SOW Water Heater Replacements (1).pdf

PDF 2 MB Posted

Attached to
Replace 100 gallon and 40 gallon Natural Gas Water Heaters - Byron, GA.
Solicitation number
12405B23Q0580
Issued by

About this file

This statement of work outlines requirements for replacing two natural gas water heaters at the USDA Southeastern Fruit and Tree Nut Research Laboratory in Byron, Georgia. The contractor will remove and dispose of the existing 100-gallon water heater in the Main Building that caught fire, replacing it along with repairing or replacing a tee joint. In the North Headhouse, the contractor will remove and dispose of the existing 40-gallon water heater with a stuck shut-off valve, replacing it along with repairing or replacing the valve. All work must be done during normal business hours and meet local and state codes and standards. The related federal contract opportunity from the Department of Agriculture seeks bids for this work with the solicitation number 12405B23Q0580.

View the file

Other files

File Type Posted
Amendment -03.pdf PDF
Amendment -03 - Revised Statement of Work (SoW).pdf PDF
Amendment -02.pdf PDF
Amendment -01.pdf PDF
12405B23Q0580-SF-1449 Request for Quote.pdf PDF
S C Wage Determination -.pdf PDF
Water Heater Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Replace Hot Water Heaters Main Building & N. Headhouse

Southeastern Fruit and Tree Nut Research Laboratory 21 Dunbar Rd., Byron, GA 31008

Byron, GA

2.0 Background

The existing Main Building water heater recently caught on fire and caused a seal leak. The existing water heater in N.

Headhouse has been out of service for several years and the shut-off valve has been closed since and is now stuck/fused

Contractor Requirements

3.0 Technical Requirements / Tasks

Describe the specific tasks or work the contractor must perform. Provide direction on any specific

General Information

1.0 Scope of Work

Replace 100-gallon natural gas water heater and repair/replace tee joint Main Building; replace 40-gallon natural gas water heater and repair/replace shut off valve North Headhouse, Byron, GA.

Demo & dispose of old water heaters, repair or replace tee joint and shut-off valve. Install new water heaters ensuring The Product Meets Local And State Codes, Standards, And Regulations.

4.0 Government Furnished

None

5.0 Deliverables / Schedule

All written deliverables shall be phrased in layperson All work can be done during normal working hours, the Facilities Operation Specialist William Rengstorf will arrange water shut down with building personal.

Facilities Operations Specialist will do the final inspection before job is signed off as

Insert Deliverables / Schedule Here

6.0 Travel

None

7.0 Contractor’s Key Personnel

Key personal will be certified and licensed with the knowledge of ANSI & ASME Specifications.

8.0 Security Requirements

Specify security requirements that apply to the contract performance. Specify the level of clearances required and identify positions that are applicable.

Insert Security Requirements Here None

9.0 Data Rights

If data is to be produced, furnished, acquired, or used in meeting contract requirements, delineate the respective rights and obligations of the government and the contractor regarding the use, production, and disclosure of that data.

Insert Data Rights Here None

2 3

10.0 Section 508 – Electronic and Information Technology Standards When information technology is to be acquired, include language describing Section 508 requirements.

Main Building Water Heater

Name Plate

Main Bldg. Tee Joint to repair/replace.

Close up of Tee

N. Headhouse Water Heater

Name Plate

N. Headhouse Water Heater Shut-Off Valve Repair/Replacement