Amend 0001.pdf
PDF 42 KB Posted
- Solicitation number
- SP0600-08-R-0217
- Issued by
-
Defense Logistics Agency Energy
About this file
Clause Updates
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0011.pdf | ||
| COG 6 WRAP-UP 08-R-0217 AMENDMENT 0010.pdf | ||
| OFFEROR_SUBMISSION_PACKAGE | — | |
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| OFFEROR_SUBMISSION_PACKAGE_10222008.pdf | ||
| COG 6 Solicitation 08R0217 FINAL VERSION 102208.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 / 5
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
12 November 2008
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP0600 7. ADMINISTERED BY (If other than Item 6) CODE
DEFENSE ENERGY SUPPORT CENTER
8725 JOHN J. KINGMAN RD., SUITE 4950
FT. BELVOIR, VA 22060-6222
GERALD TINNER/DESC-PLB
PHONE: 703-767-9504 FAX - 703-767-8506
E-MAIL: GERALD.TINNER@DLA.MIL
PP 3.26
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code) ( ) 9A. AMENDMENT OF SOLICITATION NO.
X
SP0600-08-R-0217
9B. DATED (SEE ITEM 11)
23 October 2008
10A. MODIFICATION OF CONTRACT/ORDER NO.
BIDDER CODE: CAGE CODE: 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [ X ] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment ;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE
RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office appropriation date, etc.) SET FORTH
IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE CONTINUATION PAGES
Except as provided herein, all terms and conditions of the document referenced in Items 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C.DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C.DATE SIGNED
NSN: 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
AMENDMENT 0001
A. Offerors must acknowledge receipt of this amendment by filing out block 8 above, and signing and dating blocks 15A, 15B, and 15C below, and returning this document to DESC-PLB by 3:00 PM Eastern Time (ET) on 24 November 2008, fax (703) 767-8506 or via email at DESCPLBOFFERS@dla.mil.
B. “Paragraph W” of the special instructions on page vi of the solicitation is revised as follows:
SUBCONTRACTING PLAN REQUIREMENT: In accordance with Clause I171.01-2, large businesses that receive a contract award of more than $550,000.00 must submit an approved subcontracting plan. For additional information regarding submitting and/or administering the Subcontracting Plan, please contact Lula Manley at (703) 767-9465 or via email at lula.m.manley@dla.mil
C. The following CLIN’s are 8(a) set-aside items and are hereby deleted from the reference escalator chart on pages 234-248 of the solicitation.
CLIN’s
CLIN’s CLIN’s
CLIN’s CLIN’s
035-24A 430-XSA 885-USA 949-USA G11-USA
035-UWA 431-XSA 895-24A 960-24A H10-24A
190-24A 631-08A 895-USA 970-24A H10-DSA
255-USA 631-XSA 899-24A C40-46A H10-USA
265-USA 768-UWA 906-24A D30-24A H11-24A
273-DSA 810-24A 906-USA D30-DSA K01-46A
273-USA 815-24A 946-24A D30-USA K50-46A
335-24A 815-UWA 946-XWA E53-24A K51-DSA
340-24A 875-24A 947-24A G10-46A K90-46A
430-24A 885-24A 949-24A G11-46A M66-24A
D. Clause L7 SOCIOECONOMIC PROPOSAL (DES DEC 2001) on page OSP 27 of the Offeror Submission Package is hereby deleted in its entirety from this solicitation. Therefore, Attachment F on pages 34-36 of the Offeror Submission Package are deleted and are NOT required to be returned with your completed Offeror Submission Package.
E. The following Clause F1.09-2 DETERMINATION OF INVOICE QUANTITY (PC&S) (DESC FEB 2008) is hereby deleted in its entirety from this solicitation and Clause F1.09-2 DETERMINATION OF INVOICE QUANTITY (PC&S) (DESC OCT 2008) is hereby added and provided in full text below:
F1.09-2 DETERMINATION OF INVOICE QUANTITY (PC&S) (DESC OCT 2008)
(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined as follows:
(1) F.O.B. DESTINATION.
