SOW(BidBuy) - Hamilton County Fuel Tank Replacement.docx
DOCX document 1 MB Posted
- Attached to
- DNR Hamilton County SFWA Fuel Tank Replacement
- Solicitation number
- 19-422DNR-REALT-B-7476
- Issued by
- Grundy County, Illinois
About this file
This document is a Scope of Work for a fuel tank replacement project at the Hamilton County State Fish and Wildlife Area in Illinois, issued by the Illinois Department of Natural Resources. The project involves replacing two existing above-ground fuel storage tanks - one 1,000-gallon diesel tank and one 500-gallon gasoline tank - and related piping and equipment. The contractor will be responsible for obtaining the necessary permits, disconnecting and removing the existing tanks, installing the new tanks per code requirements, reconnecting the existing fuel dispensers, and completing all electrical and site work. The project must be completed within 180 days of contract award.
All work must comply with the Office of the State Fire Marshal's regulations for above-ground fuel storage and dispensing. The contractor must be registered as a small business and comply with prevailing wage, apprenticeship-in-training, and other state requirements. Payment terms are per the State Prompt Payment Act, and the contract will be awarded to the lowest responsible bidder. The project may be funded in part by tax-exempt bonds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMALL CONSTRUCTION BID FORM~15.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: April 25th, 2019 File# 5-19-090
LOCATION: Hamilton County State Fish and Wildlife Area
PROJECT TITLE: Above Ground Storage Fuel Tanks
PROJECT NARRATIVE:
This project will consist of replacing the existing double walled fuel storage tanks because the inner tanks are leaking into the interstitial space. The tanks are located at the Hamilton County State Fish and Wildlife Area (SFWA). Hamilton County SFWA is located approximately eight miles southeast of McLeansboro off Route 14.
The project will include installing two (2) steel, double walled fuel storage tanks: 1-1000-gallon diesel tank and 1-500-gallon gas tank and all pertinent piping and hardware. The fuel storage system must be installed per National Electric Code (NEC) and the Office of the State Fire Marshal (OSFM) “Rules for Aboveground Fuel Dispensing Storage Tanks”, 41 Ill. Adm. Code 180. The existing fuel dispensers are less than six months old and will be removed, stored and re-installed.
SCOPE OF WORK:
The contractor will provide all labor, equipment and materials needed to install a new fuel storage system in accordance with 41 Ill. Adm. Code 180 Rules for Aboveground Fuel Dispensing Storage Tanks . The Contractor is required to file a permit application with the OSFM prior to installation and have the tanks inspected by the OSFM prior to filling. Copies of all sign-offs and approvals by the OSFM should be provided for DNR’s files.
The following items shall be addressed:
| 1) | The existing tanks will need to be emptied, dismantled and properly disposed of per Office of the State Fire Marshal Code and per EPA. The tanks are required to be disposed of at an approved disposal site per code. | |||
| 2) | The new tanks will be installed on the existing reinforced concrete pad where the tanks | are | located. The Contractor will provide and install new PVC yellow pipe covers over the existing | concrete bollards. |
| 3) | Provide one (1) single compartment double walled steel aboveground storage tank (AST) that meets all requirements per Section 180.20 of the State Fire Marshal Code and referenced sections that may apply to fuel storage and dispensing of 1,000 gallons of diesel fuel. | |||
| 4) | Provide one (1) single compartment double walled steel AST that meets all requirements per Section 180.20 of the State Fire Marshal Code and referenced sections that may apply to fuel storage and dispensing of 500 gallons of gasoline. | |||
| 5) | The existing electrical service and safety switch for emergency shut-off should be evaluated to see if it meets current NEC and State Fire Marshal Code requirements. If the existing system does not meet current code requirements, it will be the responsibility of the Contractor to include upgrades in the base bid. | |||
| 6) | Provide all new emergency shut-off signage. Sign shall say “EMERGENCY DISCONNECT SWITCH | FUEL PUMPS”. Letters on sign shall be 2” high and meet State Fire Marshal requirements. |
| 7) | Provide one new 20 lb. Tri-Class dry chemical fire extinguisher and on/off indicator light. |
| 8) | Evaluate all existing electrical service to see that it meets NEC code (NFPA 70) 1987 and State Fire Marshal requirements for conduit, wire size, and connections from the existing shop to the new fuel storage system. |
| 9) | All electrical connections must have seal-offs per Fire Marshal Code requirements. |
| 10) | Vent pipe size & height, top-fill with lockable enclosures, labeling size & color, off-set distance from other buildings, anti-siphoning devices, dispensing hoses & handles, break-away connections, and all pertinent components of the fueling systems must all meet State Fire Marshal Codes and requirements for this installation. |
| 11) | THE EXISTING DISPENSERS WERE INSTALLED WITHIN THE LAST 6 MONTHS. THE CONTRACTOR WILL REMOVE, STORE AND RE-INSTALL THE FUEL DISPENSERS. |
PROJECT OVERVIEW:
· All work and access should be coordinated with the Site Superintendent and staff.
