HRJ Slides.ppt
PPT presentation 4 MB Posted
- Attached to
- RECOVERY--HYDROTREATED RENEWABLE HRJ5 (NAVY) AND HYDROTREATED RENEWABLE HRJ8 (AIR FORCE)
- Solicitation number
- SP0600-09-R-0704
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydrotreated Renewable Jet Fuel Pre-Proposal Conference Defense Energy Support Center
Unclassified
Mission:
Vision:
Values:
To Provide the Department of Defense and Other Government Agencies with Comprehensive Energy Solutions in the Most Efficient and Economical Manner Possible!
Our Customers First Choice for Energy Solutions
| People |
| Service |
| Excellence |
| Innovation |
| Trust |
Enterprise Petroleum Sales
| FY05 Net Sales 132.5M barrels - $ 8.5B |
| FY06 Net Sales 133.9M barrels - $12.7B |
| FY07 Net Sales 132.4M barrels - $12.6B |
| FY08 Net Sales 132.5M barrels - $17.5B |
| FY09 Projection 130.0M barrels - $15.0B |
Foreign Military Sales FY08 Net Sales 4M barrels - $512.1M
Expanding Energy Solutions
| $489.6M Natural Gas Business |
| $477.5M Electricity Business |
| $73.7M Coal Business |
| $2.9M Renewables |
| $706M Estimated Utility Privatization Awards |
(multi year awards) Military Fuel FY08
| Inventory 59.5M barrels |
| Storage locations 632 |
| Transactions 23.6M |
| Barrels sold 132.5M |
| Fuel Cards $230M |
| Aerospace Energy Sales $54M |
Forward Presence FY08
| HQC – Co-located w/ 3 Service Control Points |
| Approx 750 personnel |
| 4 Geographic Regions |
| Approx 225 personnel |
Personnel On Board FY08
| Civilians 921 |
| Military 61 |
Alternative Fuels
| Hydrotreated Renewable JP5 / JP8 |
| Air Force and Navy Testing / Certification Program |
| American Recovery and Reinvestment Act of 2009 |
Why Do This?
Driven by energy security concerns Utilization of domestic resources Environmental considerations Who Could Do This?
Existing Suppliers Partnerships
Agenda
| Program, Quality and Specification Requirements |
| How To Do Business with DESC |
| Procurement Process |
| Improper Business Practices and Personal Conflicts of Interest |
| Individual Sessions |
Program, Quality and Specification Requirements Pamela Serino Director – Quality / Tech Support Office
Alternative Energy Drivers Energy Independence
Energy Independence and Security Act of 2007 Compliance with environmental regulations
Energy Policy Act of 2005
| Reduce carbon footprint |
| Minimize green house gas emissions |
| Get ahead of customer requirements |
Requirements
| Fuel | Requirement |
| HRJ-8 | 400,000 gallons (200,000 gallons each for two different feedstocks) |
| HRJ-5 | 190,000 gallons |
| HRJ-5 | 1,500 gallons using algal oil |
Fuel and Feedstocks (HRJ-5) Hydrotreated Renewable JP-5 fuel supplied shall consist predominately of n-paraffins, iso-paraffins and cycloparaffins and shall be produced solely from triglycerides and free fatty acids derived from either plant or algal oils.
Fuel and Feedstocks (HRJ-8) Hydro-treated renewable JP-8 supplied shall consist predominantly of n-paraffins, iso-paraffins, and cycloparaffins and shall be produced solely from triglycerides and free fatty acids derived from either plant or algal oils or animal fat or mixtures thereof.
Explanation of Feedstock Requirements For a plant oil product, the oil will be considered to be different from another product if it contains more than 25% of an oil or oils not contained in the other product.
| Options by percent of oil | |||||||
| A | B | C | D | E | F | G | |
| Soy | 100 | 90 | 75 | 75 | 50 | 33 | 20 |
| algal | 25 | 33 | 20 | ||||
| Camelina | 10 | 25 | 50 | 33 | 20 | ||
| Jatropha | 20 | ||||||
| sunflower | 20 | ||||||
| A and B would be considered the same. | |||||||
| C& D would be considered different | |||||||
| Would C&E be different? | |||||||
| F would be okay | |||||||
| Would G be okay even if there is not 25% of any product? Or is this just so unlikely we should not worry about it. |
Specifications HRJ-5 and HRJ-8 Critical Specification Properties
Density freezing point Net heat of combustion Jet Fuel Thermal Oxidation Tester Metals Nitrogen Hydrocarbon composition Flash Point
Additive Requirements HRJ-5 and HRJ-8
HRJ-5
1,500 gallon requirement Algal oil only Antioxidant
HRJ-5
Initial 1,500 gallons contains only antioxidant Remainder 188,500 gallons contains antioxidant and corrosion inhibitor
HRJ-8
Antioxidant (for all deliveries) Static Dissipater Additive (Stadis® 450) (for all deliveries)
Quality Assurance Provisions Quality Control Plan
Receiving Blending Sampling Testing Calibration Storage and handling Loading and shipping Corrective action
Commercial Industry Commercial Aviation Alternative Fuels Initiative (CAAFI)
Cooperative effort between DESC, Services and Commercial Industry Commercial specification through ASTM
Current Issues Timeline
Environmental Considerations Energy Independence and Security Act
Section 526 No Federal agency shall enter into a contract for procurement of an alternative or synthetic fuel, including a fuel produced from nonconventional petroleum sources, for any mobility-related use, other than for research or testing, unless the contract specifies that the lifecycle greenhouse gas emissions associated with the production and combustion of the fuel supplied under the contract must, on an ongoing basis, be less than or equal to such emissions from the equivalent conventional fuel produced from conventional petroleum sources.
