SOWMGK.docx

DOCX document 34 KB Posted

Attached to
USS MIGUEL KIETH Gyro Troubleshooting
Solicitation number
N4044624Q0007
Issued by

About this file

This document is a Statement of Work (SOW) for a service order under Contract SSU24-031 to troubleshoot the gyro input to the Nextgen Wideband (NGW) system on the USS Miguel Keith (ESB 5). The contractor is required to provide a gyro compass technician to travel to Guam, ride the vessel to Busan, Korea, and troubleshoot the gyro heading input/output features from the gyro compass to the NGW system. The contractor must determine if the gyro compasses are the cause of the loss of communication for the NGW system and provide assistance in repairing the issue if onboard spares are available. The performance period is from June 20, 2024 to June 28, 2024, and the technical points of contact are provided. The related federal contract opportunity is Solicitation Number N4044624Q0007 for the USS Miguel Keith gyro troubleshooting requirement.

View the file

Other files

File Type Posted
S9426-AT-MMC-010_1_1 (1).pdf PDF
SSJ Redacted.pdf PDF
N4044624Q0007.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Raytheon Gyro Input to Nex GenWideband (NGW) Service Order SSU24-031

Title:USS Miguel Keith (ESB 5) Gyro input to NGW troubleshooting
Contract: SSU24-031Requisition:CASREP # 24-010

1.0 SCOPE OF WORK:

1.1 This statement of work describes the requirement for the troubleshooting gyro input to NGW.

1.2 References:

1.2.1 Tech Manual S9426-AT-MMC-010, Gyro Compass, STD 22

2.0 SPECIFIC TASKS:

2.1 Upon this Service order:

2.1.1 Provide the services of a Gyro Compass technician for the Raytheon STD 22 / STD 22NX gyro compasses.

2.1.2 Travel to Guam to meet the vessel around the prescribed dates and ride the vessel to Busan, Korea and disembark. Final dates to be determined as ship’s schedule is confirmed.

2.1.2.1 Troubleshoot the gyro heading input / output features from the gyro compass to the NGW System.

2.1.2.2 Ship SCO or an MSC N6 technician to be provided for assistance, as required.

2.1.3 Determine if the Gyro compasses are the cause of loss of communication for the NGW system due to Gyro compass input / output errors.

2.1.4 If Gyro compasses is determined to be the cause provide assistance to ships force in repairing if onboard spares are available.

2.1.5 Contractor shall use Reference 1.2.1 as guidance as well as any other Raytheon documentation supplied by the contractor.

2.1.6 Contractor shall furnish all tools and test equipment that will be required to perform the repairs and testing on the gyro compass.

2.1.7 Depart vessel in Busan, Korea and provide service report.

3.0 DELIVERABLES:

3.1 The contractor shall provide the following deliverables:

3.1.1 Contractor shall provide a service report detailing troubleshooting details, actions taken, and further repair action recommendations to the technical points of contact for this service order as delineated below.

4.0 PERFORMANCE LOCATION:

Onboard USS Miguel Keith while in transit from Guam to Busan, Korea.

5.0 PERFORMANCE PERIOD:

20 June 2024 to 28 June 2024

6.0 TECHNICAL POINT OF CONTACT:

Jim Cravens Cell: (757) 705-9395 Email: james.w.cravens.civ@us.navy.mil

Bill Gunn Email: william.r.gunn.civ@us.navy.mil

Oly Samonte Email: soliman.b.samonte.civ@us.navy.mil

Greg Tamania Email: godofredo.g.tamania.civ@us.navy.mil

Ben Cost, T-ESB Supervisory Project Engineer Office (757) 341-7657 Cell: (757) 943-7941 Email: Benjamin.t.cost.civ@us.navy.mil

7.0 ADDITIONAL INFORMATION FROM THE SHIP:

7.1 NGW maintains communications while the ship is steady on course.

7.2 NGW loses communication when the ship executes a course change and can take up to 45 minutes to regain communication.

7.3 The Antenna Control Unit (ACU) has failed to maintain tracking mode after yesterday's weather conditions that resulted in our lost connectivity. We have exhausted our distance support with INMARSAT and they have escalated our issue to their resident engineers, but the INMARSAT help desk believes our issues reside with our faulty gyro input as listed in the INMARSAT Tech report from late last month when the INMARSAT tech was on board in SAS. The INMARSAT tech placed our NGW system in a SATREF during his onsite tech assist and the ship has been able to restore connectivity once the ship maintained a steady course for 30 minutes. Today at lunch we powered down for approximately three hours until the Dynamic Positioning System was initiated. The NGW system has been on line for the last 2 hours, but the ACU only tracks for about 10 seconds before going back into search mode.