About this file
This is a draft Statement of Work (SOW) from the USDA Forest Service for cleaning and inspection services of two potable water storage tanks at the Cass Job Corps Center in Ozark, Arkansas. The tanks are cast-in-place concrete structures partially embedded below grade, with capacities of 20,000 and 30,000 gallons, accessed through 24" x 24" hatches.
The contractor must provide all labor, materials, equipment, and supervision for thorough cleaning of sediment/algae, interior/exterior inspections, leak detection, and disinfection per ANSI/AWWA Standard C652.19. Key requirements include documenting structural defects, coating conditions, and safety systems through photos/videos/sketches; developing detailed inspection reports referencing OSHA/EPA/AWWA standards; and providing repair recommendations with cost estimates. The contractor must have 5+ years of water tank inspection experience, and if divers are used, they must be certified and meet specific OSHA requirements. The period of performance is 30 days, with work conducted Monday-Friday between 7:00 AM - 4:00 PM Central Time. The tanks are experiencing moisture issues and potential leakage requiring investigation as part of a larger water loss problem in the campus distribution system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis -Cass JCCC Tank Cleaning and inspection.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Rough Draft
Contents General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
11.0 Attachments
Project Cass Job Corps Center – Water Tank Cleaning and Inspection
General Information
1.0 Scope of Work
The Washington Office PPS Job Corps Support Branch has a requirement for a contractor to provide cleaning services for two potable water storage tanks located at the Cass Job Corps Center. The Government is looking to award a Firm Fixed Price type contract to a single contractor who offers the best value to the Government, price and other factors considered. The tanks are cast-in-place concrete partially embedded below grade with capacities of approximately 20,000 and 30,000 gallons.
The tanks will be drained and take out of service prior to the arrival of the Contractor, if leak detection best practices requires the tanks to be filled the Contractor shall pre-coordinate with the COR and Center staff.
Access to the tank will be through a minimum hatch size of 24” x 24”. Unobstructed road access will be provided.
The contractor shall furnish all labor, materials, equipment, tools, transportation, supervision necessary to perform their work required for the inspection and cleaning of the potable water tanks at Cass Job Corps Center in accordance with the specifications and provisions contained herein.
This project is located at the Cass Job Corps Civilian Conservation Center. The address is 21424 North Highway 23, Ozark, AR 72949.
2.0 Background
Job Corps is a national residential training and employment program administered by the Department of Labor to address the multiple barriers to employment faced by disadvantaged youth throughout the United States. The Economic Opportunity Act of 1964 originally established Job Corps; current authorization for the program is Title I, Chapter 6, Subtitle C, of the Workforce Investment Act of 1998.
Job Corps provides educational and occupational skills training and support services to youth between 16 and not yet 25 years of age. The unique combination of services provided in the Job Corps program is intended to better prepare youth to obtain and hold gainful employment, pursue further education or training, or satisfy entrance requirements for careers in the Armed Forces.
The Workforce Investment Act (WIA) mandates that Job Corps graduates be provided with transition, placement, and support services for one year following initial placement. WIA also requires that the placement status and wages of graduates be measured at six- and twelve-month intervals after the graduates are placed, and that Job Corps operator be evaluated in part on the basis of these performance measures.
The U.S. Department of Agriculture Forest Service operates 24 Job Corps Center nationally, through an interagency agreement with the Department of Labor.
2.1 System Background
The existing concrete tanks were previously used as water treatment and storage tanks for the water system drawing surface water from the Mulberry River. The center is now served by a municipal system operated by the Watalula Water Users Association. The tanks are still utilized to provide adequate volume and flow for combined potable and fire protection uses. The campus distribution has had large water volume losses in recent months and is actively working on identification and correction of leaks through system isolation and
Rough Draft
GaryDurham Cross-Out
GaryDurham Cross-Out monitoring. The tanks were identified as potential sources of some of the leakage as moist spalls are present near grade, at the time of writing this SOW, volume loss via leakage from the tanks has not been quantified.
Contractor Requirements
3.0 Technical Requirements / Tasks
A. The tanks will be isolated from the campus distribution system prior to beginning cleaning and inspection work. Prior to inspecting interior surfaces, the Contractor shall thoroughly clean any accumulated sediment, algae growth, or other deleterious materials that should be removed for sanitary purposes or due to obstruction of surfaces to be inspected. Waste material shall be disposed of legally off of government property.
