SOW Visitor Center HVAC.pdf

PDF 128 KB Posted

Attached to
HVAC REPAIR/REPLACE ON BUILDING 07 - El Reno, OK
Solicitation number
1232SA25Q0149
Issued by

About this file

This Performance Work Statement (PWS) details an HVAC repair project for the USDA Agricultural Research Service (ARS) Visitor Center located at 7207 W. Cheyenne Street in El Reno, Oklahoma. The scope of work involves replacing the existing 5-ton HVAC system on the 2nd floor, which includes removing the old furnace (132k btu 80%), A-coil, condenser, and filter drier, and installing new equipment with improved specifications: a 120k btu 95%+ furnace, 5-ton A-coil, 5-ton 16 SEER condenser, and filter drier.

The comprehensive work includes fabricating and installing new supply/return transitions, drain lines, and flue piping, utilizing existing line sets where possible, performing leak checks, connecting to the disconnect box, evacuating and charging the system, and testing heating and cooling operations. The project requires compliance with ARS Facilities Design Standards, energy management plans, and applicable federal, state, and local codes. The contractor is responsible for site safety, protection of work and property, cleaning up the job site, and providing a one-year warranty on workmanship, with the entire project expected to be completed within 45 days after the notice of award.

View the file

Other files

File Type Posted
SOW Visitor Center HVAC UPDATED.pdf PDF
1232SA25Q0149.pdf PDF
2015-5315 Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA ARS OCPARC – El Reno 7207 W. Cheyenne St.

El Reno, OK 73036

Performance Work Statement BD.07 (Visitor Center) HVAC Repair

SECTION 01010 ‐ SCOPE OF WORK

A. GENERAL: It is the intent of these general conditions, specifications, together with the contract, to include all labor, materials, equipment, transportation, permits and fees, temporary protection and supervision necessary to complete the required work. All work shall be done under the direction of and completion to the satisfaction of the Contracting Officer.

1. Project Description:

HVAC repair on BD. 07 (Visitor Center) 2nd floor, at the USDA, ARS, OCPARC El Reno, located at 7207 W. Cheyenne Street, El Reno, OK 73036.

Replace 5Ton HVAC System (serves 2nd floor, furnace located in 2nd floor closet)

Work includes:

1‐1. Remove old furnace (132k btu 80%), A‐coil (5ton), condenser (5ton), and filter drier.

1‐2. Install new furnace (120k btu 95%+), A‐coil (5ton), condenser (5ton 16 SEER), and filter drier.

1‐3. fabricate and install new supply/return transitions to match up to existing duct work.

1‐4. Install all necessary drain lines between new furnace cabinet, and existing drainpipe located in closet.

1‐5. Install/modify new flue piping as necessary.

1‐6. Utilize existing line set if possible.

1‐7. Flush and purge existing line set to be used with new refrigerant.

1‐8. Leak check new system with dry nitrogen.

1‐9. Connect unit to disconnect box with new whip.

1‐10. Evacuate system and charge to manufacturer specs.

1‐11. Test heating and cooling for proper operation.

1‐12. Provide all warranty paperwork to customer.

1‐13. Clean up jobsite. Off‐site disposal is the contractor’s responsibility. Some of the equipment/parts being replaced may be of use to the facility. Maintenance staff will be allowed to keep some/any of the removed equipment/parts for facility needs.

The contractor shall furnish all labor, tools, equipment, transportation to the job site, and supervision for the job indicated above. The contractor shall furnish all material except material listed in the government furnished material section of this document.

2. Government Furnished Equipment: None

3. Site Visit: TBD – See SAM.gov posting for details

4. Codes and Standards: Replacement shall comply with the requirements of ARS Facilities Design Standards Manual 242.1, ARS Energy Management Plan 134.2 and all other applicable federal, state and local code requirements as well as current industry standards, (ie. UBC, UPC, NFPA, UL, ASTM, ACI, NEC, NEMA., etc,) and health and safety codes, in effect at the time of contract award. ARS Design manuals can be found on the website under “P&P and Manuals” at http://www.afm.ars.usda.gov/facilities/pplist‐FD.htm.

5. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the responsibility of the Contractor.

6. Application: It shall be the responsibility of the Contractor to perform all work in accordance with the manufacturers’ recommendations and Industry Standards. If any item specified herein and/or on the drawings conflicts with applicable codes and recommendations, the contractor shall bring it to the attention of the Contracting Officer for immediate resolution.

SECTION 01050 ‐ FIELD ENGINEERING/INSPECTION OF SITE

A. The Contractor shall be responsible for verifying site conditions, making quantity take‐offs, obtaining accurate measurement of existing conditions, and performing any act or operation which may be necessary to properly bid the work and complete the same as depicted and specified. Failure to verify the existing site conditions shall not relieve the Contractor of the responsibility to complete the work as required.

SECTION 01300 ‐ SUBMITTALS

A. Manufacturer's descriptive literature sufficient to determine conformance of the proposed product to the contract requirements shall be submitted to the CO for review and approval. The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.

B. Installation procedures supplied by the manufacturer.

SECTION 01400 ‐ QUALITY CONTROL

A. GENERAL: To satisfy the requirement for Quality Control, the work performed under this contract shall be subject to continuous audit by the Location Site Monitor (LSM). Quality control is the exclusive responsibility of the Contractor.

B. FINAL ACCEPTANCE: Acceptance of the completed work will be based upon its conformance to the contract.

C. WARRANTY: The warranty period for workmanship shall be for one (1) year from the date the government accepts the work.

SECTION 01525 ‐ SAFETY REQUIREMENTS

A. The Contractor shall implement, and provide to the Contracting Officer (CO) for review, a site specific, SITE SAFETY AND HEALTH PLAN in accordance with all local, state and federal regulations. The plan shall address, at a minimum all responsible parties by name, all safety/health hazards, personal protective equipment and other hazard controls, all required training, emergency procedures, and other required information to perform the work. The plan shall be implemented by contractor supervisor signature. Two copies shall be provided to the Contracting Officer and one copy will be maintained at the site. In the event of changing site conditions or hazards, the plan shall be appended in writing and a copy of the change provided to the CO and COR.

SECTION 01545 ‐ PROTECTION OF WORK AND PROPERTY

A. The Contractor shall protect the work, the site, and all existing property and structures within the limit of replacement activities or that may be affected thereby until acceptance of the work.

Any damage to property shall be repaired at the Contractor’s expense, to pre‐damaged condition to the satisfaction of the COR.

B. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities for protection and security.

SECTION 01560 ‐ TEMPORARY FACILITIES

A. Temporary utilities (water and electricity) will be furnished to the Contractor by the Government, if so requested. Contractor shall maintain and protect all such utilities during the course of replacement and shall repair or replace any items damaged through is own negligence.

B. Should the Contractor require any power or utility shutdown during replacement, he shall receive approval for such shutdown from the LSM three working days prior to this need.

SECTION 01600 ‐ MATERIALS AND EQUIPMENT

A. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer's latest standard design.

B. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplier and Contractor before, during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft or damage of any kind whatsoever to the materials and equipment. All materials and equipment furnished by Contractor shall be subject to inspection and approval by the CO/LSM.

D. EXECUTION:

(a) The Contractor shall provide the necessary tools, equipment, labor, coordination, and related materials necessary for the completion of work.

(b) Erection techniques employed by the Contractor must be in accordance with the manufacturing company's suggested erection procedures. Work is expected to be completed no later than 45 days after notice of award.

SECTION 01710 ‐ CLEANING

Upon completion of project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the

LSM.

SECTION 01711 – WARRANTY

Submit data concerning the standard one year warranty for workmanship, including the warranty period (dates), and warranty contacts with names, addresses and telephone numbers.

Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one‐year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.

File details come from the government source that posted it. Updated .