH of oxygen on a 5 day a week/ 16 hour basis.

e. Located in Bldg 3001

a. Contractor shall provide off-load hoses with a minimum length of 25 feet.

b. The fill connections available to the Contractor are standard industrial CGA bulk fittings.

c. Contractor shall ensure proper interface between tanks and offloading unit.

FXS0199

Typewritten Text

FXS0199

Typewritten Text

FXS0199

Typewritten Text

FXS0199

Typewritten Text

# OF

STORAGE

TANKS

ROUTINE DELIVERY

– MINIMUM psig

AT TIME OF OFF-

LOAD

MAWP MINIMUM

PRESSURE TO

SIGNAL

REPLENISHMENT

DESCRIPTION OF STORAGE

TANK

HOSES/CONNECTOR

INFORMATION

Gaseous Hydrogen, GH2

120,000 scf 1 2,000 psig 4,000 psig

Start with 1000 psi and adjust if needed from historical data.

Delivery time will also impact the pressure fill setting.

a. Designed as a series of high pressure tanks.

b. Approximately 20 feet in length, mounted horizontally and no greater than 11 feet high.

c. Tanks are compliant with ASME UPV Code Section VIII, Division 1, and Appendix 22

d. Compatible with operation at minus 20 degrees F to 200 degrees F.

e. Tanks are connected to two separate regulated supplies to the building, one of the supplies is regulated to 250 psig and the other is regulated to 150 psig.

with a minimum length of 25 feet.

b. The fill connections available to the Contractor are standard industrial CGA bulk fittings.

c. Contractor shall ensure proper interface between tanks and offloading unit.

# OF

STORAGE

TANKS

ROUTINE DELIVERY

– MINIMUM psig

AT TIME OF OFF-

LOAD

MAWP MINIMUM

PRESSURE TO

SIGNAL

REPLENISHMENT

DESCRIPTION OF STORAGE

TANK

HOSES/CONNECTOR

INFORMATION

Liquid Nitrogen, LN2

900 gallons (approx.

3.04 tons)

Filled to operating capacity when filled

250 psig 30 “inches of water”

a. Designed as a cryogenic tanks.

b. The tanks are no higher than 11.5 feet above grade.

c. Tanks are compliant with ASME Code Section VIII, Division 1.

d. The tank is supplying 556 SCFH of nitrogen on a 5 day a week/ 16 hour basis.

with a minimum length of 25 feet.

b. The fill connections available to the Contractor are standard industrial CGA bulk fittings.

c. Contractor shall ensure proper interface between tanks and offloading unit.

**MAWP (Maximum Allowable Working Pressure)

Other files

File Type Posted
Transport Equip Delay Cert H-14 —
CGA G-10.1_7 Nitrogen —
Past Performance Data Sheet —
CGA G-5.3 2004 Hydrogen —
LOX MIL-PRF-25508G —
TAFB Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .