This is a Task Group Instruction (TGI) document for the USS HIGGINS (DDG-76) that outlines structural and rigging work required for the installation of S/A 31047K Battle Force Tactical Network Resilient Command, Control, and Communications System Enhancement (BRSE) Data Management Hardware.

The work encompasses four primary deliverables: (1) crane and rigging services for unshipping the BFTN Server Rack Unit and shipping the BRSE Data Management Rack AN/USQ-246A(V)1 in the Communications Center (2-126-1-C); (2) structural work including removal of existing BFTN server rack foundations and installation of new foundations; (3) electrical mounting equipment installation consisting of one mounting bar for battle lantern, two mounting studs for junction boxes, and four mounting studs for ANDS fiber optic junction box; and (4) installation of one bonding stud for the BRSE Data Management Rack Unit using steel material with a 1/8-inch fillet weld (PT1S.1 per MIL-STD-22D). Work locations include the Communications Center, Auxiliary Machinery Room No. One (4-126-0-E), and Combat Information Center (1-126-0-C). The materials list includes structural angles, plates, bimetallic transition joints, aluminum alloys, fasteners, adhesives, insulation, and composite false deck panels. The document identifies potential lead hazard as an initial condition and references multiple related TGIs (38KB344120U01, 38KB344120R01, 38KB344120U02, 38KB344120R02) for coordinated removal and installation activities. SRF-JRMC provides government-furnished materials and specified services including crane operations, electrical utilities, gas-free inspections, and quality assurance inspections, with work integration managed under Job Order 38KB344120.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: CMPT 2-126-1-C MS A 6 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

DDG-76 USS HIGGINS 13011 KB3

CU PHASE TITLE:

(RE) F/O – S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTL

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

TETSUYA UEMATSU 231A 315-243-9943 08-JUN-2026

APPROVED BY: CODE PHONE DATE

YUUJI NAKAMURA 231A 315-243-6041 08-JUN-2026

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: CMPT 2-126-1-C MS A 6

FOUO

SHIP: DDG-76 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-4 J-1 M1-3

1. SCOPE/PURPOSE

1.1 Title: S/A 31047K, Structural and Rigging Work for S/A 31047K Battle Force Tactical Network Resilient Command, Control, and Communications System Enhancement (BRSE) Data Management Hardware Installation;

accomplish

1.2 Location of Work:

1.2.1 Communications Center (2-126-1-C)

1.2.2 Auxiliary Machinery Room No. One (4-126-0-E)

1.2.3 Combat Information Center (1-126-0-C)

1.3 Identification:

1.3.1 Quantity (One Lot), Crane and Rigging Service for Unshipping of BFTN Server Rack Unit and Shipping of BRSE Data Management Rack AN/USQ-246A(V)1 in 2-126-1-C

Remarks: See 2.4 for location detail

1.3.2 Quantity (One Lot), Structural Work for S/A 31047K BRSE Data Management Hardware Installation

Remarks: See 2.3 for material and detail

1.3.3 Quantity (One Lot), Electrical Mounting Equipment for S/A 31047K in 2-126-1-C

1.3.3.1 Quantity (One EA), Mounting Bar for Battle Lantern

Material: Steel Remarks: See Sheets 6 and 7 Item No. 504 of 2.4 for detail

1.3.3.2 Quantity (2 EA), Mounting Stud for Junction Box

Material: Steel Remarks: See Sheets 6 and 7 Item No. 505 of 2.4 for detail

1.3.3.3 Quantity (4 EA), Mounting Stud for ANDS Fiber Optic Junction Box No. 2

Material: Steel Remarks: See Sheets 6 and 7 Item No. 503 of 2.4 for detail

1.3.4 Quantity (One EA), Stud of Bonding for BRSE Data Management Rack Unit in 2-126-1-C

Material: Steel Weld Joint Design: PT1S.1 of MIL-STD-22D Fillet Weld Size: 1/8 Inch

1.4 Security Classification:

FOUO

SHIP: DDG-76 CHG/VER: 0/0

1.4.1 Spaces – 1.2.1 and 1.2.3

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.6 Contractor work start date: Refer to TGI POP List

1.7 Contractor work completion date: Refer to TGI POP List

2. REFERENCES:

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 DWG 184-

8990899

AN/USQ-246A(V)1 BRSE DMGT

FDN MODS & ML

A Y AL

L

4 DWG 441-

8990900

AN/USQ-246A(V)1 BRSE DMGT

CNSLD ELEC & ML

A Y AL

L

5 DWG 100-

6218914

UNIT STRL ARR DWG ASSY UNIT

W Y 3-

6 DWG 100-

6218913

UNIT STRL ARR DWG ASSY UNIT

W Y 3-

3. APPENDICES:

3.1 Appendix “J” TGI Job Summary Information Sheet

3.2 Appendix "M" TGI Material List

3.3 Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Provide support work listed in 1.3.1. See 5.6.3.

5.2 Accomplish the structural work listed in 1.3.2 in accordance with 2.3, using 2.4 and 2.5 for guidance.

5.2.1 Remove each existing foundation of BFTN server rack unit from turkey foundation.

5.2.2 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A and C Lines One through 7.

5.3 Remove existing, and install new each electrical mounting equipment listed in 1.3.3, using 2.4 and 2.5 for guidance. See 5.6.4 through 5.6.7.

5.3.1 Retain removed mounting bar listed in 1.3.3.1 for installation.

5.3.2 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A Lines One through 7.

5.4 Install each new stud of bonding listed in 1.3.4, using 2.6 for guidance. See 5.6.7.

5.4.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A Lines One through 7.

FOUO

SHIP: DDG-76 CHG/VER: 0/0

5.5 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.

5.6 Notes:

5.6.1 Planner: Code 231A T. Uematsu, 243-9943

Planner: Code 233 H. Kosaka, 080-9350-1454 Planner: Code 233 K. Uchimura, 080-9350-1432

5.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.6.3 Removal of BFTN server rack unit and installation of BRSE data management rack AN/USQ-246A(V)1 in 2- 126-1-C will be covered by TGI No. 38KB344120U01 and 38KB344120R01 (SRF-JRMC TGI).

5.6.4 Removal and installation of battle lantern and junction box on mounting equipment listed in 1.3.3.1 and 1.3.3.2 will be covered by TGI No. 38KB344120U02 and 38KB344120R02 (SRF-JRMC TGI).

5.6.5 SRF-JRMC Shop X51EO will direct exact location for installation of mounting equipment listed in 1.3.3.1 and 1.3.3.2.

5.6.6 Removal and installation of junction box on mounting equipment listed in 1.3.3.3 will be covered by TGI No.

38KB344120U01 and 38KB344120R01 (SRF-JRMC TGI).

5.6.7 SRF-JRMC Shop X67O will direct exact location for installation of mounting stud and stud of bonding listed in

1.3.3.3 and 1.3.4 which is not designated in referenced drawing.

5.6.8 JCN EXSA-ZCK6 is related to this TGI.

5.7 Government Furnished Material (GFM):

5.7.1 SRF-JRMC will provide GFM listed in Appendix ”M”.

5.8 SRF-JRMC will provide the following service work: (TGI No. 38KB344120S02).

5.8.1 [C740] Crane and crane rigging service.

5.8.2 [X99E] Utility service, electrical.

5.8.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

5.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.8.6 [C133] QA inspection for (G) symbol(s).

FOUO

J-1

SHIP: DDG-76 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

13011 CMPT 2-126-1-C MS A 6 0

CU PHASE TITLE:

(RE) F/O – S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTL

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

FUJINO ,YUUKI 2-126-1-C 2 126 S

JO: KO: TOTAL MAN HRS: TOTAL DURATION: PLANNING ACCEPTANCE:

38KB344120 A01

TOTAL MAT’L COST

CU PHASE DESCRIPTION:

The purpose of this TGI is to accomplish structural and rigging work for S/A 31047K Battle Force Tactical Network Resilient Command, Control, and Communications System Enhancement Data Management Hardware Installation

Location of Work:

Communications Center (2-126-1-C) Auxiliary Machinery Room No. One (4-126-0-E) Combat Information Center (1-126-0-C)

FOUO

M-1

SHIP: DDG-76 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

13011 CMPT 2-126-1-C MS A 6 0

CU PHASE TITLE:

(RE) F/O – S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTL

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

38KB344120 A01

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M ANGLE,STRUCTURAL,

ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 9520 010239272 NA 4 N 61395314 20/FT

