SOW Ventilation Duct Cleaning 002.docx

DOCX document 40 KB Posted

Attached to
CGC Forward Ventilation Duct Cleaning
Solicitation number
11511QR260000151
Issued by

About this file

This is a Statement of Work (SOW) for ventilation duct cleaning services on the USCGC Forward (WMEC 270), a 270-foot Medium Endurance Cutter homeported in Portsmouth, Virginia. The contractor shall provide all necessary management, labor, materials, and equipment to clean and inspect ventilation ducting throughout the vessel's galley, pantry, laundry, engineering, motor rooms, and other spaces in accordance with Surface Forces Logistics Center Standard Specifications 0000 and 5100, with work performed between 0600-1600 EST Monday through Friday from April 20, 2026 to May 18, 2026.

The work encompasses four primary tasks: cleaning galley and pantry exhaust systems heavily coated with oils and grease requiring disassembly and reassembly with new gaskets and fasteners; cleaning laundry space supply and exhaust systems; cleaning engineering and motor room ventilation systems across multiple compartments; and cleaning general ventilation systems in magazine spaces, antenna arrays, workshops, and other vessel spaces. All work shall employ video probe equipment for internal inspection, include protective coverings to prevent contamination, utilize Coast Guard-provided technical drawings and specifications, and conclude with operational testing in the presence of Coast Guard inspectors. Contractors must submit weekly progress reports each Tuesday, Condition Found Reports within 24 hours of discovery, test and inspection reports within 24 hours of completion, and a comprehensive final report upon contract completion. All contractor personnel require valid REAL ID-compliant identification for base access, and the Contracting Officer Technical Representative is LT Claire Gilliland.

View the file

Other files

File Type Posted
11511QR260000151 Q and A.docx DOCX document
Additional Far Clauses 00151.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) USCGC Forward Ventilation Cleaning FY 2026

1. BACKGROUND

The USCGC Forward (WMEC 270) is a 270-foot Medium Endurance Cutter. To maintain operational readiness, ensure the vessel meets its designated service life, and improve habitability for her crew members, the cutter is cleaning all ventilation ducting throughout the ship. This SOW outlines the required depot-level maintenance. The contractor shall furnish the necessary management, labor, materials, and equipment to accomplish the work items listed herein, in accordance with the detailed specifications provided in the applicable reference document.

2. REQUIREMENTS

The work items include the following major items:

1. Galley and Pantry Spaces

2. Laundry Spaces

3. Engineering and Motor Rooms

4. General; All Other Spaces

All work shall be performed in strict accordance with the specification referenced.

3. APPLICABLE DOCUMENTS

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

3.1 COAST GUARD PUBLICATIONS

a. Coast Guard Drawing 905 WMEC 514-032, Rev -, HVAC System Diagram

b. Coast Guard Drawing 905 WMEC 514-005, Rev C, HVAC Fan Rooms Main Deck A & D

c. Coast Guard Drawing 905 WMEC 512-009, Rev C, Vent 01 Lvl and Above Fr 103-140 A & D

3.1 COAST GUARD DRAWINGS

a. Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

b. Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean Shipboard Ventilation Systems

4. DELIVERABLES AND REPORTING

The Contractor shall provide the following reports and deliverables to the designated Government Representative(s) in a timely and professional manner. Unless otherwise specified, all deliverables shall be submitted electronically in Microsoft Office or Adobe PDF format.

4.1 WEEKLY PROGRESS REPORTS

The Contractor shall submit weekly progress reports to the cutter Engineer Officer summarizing contract performance during the reporting period. At a minimum, each report shall include:

a. Work accomplished during the reporting period.

b. Status of all open work items.

c. Problems encountered and proposed corrective actions, if applicable.

d. Work planned for the next reporting period.

Weekly progress reports shall be submitted no later than 10:00 AM EST each Tuesday.

4.2 CONDITION FOUND REPORTS (CFRs)

The Contractor shall submit a Condition Found Report when unforeseen conditions or work requirements are identified that are not covered by the original specification. Each CFR shall include a detailed description of the condition, recommended corrective action, and an estimated cost and schedule impact. CFRs shall be submitted within twenty-four (24) hours of discovery. No work associated with a CFR shall commence without written Government approval.

4.3 TEST AND INSPECTION REPORTS

The Contractor shall submit test and inspection reports documenting the procedures performed and results obtained for all tests required by the specification. Reports shall be submitted within twenty-four (24) hours following completion of each test or inspection.

