SOW Suction Drum Replacement Parts.pdf

PDF 187 KB Posted

Attached to
Suction Drum Replacement Parts for Super Orlof Intaglio III Press
Solicitation number
2031ZA26N00041
Issued by

About this file

This is a Statement of Work (SOW) for suction drum replacement parts for the Bureau of Engraving and Printing (BEP) Western Currency Facility located in Fort Worth, Texas.

The contractor shall furnish new, OEM-certified replacement components for the suction cylinder assembly specific to SOI-III equipment. Required parts include: suction roller complete, tooth belt gear, toothed belt power-grip, spacer disc, two locking rings, feather key, seal ring, and taper pin. All parts must be free from defects, compatible with existing equipment configuration, and delivered with traceability documentation. The contractor must provide OEM parts documentation including part numbers, certificates of conformity, packing lists, user manuals, maintenance documents in English, engineering drawings, and operation manuals. A two-year warranty on all components and parts shall commence after delivery and acceptance, with warranty certification required before the warranty period begins. The contractor must also provide a point of contact for the purchase.

Delivery of all parts is required 25 weeks after contract award, with parts shipped to the Bureau of Engraving and Printing Western Currency Facility, 9000 Blue Mound, Fort Worth, TX 76131. The contract includes a base requirement plus three optional quantities for additional suction drum assemblies and associated parts, with an anticipated period of performance spanning September 2026 through September 2029. OEM parts documentation is due 25 weeks after receipt of order, and warranty documentation is due after full acceptance of delivered parts, both to be submitted to Tsega.emishaw@bep.gov in PDF, Excel, or Word format.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 06/09/2026

Statement of Work

Suction Drum Replacement Parts

SECTION I: Background

1.1 The Bureau of Engraving and Printing (BEP) operates specialized banknote production equipment that requires reliable and continuous performance to support mission-critical currency manufacturing operations. The existing suction cylinder assembly at the Fort Worth, Texas Facility (WCF) has reached a condition requiring replacement to maintain operational efficiency, equipment reliability, product quality, and production availability.

To restore full operational capability, replacement of the suction roller assembly and associated mechanical components that are specific to SOI-III is required. The necessary removal, replacement, align, test, and assembly will be completed in-house by Electro- Machinist Subject Matter Experts in accordance with manufacturer specifications and operational requirements.

BEP intends to include up to three (3) additional Suction drum assemblies and associated parts as option quantities.

SECTION II: Purpose

2.1 Product, Service or Outcome Needed.

• Replace the existing suction cylinder assembly with a Suction Roller.

• Restore equipment performance and reliability.

• Minimize downtime and production disruptions.

2.2 Scope of the Product, Service, or Outcome.

The Contractor shall furnish all replacement components, spare parts, and incidentals necessary to complete the replacement of the suction cylinder assembly.

SECTION III: Technical Requirements/Tasks/Outcomes

3.1 Provide the following OEM replacement parts:

A. Suction Roller Complete B. Tooth Belt Gear C. Toothed Belt Power-Grip D. Spacer Disc E. Locking Ring F. Locking Ring G. Feather Key

Version 06/09/2026

H. Seal Ring I. Taper Pin

3.2 Parts: All supplied parts shall be new, OEM-certified, free from defects, compatible with existing equipment configuration, and delivered with traceability documentation

SECTION IV: Documentation

4.1 Documentation: OEM Parts Documents shall include part numbers, certificates of conformity, and packing lists. The contractor shall provide user manual plus maintenance document in English. The documentation shall include engineering drawings, operation, and maintenance manuals, and purchase component information.

SECTION V: Warranty

5.1 Warranty: Contractor shall provide a two-year warranty on components and parts for the system. Warranty period shall begin after the delivery and acceptance of the parts being procured. Contractor should provide warranty certification for all components/parts before warranty begins. Contractors shall also provide a point of contact for the purchase.

SECTION VI: Deliverables

SECTION VII: Special Delivery Instructions

8.1 Performance / Delivery Period. Contractor shall deliver all parts 25 weeks after contract award. The period of performance for this contract includes three (3) options for additional parts. The anticipated period of performance is September 2026 to September 2029.

8.2 Place / Location of Performance / Delivery

The parts shall be delivered to the following locations:

Bureau of Engraving and Printing Western Currency Facility 9000 Blue Mound Fort Worth, TX 76131

END OF SECTION

SOW

Paragraph #

Deliverable Due Date Deliverable Recipient

Deliverable Format

4.1 OEM Parts

Documentation

25 weeks after receipt of order

Tsega.emishaw @bep.gov

PDF, Excel, word document

5.1 Warranty After full acceptance of

delivery parts

Tsega.emishaw @bep.gov

PDF, Excel, word document

File details come from the government source that posted it. Updated .