· Apply for and receive a construction permit through State Fire Marshal’s Office.
· Remove all existing piping, tanks and miscellaneous hardware.
· Contractor to remove, store and re-install existing dispensers.
· Install two steel double walled fuel storage tanks per State Fire Marshal requirements and properly secure to existing concrete and ground.
· Connect all electrical service using approved connections.
· Provide and install all piping, miscellaneous hardware, signage and other items to make this installation an approved AST dispensing location.
· Have the new installation inspected and approved by the State Fire Marshal.
· If repairs or adjustments are required per OSFM inspection, Contractor must comply before the project is complete.
· Install and secure new PVC yellow bollard covers for 20 bollards.
· Calibrate new metering system within maximum tolerances.
· Coordinate final Inspection and approval from the State Fire Marshal’s Office.
· Clean-up all construction debris and haul off-site to an approved landfill.
ATTACHMENTS:
The following documents are included:
1) No attachments.
PROJECT SPECIFICATIONS & REQUIREMENTS:
A. Project Specifications:
1) Contractor is responsible to verify all measurements prior to bidding.
2) Contractor is responsible for locating and verifying the location of all utilities.
3) Contractor is responsible for completing and filing for an AST Dispensing Application with the Office of Illinois State Fire Marshal. The application can be found on the State Fire Marshal’s website.
4) The new tanks and all hardware must be installed per OFSM Code.
5) Tanks must be inspected and approved by OFSM upon completion of installation and prior to the tanks being filled and dispensing fuel.
6) Contractor will remove existing dispensers and re-install them on the new tanks as part of the base bid.
The following details are typical. Actual installation details must be in accordance with the Office of the State Fire Marshal 41 Ill. Adm. Code 180, Section 180.20.
| This is a drawing showing the typical layout of an AST fuel dispensing system. |
| The existing concrete pad, bollards and dispensers will be reused. The tanks and all |
| equipment will be replaced and installed per State Fire Marshal Code 180, Section 180.20 |
| and the NEC. |
This is a typical drawing showing the signage for a three-pump system. The existing
| disconnect structure and disconnects can be re-used, provided that they meet State Fire |
| Marshal and NEC codes. |
B. Project Instructions and Notes
| A minimum of eighty percent (80%) of the work shall be completed by the Contractor on this |
| project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with |
| the Illinois Department of Natural Resources. |
1) Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
2) Deliverables and Staff Training:
Two (2) sets of operating and maintenance manual and start-up procedures shall be provided to DNR. DNR staff shall receive proper training and instruction on the operation and maintenance of all new equipment.
| 3) | Independent Testing: |
| The Contractor shall pay to have the pumps calibrated prior to closing out the project; results | must be provided to the Regional Engineer. |
4) Contractor’s Licensing and/or Certifications:
Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency. This includes, but is not limited to:
a. AST Storage Tanks - Office of the State Fire Marshal
b. Licensed Electrician - for installation
5) Shop Drawings:
Submit for the approval of the DNR Project Architect/Engineer, shop drawings and product data for the following items: Tanks, piping, hoses, vents, break-away, bollard covers, top-fill equipment, disconnects, ladders, liquid level gauge, fill ports, leak detector, ground rod, emergency fuel shut-off switch and explosion proof seal-off.