B. Interior and Exterior inspections will review structure, sanitary, safety, security and any installed coating conditions. Reporting will be provided based on water tanks inspection criteria, referencing applicable OSHA, EPA, AWWA, Arkansas Department of Health inspection guidance https://healthy.arkansas.gov/wp-content/uploads/Water_Storage_Tank_Inspection_Guidance.pdf and NFPA requirements. Minimum items examined will include inlets and outlets, ladders, shell, roof, vents, walls and floors, baffles/support walls, sumps, manways, welds, joints and seams, foundation, anchors, safety systems, hatches, liners and coatings, telemetry, sediment depths, external overflow, and plumbing.
C. Inspectors shall have training and experience specific to concrete structures and the requirements for community potable water systems. Special emphasis shall be placed on leak detection, tank structural deficiencies, and condition/adhesion of any installed coatings or liners.
D. Defects shall be documented thoroughly with notes, photos, videos and sketches to identify specific locations, extent of defects (measurements and quantity).
E. The contractor shall disinfect the tanks in accordance with ANSI/AWWA Standard C652.19 upon completion of inspection work.
F. If tank full or drawdown cleaning and inspection is conducted based upon Contractor’s proposal:
a. If divers are utilized:
i. The Contractor shall demonstrate compliance with OSHA requirements of 29 CFR Part 1910, Subpart T or Subpart T Appendix B.
ii. A dive operations plan must be submitted prior to dive operations, if the plan changes in mission, depth, personnel, or equipment provide revised plan. The plan must be inclusive of all elements of FSH4209.11 Chapter 16.2 (see attachments).
iii. The Contractor shall hold a pre-dive conference with the CO or their designated representative.
iv. The Contractor shall submit and electronic copy of all dive operation plans, dive logs, any dive related accidents to the Contracting Officer prior to contract closeout.
G. The contractor shall furnish all labor, tools, and deliverables. It is the sole responsibility of the contractor to verify that the Inspection and cleaning are fully completed, and any deficiencies or repairs needed be included in a written report with correction instructions.
H. Adherence to all the following shall be maintained at all times:
a. Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 -
General Industry.
b. ANSI/AWWA Standard C652-19.
I. Obtaining all required permits and scheduling all applicable inspections.
J. All inspections must be successfully signed off and completed prior to receipt of final payment.
K. All inspections shall be performed in accordance with manufacturer's guidance and the state of
Arkansas’s regulations.
L. Possess adequate liability insurance and proper license to perform all work stated herein.
M. Notifying the COR of all identified issues no later than 24 hours of discovery.
N. All supplies and materials needed for this project will be furnished by the Contractor.
O. Coordinate service schedule with the COR and Cass Center POC prior to gaining access to any areas located on the Center.
P. Keep work area(s) clean, neat, picked up and safe to include signs, cones, gates, tape, rope to discourage access by employees, staff and students assigned to the Cass Center.
Q. All trash shall be picked up and removed at the end of each workday.
4.0 Government Furnished
There are no Government Furnished items associated with this project.
5.0 Deliverables / Schedule
Prior to Start:
Safety Plan.
Work Schedule Dive Plan Verifiable Certificates of Insurance with current dollar limits.
Verifiable licenses with expirations dates.
Written designee of contractor’s emergency contact and contact information
After inspection, furnish the following:
A PDF report of findings, violations, and actions taken. Report will include photos of findings and will comply with State of Arkansas Requirements. Any violations noted shall reference the requirements that are being violated.
Video recording of inspection, transferred to USFS Cloud storage site.
Repair and/or Replacement recommendations must also be included with the report and must include cost estimates for these recommendations. Recommendations included in the service reports may be used in the future by the Government in its determinations to repair and/or replace equipment as needed, and subject to the availability of funds.
The period of performance for this work is 30 days.
Normal operational hours are from 07:00 am to 4:00 PM Central Time, Monday through Friday.
6.0 Travel
Not Applicable
7.0 Contractor’s Key Personnel
Contractor shall have a minimum of 5 years of experience in commercial potable water tank cleaning and inspection. If used, divers shall be certified from an accredited commercial dive school and be training in First Aid, CPR and have an annual medical examination to determine fitness for diving.
8.0 Security Requirements
Not Applicable
9.0 Data Rights
Not Applicable
10.0 Section 508 – Electronic and Information Technology Standards
Not Applicable
11.0 Attachments
A. Site Map B. Photos C. FSH 4209.11 Chapter 16 D. 2015 Tank/Distribution Design LayoutRough Draft
Attachment A. Site Map
Cass Water Tank Photos
Figure 1: Corner Spall w/ Adjacent Efflorescence.