Environmental Considerations Interagency Working Group for Alternative Fuels Lifecycle Analysis
Military Services, Environmental Protection Agency, Department of Energy, Federal Aviation Administration, and DESC-Q Ensuring rules and tools for evaluating alternative fuels, greenhouse gas footprint Development of a model / metrics to fairly evaluate greenhouse gas emissions of conventional and unconventional fuels Metrics (Section 526 Compliance) EPA / DoE Responsible for Conventional Jet Petroleum Baseline
How To Do Business With The Defense Energy Support Center Virginia R. Broadnax Small Business Specialist Office of Small Business Programs
Federal Acquisition Regulation (FAR) Requirement - Policy Current FAR Policy (FAR Part 19.201 (a)) States:
“It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to small business, Veteran-owned Small Business, Service Disabled Veteran-owned Small Business, HUBZone small business, small disadvantaged business, and woman-owned small business concerns. Such concerns shall also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance.”
Definitions
| Small Business – A concern, including affiliates, that is owned and operated, not dominant in the field of operation in which it is bidding on government contracts, and qualified as a small business under the criteria and size standards in 13 CFR Part 121. |
| Size Standards – The maximum size that a firm may be to participate in Federal Government programs reserved for small businesses. The North American Industry Classification System (NAICS) is used to identify the industries. |
NAICS
Bulk Refined Product 324110 (mfr) 424720 (dealer)
324110 – No more than 1,500 employees nor more than 125,000 barrels per calendar day
424720 – 500 employees or less
DoD Subcontracting Program Subcontracting Plan Requirements
Clause at FAR 52.219-9 (applies to OTSB)
Acquisition greater than $550K ($1M for construction)
With Subcontracting Possibilities Submit Acceptable Plan or Ineligible for Award
Multi-Year Contracts / Contract With Options
Cumulative Value of Basic Contract + All Options considered in determining if a plan is necessary If Individual Plan : Separate Goals for Basic + Each Option
Contractor Responsibility Requirements Federal Acquisition Regulation (FAR) 9.104-1 – General Standards States
“To be determined responsible, a prospective contractor must --
(a) Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104-3(a));
(b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
(c) Have a satisfactory performance record (see 9.104-3(b) and Subpart 42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2;
Contractor Responsibility Requirements
(d) Have a satisfactory record of integrity and business ethics;
(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). (See 9.104-3 (a).)
(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and
(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.”
Questions?
CONTACT INFORMATION
Director, Lula Manley (703) 767-9465
Pre-Award Team Garrell Armstrong (703) 767-8530 Virginia Broadnax (703) 767-9400 Sheila McClain 767-9678
Subcontracting Team Jackie Craft (703) 767-9681 Robert Mitchell (703) 767-8555 Noel Echevarria (703) 767-9704
Procurement Process Phyllis Orange Chief – Domestic Bulk Fuels Contracting Bulk Petroleum
Agenda
| Contracting Overview |
| Procurement Process |
| Solicitation Process |
Contracting Overview Procure MILSPEC products in very large volumes
Award annual indefinite quantity contracts Estimated Quantity with a 75% minimum lift guarantee Firm fixed price Evaluate modes of transportation
Transport truck Intermodal container
Procurement Process – Contract Approach
| Competitive procurement process |
| Negotiated procurement |
| Anticipate 1-year contract term with option quantities |
| Award to offer that represents lowest price technically acceptable |
| Firm fixed price award |
| FOB Origin |
| Guaranteed minimum (typically 75%) |
HRJ-8 (Air Force)
400,000 USG (total requirement) 200,000 USG (initial award) Additional 200,000 USG in option quantities Award to single or multiple sources with different feedstocks Animal fat, plant and / or algal oils feedstocks
HRJ-5 (Navy)
190,000 USG
40,000 (initial award) Additional 150,000 USG in option quantities Single source award Plant or algal oils feedstocks Feedstock used to produce all HRJ fuel shall come from the same source American Recovery and Reinvestment Act of 2009 funds HRJ-5 (Navy)
1,500 USG
Algal oils feedstock only Feedstock used to produce the HRJ fuel shall come from same source American Recovery and Reinvestment Act of 2009 funds
Key Points in the Procurement Process
Requirement Definition Post Award Evaluation/ Award
Negotiations
Solicitation Award Contract(s) Open Negotiations Issue RFP
Final Offers
Month Purchase Request Discuss/Resolve Offer Discrepancies / Process Exceptions Delivery Period
Notional Timeline
| Issue Solicitation | June 4, 2009; Amended June 15, 2009 |
| Close Solicitation | July 13, 2009 |
| Initial Evaluation | July 14, 2009 – July 27, 2009 |
| Negotiation Period | July 27, 2009 – August 17, 2009 |
| Final Evaluations Complete | August 24, 2009 |
| Contract Award | August 31, 2009 |