| 6) | Warranty: | |
| The tanks, equipment, installation and miscellaneous equipment will have a one-year warranty, | unless otherwise specified by the manufacturers. |
C. Project Requirements:
| 1) | Project Meeting |
| PROJECT MEETING TO BE HELD: YES |X| NO |_| | |
| MANDATORY ATTENDANCE: YES |X| NO |_| |
Refer to BidBuy solicitation for meeting date and time.
| 2) | Duration |
| Bids shall be good for ninety (90) calendar days after the submittal date, or | |
| for an extended period, if agreed to in writing by the Bidder and DNR. |
| 3) | Prevailing Wage Rates |
| The Contractor must comply with provisions of the “Prevailing Wage Act”, 820 ILCS 130/, | |
| and the Illinois Procurement Code (30 ILCS 500/25-60), which applies to the wages of laborers, | |
| mechanics and other workers employed in any public works. The Contractor is responsible for | |
| contacting the Illinois Department of Labor (DOL) at 217/782-6206 or | |
| http://www.state.il.us/agency/idol to ensure understanding of prevailing wage requirements. |
| 4) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
5) Small Business Set-Aside The contractor awarded the bid must be registered as a small business, as required by the Small Business Set-Aside program. (For complete requirements, to become registered, or certify your business in the Small Business Set-Aside Program, visit http://www.sell2.illinois.gov/sbsp/set_aside.htm. or contact the Department of Central Management Services’ small business coordinator at 1-866-455-2897.)
6) Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .
| 7) | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement | |
| Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only | |
| Provides goods or supplies that are incidental to the performance of a contract by a person | |
| who has a contract subject to the Code. |
| 8) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
9) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
10) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
11) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
12) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
13) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
14) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 15) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
16) Specified Materials Bids shall be based on providing all products exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
17) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.
18) Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that may apply.
19) Change Orders Change orders must be determined by DNR to be germane to the original contract and that the price is fair and reasonable. When changes in or modifications to the work become necessary, the Contractor shall submit an itemized proposal for the work and shall include appropriate documentation to support the cost for the labor, material and equipment.
20) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
21) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 22) | Contract Award |
| Contract award will be made to the lowest, responsible, qualified bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 23) | Term of Contract |
| All work shall be completed within 180 days from the last dated signature on the fully executed | |
| Contract or from the Notice to Proceed, unless agreed to by both the Contractor and | |
| DNR, that a time extension is warranted. |
24) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to DNR.ENGBID@illinois.gov .
| 25) | Bid Submittal Date and Time |
| Refer to the BIDBUY solicitation for the bid date and time. |
26) Questions
ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST
BE DIRECTED TO DNR.ENGBID@illinois.gov . ALL QUESTIONS MUST BE SUBMITTED IN WRITING.
27) Project Contacts: The following individuals are listed as project contacts during the construction phase. The Bidder may not communicate directly with any of these individuals during the bidding process. All communication during the bidding phase must be directed to the DNRENGBID@illinois.gov email address
| Project Architect/Engineer: | Gary W. Iles | ||
| Illinois Department of Natural Resources | |||
| 14694 N. Lost Lake Lane | |||
| Mt. Vernon, IL, 62864 | |||
| Phone: | (618) 920-1118 | ||
| E-mail: | Gary.Iles@illinois.gov |
| Site Superintendent: | Mike Lewis | ||
| Hamilton County State Fish and Wildlife Area | |||
| 10279 Sunrise Point Rd. | |||
| McLeansboro, IL, 62859 | |||
| Phone: | (618) 773-4340 | ||
| Fax: (618) 773-4382 | |||
| E-mail: | Michael.K.Lewis@illinois.gov |
| Billing: | Kim Gibson | |||||
| Illinois Department of Natural Resources | Division of Architecture & Engineering | One Natural Resources Way | Springfield, IL 62702 | |||
| Phone: 217-785-4827 | ||||||
| Fax: | 217-782-9599 | |||||
| E-mail: Kimberly.Gibson@illinois.gov |