Attachment B. Photos
Cass Water Tank Photos
Figure 2: Vertical Crack w/ Efflorescence and Moss Growth
Attachment B. Photos
WO AMENDMENT 4209.11-2012-1
EFFECTIVE DATE: 03/27/2012
DURATION: This amendment is effective until superseded or removed.
4209.11_10
FSH 4209.11 - WILDLIFE, FISH, WATER, AND AIR RESEARCH HANDBOOK
CHAPTER 10 - DIVING AND SNORKELING SAFE PRACTICES
1. Appendix 2, AAUS Medical Evaluation Of Fitness For Scuba Diving Report.
15.5 - Physician's Written Report
Appendix 2, AAUS Medical Evaluation of Fitness for Scuba Diving Report, to the individual.
16 - CONTRACT DIVING OPERATIONS
16.1 - General
1. Contractors shall demonstrate compliance with OSHA requirements of 29 CFR part 1910, Subpart T or 29 CFR part 1910, Subpart T, Appendix B.
2. Contracting officers or contracting officer representatives shall have a working knowledge of OSHA requirements of 29 CFR part 1910, Subpart T and 29 CFR part 1910, Subpart T, Appendix B to monitor contract diving operations or consult with regional diving safety officer.
3. Any failure to comply with the requirements of section 11 will be cause for suspension or termination of the contract.
16.2 - Dive Operations Plans
1. Dive operation plans must be developed and implemented by the contractor for each separate diving operation. As a minimum, the plan must contain the following:
a. Names and duties of dive team members, including diving supervisor.
b. Date, time, and dive location of the diving operation.
c. Diving mode to be used (for example, SCUBA or surface supplied air), giving a description of the backup air supply.
d. Nature of work to be performed by the divers and requirements for inspection.
e. Surface and underwater conditions, including visibility, temperature, thermal protection, and currents.
f. Safety procedures for contract.
g. Maximum depth and bottom time (altitude adjustments to dive tables must be accomplished for dives made at altitudes of 1,000 feet (300 meters) or more above sea level).
h. Emergency management plan, including emergency procedures, means of notification, telephone numbers (for ambulance, doctors, and recompression chambers), and location of evacuation routes, nearest U.S. Coast Guard rescue center, and emergency assistance.
Attachment C. FSH4209.11 Ch 16
DURATION: This amendment is effective until superseded or removed.
4209.11_10
FSH 4209.11 - WILDLIFE, FISH, WATER, AND AIR RESEARCH HANDBOOK
CHAPTER 10 - DIVING AND SNORKELING SAFE PRACTICES
i. Lockout/tag out procedures, including procedures for dealing with differential water pressures due to unequal water elevations (when applicable).
j. Equipment certification, procedures, and checklists and requirements for special tools and equipment.
k. The statement, If for any reason the dive operations plan is altered in mission, depth, personnel, or equipment, the contracting officer shall be contacted and shall review any revision prior to actual operation.
2. The dive operation plans must be submitted to the unit diving safety officer prior to commencement of diving operations.
3. A copy of the diving operation plans must be at the diving location whenever diving is conducted.
4. The dive operation plans must be made available to the government contracting officer.
DURATION: This amendment is effective until superseded or removed.
4209.11_10
FSH 4209.11 - WILDLIFE, FISH, WATER, AND AIR RESEARCH HANDBOOK
CHAPTER 10 - DIVING AND SNORKELING SAFE PRACTICES
16.3 - Pre-Dive Conferences and Briefings
A pre-dive conference must be held on site with the lead contract diver and a representative of the contractor with sufficient authority to implement any requirements made by the government contracting officer.
16.4 - Recordkeeping and Reporting Requirements
The contractor shall submit two copies of all dive operations plans, dive logs, and diving related accident reports to the contracting officer for inclusion in the contract file. The contracting officer submits a copy to the unit dive safety officer.
Attachment D. 2015 Tank and Distribution Design Layout
’ 7
25’ 7” 21’ 3” 21’ 3”
Attachment D. 2015 Tank and Distribution Design LayoutRough Draft
| Attachment C. FSH4209.11 Ch 16.pdf |
| 15.5 - Physician's Written Report |
| 16 - CONTRACT DIVING OPERATIONS |
| 16.2 - Dive Operations Plans |
| If for any reason the dive operations plan is altered in mission, depth, personnel, or equipment, the contracting officer shall be contacted and shall review any revision prior to actual operation. |
| 16.3 - Pre-Dive Conferences and Briefings |
| 16.4 - Recordkeeping and Reporting Requirements |
| Attachment D. 2015 Tank and Distribution Design Layout.pdf |
| ADP8F94.tmp |
| Slide Number 1 |
File details come from the government source that posted it. Updated .