| First Delivery (Navy, HRJ-5) | September 15, 2009 |
| First Delivery (AF, HRJ-8) | 120 days after contract award |
Solicitation Process
| Solicitation requirements synopsized to FedBizOpps |
| Solicitation issued |
DESC web page FedBizOpps Time and date for receipt of offers is 3:00 p.m. (local time) on July 13, 2009
Late is Late
Time and date for receipt of offers stated on SF 1449 Initial offers Final proposal revisions Specific to local time Offers received after time and date specified will not be accepted Exceptions Mishandling by the government Late modifications of an otherwise acceptable proposal
Solicitation Format:
Standard Form 1449 Table of Contents Section B – Supplies to be Furnished / Customers / EPA Clause Section C – Description / Specification / Statement of Work Section E – Inspection & Acceptance Section F – Deliveries or Performance Section G – Contract Administration Data Section I – Contract Clauses Section J – List of Attachments Section K – Representations, Certifications, & other Statements Section L – Instructions, Conditions, & Notices to Offerors Section M – Evaluation Factors for Award
Standard Form 1449
Point of Contact with contact information Proposal due date Important Notices to Offerors
Central Contractor Registration (CCR) required Prospective awardee shall be registered in the CCR database Registration required prior to award, during performance, and throughout final payment of the contract
| Table of Contents |
| B1 – Supplies to be Furnished |
Indefinite Delivery Indefinite Quantity (IDIQ) Minimum guarantee Orders issued by ordering officer Firm fixed price FOB origin Schedule B – Supplies / Services and Prices / Costs
Contract line item description and quantities National stock number Period of performance
Section C – Description / Specification / Statement of Work
Statement of Objectives / Work and / or Specification Product specification requirements Unique delivery requirements Customer specific information
Inspection and Acceptance
Contractor inspection responsibilities for Hydro-treated Renewable JP5 (HR-J5) and JP8 (HR-J8) E5 Inspection of supplies – fixed-price (Aug 1996) E35 Nonconforming supplies and services (DESC Jan 2004)
Section F – Deliveries or Performance
Transportation F1.09 Determination of Quantity Free Time and Detention Section G – Contract Administration Data
Submission of Invoices for Payment Section I – Contract Clauses
Contract Terms and Conditions Federal Statutory Clauses DoD Statutory Clauses
| Section J – List of Attachments |
| Section K – Representations, Certifications and other Statements |
Amendment 0001, Paragraph G
Offerors are required to provide a general description of how it will ensure reliable supply of on-spec product to meet the Government’s requirements by addressing all items stated in paragraph G
Section M – Evaluation of Offers
Lowest Price Technically Acceptable Technically Acceptable Specification (i.e., feedstocks, plant locations, etc.)
Ability to meet the delivery schedule Ability to maintain the same feedstock over the life of the contract Then Price Transportation
Section M – Responsibility
Evaluate Technical Capability Conduct Pre-award survey Ability to produce required quantity Ability to meet delivery schedule Proposed feedstock
Payment Terms
| Price is “per gallon” |
| Defense Finance and Accounting Service (DFAS) pays on behalf of DESC |
| Invoicing instructions (see Clause G150.05) |
| Prompt Payment Act |
30 days Net 10 discounted to T-bill rate
Funding Navy
American Recovery and Reinvestment Act of 2009 (Recovery Act) funds (See clauses I1.03-2, I1.04, and I1.04-1) Contractor required to report all work funded using recovery funds Recovery funds shall be tracked at http://www.FederalReporting.gov Reports required no later than 10th day after the end of each calendar quarter (IAW FAR Clause 52.204.11) Air Force – Not Applicable
Finding Information FedBizOpps (www.fedbizopps.gov)
- All solicitations greater than $25,000
- Automatically notifies vendors of new solicitations
DESC Homepage (www.desc.dla.mil)
- Reference current and past award reports
| - Access to current and historical contract pricing information |
| - Quality Operations Policies, Procedures and Guidance |
| - Product Technology Reports and Standards |
| ASSIST Homepage (www.assist.daps.dla.mil) |
DESC Web Page www.desc.dla.mil
DESC Solicitation Programs
Improper Business Practices and Personal Conflicts of Interest Kay Bushman Assistant Counsel Office of Counsel
Contractor / Government Restrictions
| Bribes |
| Gratuities, gifts, meals, travel, tickets, etc. |
Contractor Prohibitions
| Antitrust, bid rigging, to include Bid Suppression, Complementary Bidding, Bid Rotation, market suppression |
| Buying in- Bid too low with expectation that the contract amount will increase during performance or will be made up with subsequent awards. |
Government Employee Restrictions
| Revolving door – Can’t work for contractor on the same matter. |
| Protect bid information you provide to the government |
Violations Violations can result in loss of the contract and criminal prosecutions
File details come from the government source that posted it. Updated .