(i) DELIVERIES BY TANK OR BARGE.
(A) On items requiring delivery on an f.o.b. destination basis by tanker or barge, the quantity shall be determined on the basis of--
(1) Calibrated meters on the receiving tank system; or
(2) Receiving tank measurements.
(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(ii) DELIVERIES BY RAIL TANK CAR.
(A) On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government’s option) on the basis of--
(1) Calibrated meter on the receiving tank system;
(2) Weigh, using calibrated scales at the receiving location; or
(3) Receiving tank measurements.
F1.09-2 cont’d
(B) All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.
(A) If the narrative requires a tank wagon (which is always equipped with a meter), that meter shall be used to determine quantity at time of delivery. The quantity shall be read directly from the meter. On items requiring delivery on a f.o.b. destination basis by tank truck or truck and trailer, the quantity shall be determined in the Schedule. If not identified in the Schedule, quantity shall be determined in the following order of preference:
(1) Calibrated meter on the receiving tank system (as identified in the Schedule).
(2) Calibrated meter on the conveyance (as identified in the Schedule)
(3) Weight using calibrated scales at the receiving location (as identified in the Schedule).
(4) Loading rack meter ticket. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter. The loading rack ticket shall be mechanically printed annotated with the gross and net gallons (or gross and net liters), the observed and corrected API gravity (or density), and the temperature at which the product was measured.
(5) Receipt tank measurements (as identified in the Schedule).
(B) All quantities, other than delivery by tank wagon, shall be converted, either mechanically or manually, to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(C) If a loading rack meter ticket is used to determine quantity for a biodiesel blend, the quantity shall be converted to net (volume corrected) gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). The Contractor shall prepare separate loading rack meter tickets for the diesel portion and for the biodiesel blend stock B100 (the industry designation for pure biodiesel), hereinafter referred to as the B100 portion of the load. The B100 loading rack meter shall be recorded at gross (ambient) temperature when the loading meter is not capable of providing a net (volume corrected) quantity. The total shall be the sum of the net diesel and gross B100. When the B100 loading rack meters are capable of providing a net (volume corrected) quantity, the total receipt quantity shall be the sum of the net diesel and the net B100.
(2) F.O.B. ORIGIN. All quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).
(i) DELIVERIES INTO TANKER OR BARGE. On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of--
(A) Calibrated meter; or
(B) Shipping/shore tank measurement.
(ii) DELIVERIES INTO RAIL TANK CAR. On items requiring delivery at the Contractor’s refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor’s option) on the basis of--
(A) Certified loading rack meter;
(B) Weight, using calibrated scales; or
(C) Certified capacity tables for the rail tank car.
(iii) DELIVERIES BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.
(A) On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of--
(1) Calibrated loading rack meter;
(2) Weight, using calibrated scales; or
(3) Certified capacity tables of the conveyance loaded.
(B) WATER BOTTOMS.
(1) Every delivery must be free of all water bottoms prior to discharge; and
(2) The Contractor is responsible for their removal and disposal.
(b) MEASUREMENT RESTRICTIONS. All methods of measurements described in this clause are subject to government safety and environmental restrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.
(c) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the United States, other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor to the aforementioned measurement and calibration standards. In addition, the following specific standards will be used as applicable:
(1) API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and ISO 91-1). Either the 2004 or 1980 version of the standard may be used. Either the printed tables (an adjunct to the 1980 version) or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine and the 2004 version of the standard will be the referee method.
F1.09-2 cont’d
(i) For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.
(ii) For lubricating oils, use Volume XIII, Tables 5D and 6D; Volume XIV, Tables 53D and 54D; or Tables 23D and 24D (2004 version).
(iii) For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VII, Tables 53B and 54B; or Volume V, Tables 23B and 24B.
(iv) For chemicals/additives, use Volume III, Table 6C (or Volume IX, Table 54C) or volume correct in accordance with the product specification.
(v) Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels at 60 degrees Fahrenheit.
Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.
(vi) As an option to (c)(1)(v), liters may be converted to gallons using Table F1.09A (see below). If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.