4.4 FINAL REPORT

The Contractor shall submit a one-time comprehensive final report summarizing all work performed under the contract. At a minimum, the final report shall include a description of completed tasks, test and inspection results, resolution of all CFRs, and final project status. The final report shall be submitted upon completion of all contract requirements.

5. STATEMENT OF CAPABILITIES

The contractor shall submit a Statement of Capabilities demonstrating its ability to fulfill the requirements of this SOW. The Statement of Capabilities shall, at a minimum, describe the Contractor’s relevant experience, technical expertise, personnel qualifications, quality control processes, and past performance on similar efforts.

6. OTHER APPLICABLE CONDITIONS

6.1 PERIOD OF PERFORMANCE

20 April 2026 – 18 May 2026

6.2 PLACE OF PERFORMANCE

The primary place of performance shall be CGC Forward located at below address:

4000 Coast Guard Blvd Portsmouth, VA 23703

6.3 CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COR)

LT Claire Gilliland Email: Claire.A.Gilliland@uscg.mil Phone: 508-367-9123

6.4 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0600 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW

6.5 GOVERNMENT FURNISHED PROPERTY

The Government will not furnish any resources to the Contractor in support of this contract. The Government will provide all necessary information, data and documents to the Contractor for work required under this contract.

The Contractor must use Government furnished information, data and documents only for the performance of work under this contract, and must be responsible for returning all Government furnished information, data and documents to the Government at the end of the performance period. The Contractor must not release Government furnished information, data and documents to outside parties without the prior and explicit consent of the Contracting Officer.

7. SPECIFIC REQUIREMENTS/TASKS

7.1 PROTECTIVE MEASURES

The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

Install filter medium at the terminal ends of all supply vent ducting to prevent any residual foreign matter from blowing into the engine room spaces

7.2 INTERFERENCES

The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

•Ducting screens
•Dishwasher/laundry ducting
•Ceiling tiles and supports
•Overhead sheathing

NOTE : Coast Guard personnel will operate all shipboard machinery and equipment.

8. SECURITY REQUIREMENTS

All contractor personnel requiring access to the place of performance to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.

WORK ITEM 1: GALLEY AND PANTRY SPACES

1. CLEANING REQUIREMENTS

The Contractor shall clean and inspect the following ventilation systems, shown on Coast Guard Drawings 905 WMEC 512-009, 905 WMEC 514-032, and 905 WMEC 514-005, in accordance with SFLC Std Spec 5100. Submit a CFR.

VENTILATION SYSTEM
TYPE
LOCATION
01-117-2
Exhaust
Galley (1-145-2-Q), Scullery (1-129-2-Q)
1-117-1
Supply
Galley (1-145-2-Q), Scullery (1-129-2-Q)

NOTE: Past experience has shown that the Galley and Scullery exhaust ventilation systems have accumulated oils and greases and systems are coated with a very sticky and very thick sludge. Take this into consideration in the bid.

Disassemble the exhaust system as required to clean all sections of the exhaust system. After cleaning, reassemble vent ducting using new gaskets and fasteners.

Prior to reassembling the vent systems, visually inspect the systems in the presence of the Coast Guard Inspector. Verify that the vent systems are clean and oil and build up free. The Contractor shall use video probe equipment to allow viewing the internal surfaces of all vent ducting.

2. ADDITIONAL PROTECTIVE COVERING

In addition to providing protective covering as specified in SFLC Std Spec 5100, subsection 3.1.3 (Protective measures), provide additional protective covering for all food preparation and serving surfaces in the immediate work area, as applicable, to prevent contamination.

3. OPERATIONAL TEST – POST REPAIR

After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems disturbed to be in satisfactory operating condition. Submit a CFR.

NOTE : Coast Guard personnel will operate all shipboard machinery and equipment.

WORK ITEM 2: LAUNDRY SPACES

1. CLEANING REQUIREMENTS

The Contractor shall clean and inspect the following ventilation systems, shown on Coast Guard Drawings 905 WMEC 512-009, 905 WMEC 514-032, and 905 WMEC 514-005, in accordance with SFLC Std Spec 5100. Submit a CFR.

VENTILATION SYSTEM
TYPE
LOCATION
02-58-2
Supply
PLTHS (02-48-0-C), Laundry (1-47-1-Q), Fan Rm (02-45-0-Q), Comm Ctr (3-47-0-C)
02-53-1
Exhaust
Laundry (1-47-1-Q), Fan Rm (02-45-0-Q), Comm Ctr (3-47-0-C)

Disassemble the exhaust system as required to clean all sections of the exhaust system. After cleaning, reassemble vent ducting using new gaskets and fasteners.

