This is a Scope of Work statement for an asbestos abatement project issued by the Department of Mental Health Southeast Area Agency for the Pocasset Community Mental Health Center located at 830 County Road, Pocasset, Massachusetts. The project encompasses asbestos remediation and disposal services for three distinct work areas: a small section of HVAC duct insulation requiring removal to accommodate duct access panel installation on two sides, 535 square feet of flooring in a maintenance shop office area, and 30 square feet of flooring in a maintenance shop bathroom, including base cove areas. The contractor is classified under OSD Trade Category TRD01, Category 5: General Contracting Services. A mandatory site visit is required on either September 2nd or 3rd, 2026, between 8:30 a.m. and 10:00 a.m. Bids are due by September 10, 2026, at 2:00 p.m. The project is expected to commence in September or October 2026, with an anticipated duration of 2 to 3 days. The facility contact is Travis Sheppard, Facility Director, reachable at 508-564-9627 or Travis.L.Sheppard@mass.gov.
The contractor is responsible for verifying all measurements and descriptions, identifying interferences such as drop ceiling tiles and support grids, and arranging generator waste disposal shipping. Facility staff will handle furniture and fixture removal to provide clear access and will separately hire an independent contractor for air quality monitoring and reporting. The contract includes prevailing wage rate requirements and an OSD bid form. No information regarding pricing terms, set-asides, incumbents, or specific funding sources and amounts is provided in this scope of work document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MA WEEKLY CERTIFIED PAYROLL FORM PREVAILING WAGE~92.pdf | ||
| SDO SBPP Bid language required 4.28.2022~94.docx | DOCX document | |
| PREVAILING WAGE WEEKLY STATEMENT OF COMPLIANCE MA~93.pdf | ||
| PWS 20260826142634.pdf | ||
| OSD Bid Form TRD01 FY27 Asbestos Abatement POCASSET CCI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Abatement - Pocasset MHC 830 County Rd., Pocasset, MA 02559 TRD01 Category 5: General Contracting Services
Scope of Work Statement
AWARDING ENTITY
Awarding Entity: Department of Mental Health Southeast Area Agency Name and Address: Pocasset CMHC 830 County Road, Pocasset, MA 02559
CONTACT INFORMATION
Name and Title: Travis Sheppard, Facility Director, Pocasset MHC Phone: 508-564-9627 M-F 8am-4pm Email Address: Travis.L.Sheppard@mass.gov
CONTRACT AND BIDDING INFORMATION
Project Name: Asbestos Abatement Pocasset CMHC
Project Description (brief overview): Asbestos abatement of insulation for a small area on a HVAC duct. Also, the asbestos abatement of maintenance shop office and bathroom flooring.
Mandatory Site Visit: September 2nd or 3rd between 8:30am – 10:00am.
Bid Deadline: Sept 10, 2026, at 2:00pm OSD Trade Category: TRD01 Category 5: General Contracting Services.
SCOPE OF WORK
This project is to perform asbestos remediation, disposal, and generator waste disposal shipping.
Work areas include:
· Small area on two sides of a HVAC duct. This area shall be large enough to allow the installation of a duct access panel on both the bottom and one side of the duct.
· 535 square feet of flooring in a maintenance shop office area.
· 30 square feet of flooring in a maintenance shop bathroom.
· Flooring base cove areas are included.
Note 1: The contractor is responsible for verifying all above-mentioned measurements and descriptions.
Note 2: The contractor is responsible for identifying all interferences such as, and not limited to, drop ceiling tiles and support grids.
Note 3: The facility staff will be responsible for removing any furniture and toilet in the maintenance shop area for clear access.
Note 4: The facility staff will be responsible for hiring an independent contractor to perform the air quality monitoring and reports for this project.
PROJECT SCHEDULE
Planned Start Date: TBD. This is expected to start in Sept or October of 2026 as agreed between all parties. Duration of this project is expected to be 2-3 days.
ATTACHMENTS
The following sections are included in the appendices and are part of this contract:
| X | Prevailing Wage Rate Requirements |
| X | OSD Bid Form |
Sample Scope of Work Statement Page 2 of 2