(vii) If the original measurement is by weight and quantity is required by U.S. gallons, then--
(A) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.
(B) Volume XII of the adjunct to ASTM D 1250, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit.
(2) API MPMS Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which, as a minimum, contains--
(i) Number/name of each meter;
(ii) Calibration frequency;
(iii) Date of the last calibration;
(iv) Due date for next calibration;
(v) Name and signature of the person performing the calibration;
(vi) Traceability to master meter/prover used for calibration; and
(vii) Calibration report number.
Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter recordings and logs/certificates shall be kept on file and made available upon request. All calibration records (including logs or certificates) shall be retained on file for a period of three years.
(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of tank shell correction factor is not required unless its use is a customary practice for custody transfer.
TABLE F1.09-2A
CONVERSION FACTOR TABLE
Density @ 15oC Gallons @ 60oF to Liters @ 15oC, Multiply by
Liters @ 15oC to Gallons @ 60oF, Multiply by
0.723 – 0.768 3.78286 0.264350
0.769 – 0.779 3.78309 0.264334
0.780 – 0.798 3.78334 0.264317
0.799 – 0.859 3.78356 0.264301
0.860 – 0.964 3.78381 0.264284
0.965 – 1.074 3.78405 0.264267
(d) RIGHT TO REPRESENTATIVE. For f.o.b. origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For f.o.b. destination deliveries, the Contractor has the right to have a representative present to witness the delivery and measurement of quantity.
F1.09-2 cont’d
(e) DISPUTES. For f.o.b. destination deliveries utilizing volume corrected loading rack meter tickets to determine quantity:
If, at destination, the Government’s measurement using an approved method (as identified in section (a)(1)(iii)(A)(1) through (5) above) varies by more than one half of one percent (0.5%) from the Contractor’s quantity measurement, the parties may conduct a joint investigation (provided the Contractor’s representative is present) of the variation in order to identify the cause of the discrepancy.
(1) The quantities shown on the shipping document (volume corrected loading rack meter tickets) will be accepted as the quantity received, provided that any differences between that quantity and the Government’s measurement at destination using an approved method does not exceed one half of one percent (0.5%) of the amount on the shipping document and that which may be determined by the Government at the destination. If the difference is greater than one half of one percent (0.5%), the quantity determined by the Government using an approved method at the destination will be used for acceptance and payment.
(2) The Contractor may file a claim with the Contracting Officer for payment of any volume of product in dispute.
(DESC 52.211-9FA5)
F. The following Clause F20 AUTOMATIC FILL-UP PROVISIONS (DESC MAR 1999) is hereby added to this solicitation and provided in full text below:
F20 AUTOMATIC FILL-UP PROVISIONS (DESC MAR 1999)
Where, for particular items, "Automatic Fill-Up" is specified in the Schedule, the following provisions shall apply:
(a) The Ordering Officer shall furnish the Contractor (1) a map or other written information indicating the location and capacity of each receiving tank; (2) a record of deliveries to each tank during the previous heating season; and (3) a description of any restricted area and special procedures to be followed, if any.
(b) The Contractor's delivery equipment will be permitted access to the areas where deliveries are to be made between the hours of 7:00 a.m. and 7:00 p.m., Monday through Friday, unless otherwise identified in the individual delivery narratives.
(c) The Contractor shall establish and maintain a delivery schedule which will assure that the level of fuel in each tank at all times is never less than 30 percent of tank capacity. Subparagraph (b)(3) of the DELIVERY CONDITIONS FOR TANK CARS, TRANSPORT TRUCKS, AND TANK WAGONS clause shall not be applicable on those items where "Automatic Fill-Up" applies.
(d) The Contractor shall submit an invoice on each item for no more or less than the total daily delivered quantity at a particular activity.
(e) Each invoice submitted to the Government for "Automatic Fill-Up" deliveries shall be accompanied by a record of the quantity delivered into each individual tank during the period covered by the invoice.
(DESC 52.242-9FC5)
G. All other terms and conditions under this solicitation remain unchanged.