This document is a Statement of Work for a federal contract to replace water heaters at two facilities of the US Department of Agriculture Southeastern Fruit and Tree Nut Research Laboratory in Byron, Georgia. The contractor will remove and dispose of two existing natural gas water heaters, one 100-gallon unit in the Main Building and one 40-gallon unit in the North Headhouse. The contractor will also repair or replace a tee joint in the Main Building and a shut-off valve in the North Headhouse. The contractor must install new water heaters and exhaust vents in accordance with local, state, and federal codes and standards. All work must take place during normal business hours as coordinated with the facilities manager. The related solicitation is for the replacement of the water heaters as described in the Statement of Work, issued by the USDA Agricultural Research Service under solicitation number 12405B23Q0580.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment -03.pdf | ||
| Amendment -02.pdf | ||
| Amendment -01.pdf | ||
| 12405B23Q0580-SF-1449 Request for Quote.pdf | ||
| SOW Water Heater Replacements (1).pdf | ||
| S C Wage Determination -.pdf | ||
| Water Heater Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Replace Hot Water Heaters Main Building & N. Headhouse
Southeastern Fruit and Tree Nut Research Laboratory 21 Dunbar Rd., Byron, GA 31008
Byron, GA
2.0 Background
The existing Main Building water heater recently caught on fire and caused a seal leak. The existing water heater in N.
Headhouse has been out of service for several years and the shut-off valve has been closed since and is now stuck/fused
Contractor Requirements
3.0 Technical Requirements / Tasks
General Information
1.0 Scope of Work
Replace 100-gallon natural gas water heater and repair/replace tee joint Main Building; replace 40-gallon natural gas water heater and repair/replace shut off valve North Headhouse, Byron, GA.
Demo & dispose of old water heaters & exhaust vents, repair or replace tee joint and shut-off valve. Install new water heaters & exhaust vents ensuring The Product Meets Local And State Codes, Standards, And Regulations.
See attached pictures below.
4.0 Government Furnished
None
5.0 Deliverables / Schedule
All written deliverables shall be phrased in layperson All work can be done during normal working hours, the Facilities Operation Specialist William Rengstorf will arrange water shut down with building personal.
Facilities Operations Specialist will do the final inspection before job is signed off as
Insert Deliverables / Schedule Here
6.0 Travel
None
7.0 Contractor�s Key Personnel
Key personal will be certified and licensed with the knowledge of ANSI & ASME Specifications.
8.0 Security Requirements
Specify security requirements that apply to the contract performance. Specify the level of clearances required and identify positions that are applicable.
Insert Security Requirements Here None
9.0 Data Rights
If data is to be produced, furnished, acquired, or used in meeting contract requirements, delineate the respective rights and obligations of the government and the contractor regarding the use, production, and disclosure of that data.
Insert Data Rights Here None
10.0 Section 508 � Electronic and Information Technology Standards When information technology is to be acquired, include language describing Section 508 requirements.
Main Building Water Heater
Name Plate
Main Bldg. Tee Joint to repair/replace.
Close up of Tee
100 Gallon Exhaust Vent
N. Headhouse Water Heater
Name Plate
N. Headhouse Water Heater Shut-Off Valve Repair/Replacement
40 Gallon Exhaust Vent