STATEMENT OF WORK

1.0 SUMMARY OF SERVICE: Puget Sound Naval Shipyard SSGN

Detachment Guam has a requirement for portable toilet trailers to support NAVSEA Civilian personnel.

2.0 PLACE OF PERFORMANCE: Polaris Point – Puget Sound Naval

Shipyard Detachment Submarine Refit Site III, PSNS Office

Trailers

3.0 PERIOD OF PERFORMANCE: 01 OCTOBER 2021 - 30 SEPTEMBER 2022

4.0 GOVERNMENT F U R N I S H E D EQUIPMENT/MATERIAL USERVICES: None

5.1 CONTRACTOR FURNISHED E Q U I P M E N T /MATERIAL SERVICES Portable

Toilet Trailers.

5.2 Item No. Description QTY Price Months

Extended Price

0001 Rental of (2) Portable Toilets or equivalent 2 12

Rental of (2) sets of Footings and Tie-Downs for (I) each 2 1 LOT

0003 Rental of (2) sets of Deck and Steps 2 1 LOT

0004 Mobilization for (1) each 2 1 LOT

0005 De-Mobilization for (1) each 2 1 LOT

0006 Cleaning Service (periodic) 1 12

6.0 NOTES: Each rental trailer, item no. 0001, shall have the following facilities;

Trailer Size: 8 x 10 or equivalent

Water: available Sewer: Drain system in place

Air Conditioning: Required

Ventilation fan or exhaust system

Secure footings for typhoon conditions

Locks: Dead bolt and Key lock

Keys QTY: 10 keys (must open both Male and Female units)

Small storage unit to store extra items such as Paper towels, Toilet Paper, cleaning products and Toiletries essentials for cleaning.

To be included Paper towel holder(s,) Garbage can

NO ADA requirements

Deck and stairs to units

Female:

4 toilets flushable

2 sinks w/ mirrors

Male:

2 toilets flushable, 2 urinals (non-flushing optional)

2 sinks w/ mirrors

STATEMENT OF WORK

7.0 QUALITY ASSURANCE REQUIREMENTS: None

8.1 STATEMENT OF WORK/ REQUIREMENTS

8.2 The contractor shall: Coordinate Power, Sewer, and Water

connection and Disconnection during setup and teardown.

Secure units when Team is off island. Designate a POC and an alternate who are experienced in handling issues.

Provide service in response to trouble calls within 24 hours.