Attachment II Proposal Sheet Generator CLIN 0003.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
USS HIGGINS 6C1 SRA BUNDLE 7
Solicitation number
N6264926RA066
Issued by

About this file

This is a Proposal Sheet Generator template for pricing submission on Solicitation N6264926RA066 for USS HIGGINS (DDG-76) ship alteration work. The template is structured as an Excel-based spreadsheet designed to calculate and summarize proposed costs across multiple Contract Line Items (CLINs): CLIN 0001 for one Task Group Item (TGI) and CLIN 0002 as a Growth CLIN with a 7% growth factor. Offerors must populate orange-highlighted cells with labor hour breakdowns, material costs, and Other Direct Costs (ODCs) denominated in Japanese Yen (JPY). The template automatically links summary totals from individual TGI tabs to prevent manual data entry errors.

The work scope covers Ship Alteration 31047K, which involves accomplished structural and rigging work for base damage hardware installation aboard USS HIGGINS. The template requires detailed in-house and sub-contractor labor hour breakdowns by skill category (Structural, Installation, Welding, Sheet Metal, Riggers, Painter, Electrical, Plumbing Fitter, QA, and Others), along with personnel allocation, hours per day, and number of days worked. Proposals must be submitted by August 6, 2026 at 10:00 AM Japan Standard Time. Offerors must hold an active U.S. Maritime Safety and Repair Act (MSRA) or American Bureau of Repairs (ABR) certification as a Prime Contractor and be duly authorized to conduct business in Japan. The Period of Performance is October 5, 2026 through May 11, 2027, with work to be performed at Commander Fleet Activities Yokosuka Naval Base. The solicitation is administered by NAVSUP Fleet Logistics Center Yokosuka.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA066CLIN 0001(1 TGIs)0¥0¥0¥0¥0
SHIP/VESSEL NAME:USS HIGGINS (DDG-76)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
DESCRIPTION:S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTLTotal for All CLIN0¥0¥0¥0¥0
Total WI/TGI (Specify)1Total Evaluated Price¥0
Growth CLIN %7.00%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.Work Item/TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138KB344120-A01S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTL000¥0¥0¥0¥0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_38KB344120-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG-76) - S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTL1_38KB344120-A01 SUMMARY
SOLICITATION #:N6264926RA066
Work Item/TGI #:1_38KB344120-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:S/A 31047K, ACCOMP STRL & RGNG WK FOR S/A 31047K BRSE DMGT HW INSTL00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .