This Statement of Work (SOW) details a reduction gear inspection for the USCGC VENTUROUS. The Coast Guard requires a contractor to inspect the NR1 Reduction Gear, evaluate component wear, verify pinion and bull gear alignment, and generate a service report/repair plan. Specific tasks include repairing the drive gear on the torque shaft and two gear-driven pumps. The performance period is 10NOV25-14NOV25, with work to be conducted at the vessel's location in St. Petersburg, FL. Ships forces will provide mechanics, riggers, a torch, common hand tools, and a small hydraulic press to support the inspection. The Contracting Officer Technical Representative (COR) is LT Anthony V. Medlar, who can be contacted at anthony.v.medlar@uscg.mil or via the provided phone numbers.

View the file

Other files

File Type Posted
SFLC-Std-Spec-0000-(2022) GenRequirements.pdf PDF
627-WMEC_241_5_1_-_A.pdf PDF
4649_233_A Red Gear.pdf PDF
Smart Matrix SAP CM FFP.pdf PDF
627-WMEC_243_50_1_-_-.pdf PDF
627-WMEC_241_7_1_-_K.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)

USCGC VENTUROUS NR1 Reduction Gear Inspection

1. Background and Current Observed Issues

CGC VENTUROUS is requesting a contractor inspects the NR1 Reduction Gear, evaluates the components for wear, verifies the alignment of the pinion and bull gear, and generates a service report/repair plan. The drive gear on the torque shaft and the two gear driven pumps need to be repaired.

2. REFERENCES

Coast Guard Drawing 627 WMEC 241-005, Rev A, Lufkin HSQ2724 Marine Gear, View, Cross

Section

Coast Guard Drawing 627 WMEC 241-007, Rev K, Lufkin HSQ2724 Marine Gear, Plan, Installation

– Starboard Unit

Coast Guard Drawing 627 WMEC 243-050, Sectional Assembly Special No. 750 ST Coupling

Coast Guard Technical Publication (TP) 4649, Main Propulsion Plant, SWBS 233, May 2024

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General

Requirements

3. REQUIREMENTS

Ships forces will provide the necessary mechanics and riggers to assist and will provide a torch to heat up the main drive gear, common hand tools, and a small hydraulic press for pressing pump gears off the pump shafts.

4. PERIOD OF PERFORMANCE

The period of the performance will be 10NOV25-14NOV25

5. PLACE OF PERFORMANCE

The primary place of performance shall be at CGC VENTUROUS located at below address:

USCGC VENTUROUS (WMEC-625)

600 8th Ave. SE

St. Petersburg, FL 33701

(571) 610-4967

Contracting Officer Technical Representative (COR):

LT Anthony V. Medlar, EO

Ship: (571) 610-4967

Cell: (914) 490-3012

Email: anthony.v.medlar@uscg.mil mailto:anthony.v.medlar@uscg.mil

File details come from the government source that posted it. Updated .