SOW68.pdf

PDF 132 KB Posted

Attached to
Eagle St IRA - Driveway/Parking Lot Prep & Seal
Solicitation number
2110302
Issued by
Ontario County, New York

About this file

This document is a Project Scope Description for a driveway and parking lot preparation and sealing project at the Finger Lakes DDSO Hostel #2638 located at 32 Eagle St, Phelps, NY 14532. The vendor will be responsible for preparing the surface by sweeping, blowing, and/or washing, filling all cracks with a quality filler, and applying a quality sealant to the prepared surface. This is a New York State Public Works project, and the work must be completed within 40 days of award unless otherwise modified. A mandatory site visit is scheduled for June 5, 2024 at 10:00 AM, and bids will not be accepted from vendors that do not attend. The scope of work also includes adhering to general requirements such as securing tools and materials, coordinating with the Plant Superintendent, and maintaining a safe environment for the occupied residence.

The bid price must include all materials, labor, disposal fees, and site cleanup, with final acceptance provided by the Maintenance Supervisor. This is not a Service-Disabled Veteran-Owned Set Aside contract. The contract term is 30 days after completion of the project, and the work will take place in Ontario County, New York.

View the file

Other files

File Type Posted
Bid Tab180.pdf PDF
RFQ86.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

DESCRIPTION:

(Prepare surface of driveway and parking area and seal). The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 40 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of (final driveway sealing), before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

SCOPE OF WORK includes, but is not necessarily limited to the following:

1. Prepare driveway & parking area surface by means of sweeping, blowing, and/or washing. Prepare surface per sealant manufacturer’s specifications.

2. Fill in ALL cracks with a quality crack and grove filler. Allow to setup/cure per manufacturer’s instructions.

3. Apply a Quality sealant to prepared surface per manufacturer’s instructions. Apply evenly and abundantly.

4. Follow all NYS OGS specifications on asphalt maintenance and sealing.

GENERAL REQUIREMENTS:

1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.

Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

2. Work is to be done between the hours of 8am and 7pm weekdays or weekends.

Contractor is advised that this is an occupied home and may be occupied during these times.

3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.

4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.

5. Smoking is prohibited by contractors at all residential and program sites owned by

OPWDD.

Facility:

Finger Lakes DDSO Hostel #2638

Facility Address:

32 Eagle St. Phelps, NY 14532

Point of Contact:

James W. Robinson PSB

Contact Phone Number:

518 948-0397

Project Title:

Driveway Sealing JR051524C

Summary of Work:

Prepare driveway surface and seal.

6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.

7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

A site visit is mandatory. The site visit date is scheduled for Wednesday, June 5, 2024 @ 10:00am at the project site. All prospective bidders are encouraged to attend.

A. Lawn Damage/Property Damage

• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

• Personal vehicles are not to be parked on the grass.

• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

• Once the job has begun, it is to be worked on continuously until completed.

• If there are any delays, even if due to inclement weather, a Work Control Representative

MUST be contacted.

• Work must be completed within 40 days of receiving the purchase order.

C. House Safety

• The residence will be occupied during the job.

• The contractor must take all reasonable care to safeguard the residents and the staff.

• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.

• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.

• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.

SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Prepare driveway & parking area surface by means of sweeping, blowing, and/or washing. Prepare surface per sealant manufacturer’s specifications.
2. Fill in ALL cracks with a quality crack and grove filler. Allow to setup/cure per manufacturer’s instructions.
3. Apply a Quality sealant to prepared surface per manufacturer’s instructions. Apply evenly and abundantly.
4. Follow all NYS OGS specifications on asphalt maintenance and sealing.
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of 8am and 7pm weekdays or weekends. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

File details come from the government source that posted it. Updated .