002 M PLATE,ME, ORDERED FOR

KTR

ORIG: C231, T.UEMATSU, 243-

(2FT X 6FT)

9B 9515 002243086 NA 4 N 61395285 12/SF

003 M ANGLE,ST, ORDERED FOR

KTR

ORIG: C231, T.UEMATSU, 243-

9B 9520 002777310 NA 4 N 61395286 10/FT

004 M ANGLE, STRUCTURAL, ANGLE,

STRUCTURAL, 4" X 3" X

3/8"THK, STEEL, MIL-S-22698

GRADE AH-36

ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 9520 LL9306614 NA 4 N 61407431 10/FT

NOTES:

FOUO

M-2

SHIP: DDG-76 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

005 M ANGLE,STRUCTURAL,

ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 9520 013433281 NA 4 N 61395316 6/FT

006 M BAR,BIMETALLIC, BAR,

BIMETALLIC TRANSITION

JOINT, ALUMINUM / STEEL,

3"W X 3/4"THK, CONSISTS OF

1/8" ALUMINUM 5456 H117 OR

5086 H32 BONDED TO 1/4"

ALUMINUM 1100 BONDED TO

3/8" STEEL ASTM A516 GR-55.

BIW CAT: 57001-046.

ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 9510 LL9309320 NA 4 N 61407405 2/FT

007 M ANGLE, STRUCTURAL, ANGLE,

STRUCTURAL, 2-1/2" X 2" X

1/4" THK, ALUMINUM ALLOY

5456 H111, ASTM B221 (SAE-

AMS-QQ-A-200/7).

*REQUIRED 10FT LENGTH X

3EA

BIW CAT#: 56107-282 P/N:

ASTM B221 ALLOY 5456 H111

(QQ-A-200/7 5456 H111)

ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 9540 LL4573214 NA 4 N 61407447 30/FT

008 M ANGLE,STRUCTURAL,

ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 9540 008922352 NA 4 N 61395324 10/FT

009 M TAPE, 4", ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9D 8305 LL4820191 NA 4 N 61397500 1/RO

010 M SCREW,MA, ORDERED FOR

KTR

ORIG: C231, T.UEMATSU, 243-

9B 5305 014237156 NA 4 N 61405002 40/EA

011 M FERRULE, ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9B 5320 LL9006423 NA 4 N 61397501 40/EA

012 M PANEL, FALSE DECK, PANEL,

FALSE DECK, COMPOSITE,

CO-CURED BALSA CORE AND

PHENOLIC COMPOSITE,

WITH LONMAT FLOORING

WEAR SURFACE,

SPEC: MIL-PRF-32664, TYPE I,

CLASS 1, FORM 1, GROUP 1,

AREAL WEIGHT: 2,

SIZE: 48" X 100" X 0.560-

0.575"THK,

COLOR: SEMI-GLOSS BLUE

(M05.6 TYPE I BLUE MARBLE),

BIW CAT#: 57204-001,

9B 2090 LL9608383 NA 4 N 61407408 1/SH

FOUO

M-3

SHIP: DDG-76 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

013 M ADHESIVE, ORDER FOR KTR

ORIG: C226 R.FUKUDA, 070-

7787-1968

9B 1680 014313607 NA 4 N 61395287 4/EA

100 M INSULATI, ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9Q 5640 013713263 NA 4 N 3/SH

101 M SOUND CO, ORDERED FOR

KTR

ORIG: C231, T.UEMATSU, 243-

9Q 5640 013715238 NA 4 N 61395288 5/SH

102 M INSULATI, ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9Q 5640 LL4808710 NA 4 N 61397502 5/SH

103 M INSULATI, ORDERED FOR KTR

ORIG: C231, T.UEMATSU, 243-

9Q 5640 LL4808709 NA 4 N 61397504 3/SH

104 M TAPE,TEX, ORDERED FOR

KTR

ORIG: C231, T.UEMATSU, 243-

9B 8315 002671632 NA 4 N 61395289 2/RO

105 M ADHESIVE, ORDERED FOR

KTR

ORIG: C231, T.UEMATSU, 243-

9B 8040 002738708 NA 4 Y 61395290 1/GL

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-76 CMPT 2-126-1-C MS A 6

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

38KB344120 A01

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

DDG-76 CMPT 2-126-1-C MS A 6