Prior to reassembling the vent systems, visually inspect the systems in the presence of the Coast Guard Inspector. Verify that the vent systems are clean and oil and build up free. The Contractor shall use video probe equipment to allow viewing the internal surfaces of all vent ducting.

2. OPERATIONAL TEST – POST REPAIR

After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems disturbed to be in satisfactory operating condition. Submit a CFR.

WORK ITEM 3: ENGINEERING AND MOTOR ROOMS

The Contractor shall clean and inspect the following ventilation systems, shown on Coast Guard Drawings 905 WMEC 512-009, 905 WMEC 514-032, and 905 WMEC 514-005, in accordance with SFLC Std Spec 5100. Submit a CFR.

VENTILATION SYSTEM
TYPE
LOCATION
01-106-1
Supply
Eng Rm (3-103-0-E), Eng Control Center (3-152-0-E)
01-106-2
Supply
Eng Rm (3-103-0-E)
1-211-2
Exhaust
Engineer Stores (1-186-0-A), Trash Compactor Space (1-186-3-Q). Fan Space (3), Hawser & Rescue Equip Stowage (2-207-3-A), P-Way (2-207-0-L), Steering Gear Rm (3-228-0-E), Refrig & Dry Stores (4-169-0-A), Computer Rm (1-186-2-Q)
1-121-1 or 1-212-1
Exhaust
San Space (2-186-0-L), JP-5 Pump Rm (4-186-0-J)
1-209-1
Supply
JP-5 Pump Rm (4-186-0-J)

Disassemble the exhaust system as required to clean all sections of the exhaust system. After cleaning, reassemble vent ducting using new gaskets and fasteners.

Prior to reassembling the vent systems, visually inspect the systems in the presence of the Coast Guard Inspector. Verify that the vent systems are clean and oil and build up free. The Contractor shall use video probe equipment to allow viewing the internal surfaces of all vent ducting.

2. OPERATIONAL TEST – POST REPAIR

After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems disturbed to be in satisfactory operating condition. Submit a CFR.

WORK ITEM 4: GENERAL; ALL OTHER SPACES

The Contractor shall clean and inspect the following ventilation systems, shown on Coast Guard Drawings 905 WMEC 512-009, 905 WMEC 514-032, and 905 WMEC 514-005, in accordance with SFLC Std Spec 5100. Submit a CFR.

VENTILATION SYSTEM
TYPE
LOCATION
1-21-2
Recirc
Magazine (1-26-0-M)
02-75-1
Recirc
Antenna Array Stbd (2-63-0-C)
02-79-2
Recirc
Antenna Array Port (2-63-0-C)
02-84-2
Recirc
ESM Equipment Rack (2-63-0-C)
01-84-1
Recirc
WRSR (01-68-0-L)
1-37-1
Supply
Magazine (1-26-0-M)
02-108-1
Supply
Replenishment air Sys R1-121-1
2-208-1
Supply
Aviation Stores (2-207-2-A), Hawser & rescue eqpt stwg (2-207-3-A), eng'rs stores (2) (1-186-0-A) Aft repair #3 (2-221-1-Q), Steering Gear RM (3-228-0- E), Refrig & dry stores (4-169-0-A), Computer Rm (1-186-2-Q)
02-107-1
Exhaust (Incl crankcase exh from motor to stacks)
Avionics Wkshp (01-103-0-Q), Engr's wkshp (1- 82-4-Q(P)), Elect wkshp (1-90-2-Q(P)), AMS No 1 (2-82-0-E) & AMS No 2 (3-82-0-E) , Winch Mach Sp (1-95-1-Q), Fwd Repair No 2 (01-68-01-L)

Disassemble the exhaust system as required to clean all sections of the exhaust system. After cleaning, reassemble vent ducting using new gaskets and fasteners.

Prior to reassembling the vent systems, visually inspect the systems in the presence of the Coast Guard Inspector. Verify that the vent systems are clean and oil and build up free. The Contractor shall use video probe equipment to allow viewing the internal surfaces of all vent ducting.

2. OPERATIONAL TEST – POST REPAIR

After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems disturbed to be in satisfactory operating condition. Submit a CFR.

File details come from the government source that posted it. Updated .